Permanent Occupancy | | | 1/31/2017 | | DONE |
|
|
|
|
BLD-Final | 1/27/2017 | 1/30/2017 | 1/30/2017 | P | PASS |
Jim Storey
|
|
|
cory Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection passed/complete
|
Temporary Occupancy | 1/23/2017 | 4/23/2017 | 1/23/2017 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-temp c of o extension request was approved good thru 3/31/17
|
Telephone call | | | 1/20/2017 | | DONE |
|
|
|
1/20/17-called Corey-he will contact Carmen for an extension rquest to Jason B for the Temp C of O
|
BLD-Aging Inspection | 12/27/2016 | 12/27/2016 | 12/27/2016 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 10/25/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
FIRE-Final Inspection | 10/27/2016 | 10/28/2016 | 10/28/2016 | A | PART |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current insepction tags. Partial final for life fire safety complete, permit will stay in issued status until clubhouse FIR permit is complete, all remote fire panels report to clubhouse panel. After clubhouse FIR permit is finalized then this permit can be finalized.
|
Temporary Occupancy | 10/28/2016 | 1/26/2017 | 10/28/2016 | | DONE |
Brittany Hill
|
|
|
|
FIRE-Final Inspection | 10/25/2016 | 10/27/2016 | 10/27/2016 | P | CANC |
Jim Page
|
|
|
Inspection request rescheduled for 28OCT2016 per conversation with Corey, Phone #: ###-####.
|
FIRE-Final Inspection | 10/27/2016 | 10/27/2016 | 10/27/2016 | A | CANC |
Jim Page
|
|
|
Corey ###-####
|
BLD-Aging Inspection | 10/7/2016 | 10/7/2016 | 10/10/2016 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Ceiling Grid Inspection | 7/5/2016 | 7/5/2016 | 7/7/2016 | P | PASS |
Phil Shearer
|
|
|
First floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Phil Shearer
|
|
|
First floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | CANC |
Dave Hannah
|
|
|
First floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith out of time
|
BLD-Conference | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | PART |
Jim Storey
|
|
|
L1 bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmithc/n on site
|
BLD-Ceiling Grid Inspection | 6/29/2016 | 6/30/2016 | 6/30/2016 | A | PASS |
Jim Storey
|
|
|
Second floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Ceiling Grid Inspection | 6/28/2016 | 6/29/2016 | 6/29/2016 | P | PART |
Jim Storey
|
|
|
Second floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n
|
BLD-Other | 6/24/2016 | 6/27/2016 | 6/27/2016 | P | PART |
Jim Storey
|
|
|
Intown B1 South, Level 3 bathroom drop ceilings. Inspection requested via web by Kevin Honeycutt fire spk not done all others ok
|
BLD-Ceiling Grid Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PASS |
Jim Storey
|
|
|
Second floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PASS |
Jim Storey
|
|
|
First floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 5/23/2016 | 5/24/2016 | 5/24/2016 | A | PASS |
Jim Storey
|
|
|
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PART |
Jim Storey
|
|
|
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
|
BLD-Framing/Rough-in | 5/20/2016 | 5/20/2016 | 5/20/2016 | P | DEFR |
Jim Storey
|
|
|
Second floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmithout of time
|
BLD-Framing/Rough-in | 5/18/2016 | 5/19/2016 | 5/19/2016 | P | PASS |
Jim Storey
|
|
|
Re inspect third floor framing for cover Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Framing/Rough-in | 5/17/2016 | 5/18/2016 | 5/18/2016 | A | PART |
Jim Storey
|
|
|
Third floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted ok to rc
|
BLD-Wall Bracing | 2/12/2016 | 2/16/2016 | 2/16/2016 | A | PASS |
Jim Storey
|
|
|
Second and third floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Wall Bracing | 1/28/2016 | 1/29/2016 | 1/29/2016 | P | PASS |
Jim Storey
|
|
|
First floor sheer and roof sheer on south half Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
CHANGE STATUS TO (ISS) | | | 12/8/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/9/2015 | | 11/23/2015 | | PASS |
Carl Westfall
|
|
|
The District at Parkcenter - Intown B#1
|
Routing - PLAN CHECK | 11/16/2015 | | 11/23/2015 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 11/17/2015 | | 11/23/2015 | | PASS |
Carl Westfall
|
|
|
Jan Welch
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/23/2015 | | DONE |
|
|
|
plan mod only - do NOT re-issue
|
Plan Modification Accepted | | | 11/16/2015 | | DONE |
|
|
|
Drawings actually uploaded and ePlanReview workflow received.
|
Plan Reviewer's activity | | | 11/9/2015 | | DONE |
|
|
|
Uploaded some architectural drawings.
|
Plan Modification Accepted | | | 11/9/2015 | | DONE |
Christina Prado
|
|
|
Plan mod for foundation changes
|
BLD-Concrete | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Jim Storey
|
|
|
Concrete reinforcement inspection. Concrete to be onsite Monday at 7:30am. Inspection requested via web by Corey Hockersmith placed with si
|
CHANGE STATUS TO (ISS) | | | 10/7/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/1/2015 | 10/1/2015 | 10/5/2015 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/5/2015 | | DONE |
Christina Prado
|
|
|
*****DO NOT RE-ISSUE******
Fees for Plan Mod to add Dog Wash - $92.62 BLD fees, $415 SWR fees. ALl fees must be paid prior to re-issuance
|
Routing - PLAN CHECK | 10/1/2015 | | 10/2/2015 | | PASS |
Carl Westfall
|
|
|
2nd plan mod approved
|
Routing PW Sewer Rating | 10/2/2015 | | 10/2/2015 | | PASS |
Jennifer Bruner
|
|
|
(addition of a dogwash)
|
Routing - PLUMBING | 10/2/2015 | | 10/2/2015 | | PASS |
Bill VanDegrift
|
|
|
Bill Vandegrift (addition of a dogwash) per plans and ISPC
|
Plan Modification Accepted | | | 10/1/2015 | | DONE |
Christina Prado
|
|
|
PLan mod requested for changes to plumbing designs so that a dog wash station can be added per Jamie with IKEMIRE ARCHITECTS
|
CHANGE STATUS TO (ISS) | | | 9/2/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/21/2015 | | 8/25/2015 | | PASS |
Carl Westfall
|
|
|
Plan mod approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2015 | | DONE |
|
|
|
Plan mod fees on BLD14-01818 need to be paid- DO NOT re-issue
|
Plan Modification Accepted | | | 8/21/2015 | | DONE |
|
|
|
|
BLD-Foundation | 7/7/2015 | 7/9/2015 | 7/9/2015 | A | PASS |
Jim Storey
|
|
|
Concrete at 9:30am Phone #: ###-#### Inspection requested via web by Corey Hockersmith i on sites
|
BLD-Foundation | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Corey Hockersmithsouth side walls bar ok
|
BLD-Footing | 6/29/2015 | 6/30/2015 | 6/30/2015 | A | PASS |
Jim Storey
|
|
|
Pouring the remainder of exterior footing and all of interior courtyard stem wall. Phone #: ###-#### Inspection requested via web by Corey Hockersmith si on site /rebar ok
|
BLD-Footing | 6/24/2015 | 6/26/2015 | 6/26/2015 | A | PART |
Jim Storey
|
|
|
Concrete at 12:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmithplaced w/si
|
BLD-Footing | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | CANC |
Jim Storey
|
|
|
concrete on site at 12:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Footing | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PASS |
Jim Storey
|
|
|
concrete to be on site at 12:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
Print Occupancy Form | | | 4/2/2015 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 4/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/1/2015 | | DONE |
|
|
|
need gc form, updated values, ACHD receipt, RP
|
Routing - PLAN CHECK | 2/25/2015 | | 3/31/2015 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/31/2015 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/22/2014 | | 3/31/2015 | | PASS |
Carl Westfall
|
|
|
INTOWN BUILDING B - #1 (1st review done)
|
Routing Off Site - STRUCTURAL | 2/26/2015 | | 3/30/2015 | | PASS |
Carl Westfall
|
|
|
|
Routing PW Flood Plain | 2/26/2015 | | 3/30/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing - MECHANICAL | 3/10/2015 | | 3/10/2015 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 2/26/2015 | | 2/27/2015 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 2/26/2015 | | 2/27/2015 | | PASS |
Sarah Schafer
|
|
|
Sarah - Approved per DRH12-00038 and DRH15-00030.
|
Routing - PLAN CHECK | 2/25/2015 | | 2/26/2015 | | |
Carl Westfall
|
|
|
|
Plan resubmittals received | | | 2/25/2015 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 2/11/2015 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 1/26/2015 | | 2/11/2015 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing - PLAN CHECK | 1/23/2015 | | 2/11/2015 | | FAIL |
Carl Westfall
|
|
|
|
Routing - Design Review | 1/26/2015 | | 1/30/2015 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - MECHANICAL | 1/26/2015 | | 1/27/2015 | | FAIL |
Troy James
|
|
|
|
Routing - PLANNING | 1/26/2015 | | 1/26/2015 | | PASS |
Cody Riddle
|
|
|
|
Plan resubmittals received | | | 1/23/2015 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/13/2014 | | 12/29/2014 | | FAIL |
Carl Westfall
|
|
|
Waiting for the resolution of the structural issues.
|
Plan resubmittals requested | | | 12/29/2014 | | DONE |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 12/9/2014 | | 12/29/2014 | | FAIL |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 12/9/2014 | | 12/13/2014 | | PASS |
Carl Westfall
|
|
|
For the building review, the structural issues have not been resolved.
|
Plan resubmittals received | | | 12/11/2014 | | DONE |
Carl Westfall
|
|
|
|
Routing PW Street Lights | 12/9/2014 | | 12/10/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - MECHANICAL | 12/9/2014 | | 12/10/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 12/9/2014 | | 12/10/2014 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - PLANNING | 12/9/2014 | | 12/9/2014 | | FAIL |
Cody Riddle
|
|
|
One outstanding condition of approval:
Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)
Emailed applicant today. (Note: I updated activity from the master permit BLD14-01818.)
|
Plan resubmittals received | | | 12/8/2014 | | DONE |
Carl Westfall
|
|
|
|
Plan resubmittals requested | | | 11/7/2014 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/22/2014 | | 11/7/2014 | | FAIL |
Carl Westfall
|
|
|
Jan Welch
|
Routing - PLAN CHECK | 10/16/2014 | | 10/31/2014 | | FAIL |
Carl Westfall
|
|
|
Some items not resolved
|
Routing PW Drainage | 10/22/2014 | | 10/29/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 10/22/2014 | | 10/28/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 10-29-14
|
Routing - Erosion and Sediment | 10/22/2014 | | 10/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLANNING | 10/22/2014 | | 10/22/2014 | | FAIL |
Cody Riddle
|
|
|
|
Routing PW Street Lights | 10/22/2014 | | 10/22/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - MECHANICAL | 10/22/2014 | | 10/22/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Design Review | 10/22/2014 | | 10/22/2014 | | FAIL |
Sarah Schafer
|
|
|
|
Plan resubmittals received | | | 10/16/2014 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/2014 | | 8/27/2014 | | FAIL |
Carl Westfall
|
|
|
Since the submittal was incomplete, a structural review could not be done.
|
1st review completed | | | 8/23/2014 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/23/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2014 | | 8/23/2014 | | FAIL |
Carl Westfall
|
|
|
|
Routing - MECHANICAL | 8/11/2014 | | 8/14/2014 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 7/29/2014 | 7/29/2014 | 8/12/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 08-12-14
|
Route to Impact Fee Review | 7/22/2014 | 7/25/2014 | 8/1/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Drainage | 7/22/2014 | | 7/29/2014 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 7/22/2014 | | 7/28/2014 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - Addressing | 7/24/2014 | | 7/24/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing PW Sewer Design | 7/24/2014 | | 7/24/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Private Sewer System
|
Routing PW Solid Waste | 7/22/2014 | | 7/24/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Design Review | 7/22/2014 | | 7/24/2014 | | FAIL |
Sarah Schafer
|
|
|
|
Routing - PLANNING | 7/22/2014 | | 7/24/2014 | | FAIL |
Cody Riddle
|
|
|
|
Routing PW Sewer Rating | 7/22/2014 | | 7/23/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 7/22/2014 | | 7/23/2014 | | FAIL |
Evan Jenkins
|
|
|
|
Routing - PLANNING Land Div | 7/22/2014 | | 7/23/2014 | | PASS |
Dave Abo
|
|
|
|
Routing PW Street Lights | 7/22/2014 | | 7/23/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PUBLIC WORKS | 7/23/2014 | | 7/23/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 7/22/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 7/22/2014 | | 7/22/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 7/2/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Application received | | | 6/30/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 30 2014 6:44AM
|
First Notice | | 2/10/2017 | | | |
|
|
|
|