Permit Information
Permit NumberBLD14-01832
StatusFinaled
Name ESI
Site Address 501 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewNo
Description
(THE DISTRICT AT PARKCENTER - MAIL BUILDING) (The drawings are filed under permit BLD14-01818 in ePlanReview) This building does not have a fire sprinkler system. To construct a new 967 square foot one story building to be used as a mail building for the apartment occupants on this site. There will be a total of 288 mailboxes. Mailboxes for all ground floor units are required to be located within 15” and 48” above the floor. This building will not be heated or cooled. Work is to include interior nonbearing walls, exterior windows, exterior “hardi-board” siding, exterior manufactured stone, composite shingle roof coverings, mail boxes, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade, wood stud bearing walls, roof trusses, wood columns, wood beams, and shear walls. Special inspection may be required for soils, concrete, and wood. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 1/20/20172/13/2017 DONE
sent 2-14-17
First Notice 12/24/20161/10/2017 DONE
Mailed 1-11
FIRE-Final Inspection12/12/201612/14/201612/14/2016PPASS
DetailsJim Page
No fire sprinklers, fire alarm inspection is complete, temporary fire extinguishers is in place, permanent fire extinguisher will be installed when wall finishings are complete. Final life fire safety inspection passed/complete.
BLD-Final12/12/201612/14/201612/14/2016PDONE
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Corey Hockersmith-as per Jim Storey inspection passed and ok for perm c of o
Permanent Occupancy  12/14/2016 DONE
BLD-Framing/Rough-in11/2/201611/2/201611/2/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Foundation8/18/20168/18/20168/18/2016PPASS
DetailsJim Storey
Stem Wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Footing8/16/20168/17/20168/17/2016APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Aging Inspection2/16/20162/16/20162/16/2016 NR
DetailsJim Storey
BLD-Aging Inspection2/15/20162/15/20162/16/2016 NR
DetailsJim Storey
Print Occupancy Form  4/2/2015 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  4/2/2015 DONE
Permit Ready to Issue  4/1/2015 DONE
need gc form, updated values, ACHD receipt, RP
Routing - PLAN CHECK2/25/2015 3/31/2015 PASS
DetailsCarl Westfall
All agencies approved
PLANS/APPL TAKEN TO FRONT DESK  3/31/2015 DONE
Plan assigned to (CJW)7/22/2014 3/31/2015 PASS
DetailsCarl Westfall
MAIL BUILDING (1st review done)
Routing Off Site - STRUCTURAL2/26/2015 3/30/2015 PASS
DetailsCarl Westfall
Routing PW Flood Plain2/26/2015 3/30/2015 PASS
DetailsJim Wyllie
Routing - MECHANICAL3/10/2015 3/10/2015 PASS
DetailsTroy James
Routing - MECHANICAL2/26/2015 2/27/2015 FAIL
DetailsTroy James
Routing - Design Review2/26/2015 2/27/2015 PASS
DetailsSarah Schafer
Sarah - Approved per DRH12-00038 and DRH15-00030.
Routing - PLAN CHECK2/25/2015 2/26/2015  
DetailsCarl Westfall
Plan resubmittals received  2/25/2015 DONE
Plan resubmittals requested  2/11/2015 DONE
Routing Off Site - STRUCTURAL1/26/2015 2/11/2015 FAIL
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK1/23/2015 2/11/2015 FAIL
DetailsCarl Westfall
Routing - Design Review1/26/2015 1/30/2015 FAIL
DetailsSarah Schafer
Routing - MECHANICAL1/26/2015 1/27/2015 FAIL
DetailsTroy James
Routing - PLANNING1/26/2015 1/26/2015 PASS
DetailsCody Riddle
Plan resubmittals received  1/23/2015 DONE
Routing Off Site - STRUCTURAL12/9/2014 12/29/2014 FAIL
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK12/13/2014 12/29/2014 FAIL
DetailsCarl Westfall
Waiting for the resolution of the structural issues.
Plan resubmittals requested  12/29/2014 DONE
DetailsCarl Westfall
Routing - PLAN CHECK12/9/2014 12/13/2014 PASS
DetailsCarl Westfall
For the building review, the structural issues have not been resolved.
Plan resubmittals received  12/11/2014 DONE
DetailsCarl Westfall
Routing PW Street Lights12/9/2014 12/10/2014 PASS
DetailsMike D Hedge
Routing - MECHANICAL12/9/2014 12/10/2014 FAIL
DetailsTroy James
Routing - Design Review12/9/2014 12/10/2014 FAIL
DetailsSarah Schafer
Routing - PLANNING12/9/2014 12/9/2014 FAIL
DetailsCody Riddle
One outstanding condition of approval:

Condition #22-The Army Corps required an updated wetland delineation. (We need final written approval from the Corps before we can issue the permit)

Emailed applicant today. (Note: I updated activity from the master permit BLD14-01818.)
Plan resubmittals received  12/8/2014 DONE
DetailsCarl Westfall
Plan resubmittals requested  11/7/2014 DONE
Routing Off Site - STRUCTURAL10/22/2014 11/7/2014 FAIL
DetailsCarl Westfall
Jan Welch
Routing - PLAN CHECK10/16/2014 10/29/2014 FAIL
DetailsCarl Westfall
One item not resolved
Routing PW Drainage10/22/2014 10/29/2014 PASS
DetailsBrian Murphy
Routing - FIRE10/22/2014 10/28/2014 PASS
DetailsCraig D. Hanson
No report
Routing PW Street Lights10/22/2014 10/22/2014 FAIL
DetailsMike D Hedge
Routing - Erosion and Sediment10/22/2014 10/22/2014 PASS
DetailsEvan Jenkins
Routing - MECHANICAL10/22/2014 10/22/2014 FAIL
DetailsTroy James
Routing - PLANNING10/22/2014 10/22/2014 FAIL
DetailsCody Riddle
Routing - Design Review10/22/2014 10/22/2014 FAIL
DetailsSarah Schafer
Plan resubmittals received  10/16/2014  
Routing - PLAN CHECK7/22/2014 8/30/2014 FAIL
DetailsCarl Westfall
1st review completed  8/30/2014 FAIL
Plan resubmittals requested  8/29/2014 DONE
Routing Off Site - STRUCTURAL7/22/2014 8/27/2014 FAIL
DetailsCarl Westfall
Since the submittal was incomplete, a structural review could not be done.
Routing - MECHANICAL8/11/2014 8/14/2014 FAIL
DetailsTroy James
Routing - FIRE7/29/20147/29/20148/12/2014 PASS
DetailsCraig D. Hanson
No Report
Route to Impact Fee Review7/22/2014 8/1/2014 PASS
DetailsCindy M. Gould
Routing PW Drainage7/22/2014 7/29/2014 FAIL
DetailsBrian Murphy
Routing - PLUMBING7/22/2014 7/28/2014 PASS
DetailsBill VanDegrift
Routing - PLANNING7/22/2014 7/24/2014 FAIL
DetailsCody Riddle
Routing PW Solid Waste7/22/2014 7/24/2014 PASS
DetailsPeter J. McCullough
Routing - Design Review7/22/2014 7/24/2014 FAIL
DetailsSarah Schafer
Routing - Addressing7/24/2014 7/24/2014 PASS
DetailsEmily Dixon
Routing PW Sewer Design7/24/2014 7/24/2014 PASS
DetailsKyle S. Rosenmeyer
Private Sewer System
Routing - PUBLIC WORKS7/23/2014 7/23/2014 PASS
DetailsBeverly Mountain
Routing PW Street Lights7/22/2014 7/23/2014 FAIL
DetailsMike D Hedge
Routing - PLANNING Land Div7/22/2014 7/23/2014 PASS
DetailsDave Abo
Routing PW Sewer Rating7/22/2014 7/23/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment7/22/2014 7/23/2014 FAIL
DetailsEvan Jenkins
Intake Approval  7/22/2014 PASS
DetailsJohn Menard
Pending Assignment by JCM7/22/2014 7/22/2014 DONE
DetailsJohn Menard
Intake Approval  7/2/2014 FAIL
DetailsTim L. Woodard
Application received  6/30/2014 DONE
Application submitted via PDS Online on Jun 30 2014 6:44AM