Print Statement | | | 5/11/2015 | | DONE |
|
|
|
|
First Notice | | 3/14/2015 | 5/4/2015 | | DONE |
|
|
|
|
BLD-Final | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Jim Sly
|
|
|
Berny-zoning inspection scheduled for 10:00 so can you please go out after that for the final Phone #: ###-#### Zoning approved ........OK for Perm Occ.
|
Zoning Approval | 3/4/2015 | 3/4/2015 | 3/4/2015 | | DONE |
Andrea Tuning
|
|
|
|
Permanent Occupancy | | | 3/4/2015 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | NR |
Jim Sly
|
|
|
Burrney Phone #: ###-#### Need to verify Zoning perm occ.
|
BLD-Final | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | PART |
Mike Jordan
|
|
|
Bernie Phone #: ###-####. All issues resolved. Will be ok for perm occ. once zoning signs pem.
|
BLD-Final | 1/16/2015 | 1/16/2015 | 1/16/2015 | A | PART |
Mike Jordan
|
|
|
ok for temp occ. Waiting for new ADA signage.
|
Temporary Occupancy | 1/16/2015 | 4/16/2015 | 1/16/2015 | | DONE |
Christina Prado
|
|
|
|
PubWorks Occupancy Approval | 1/16/2015 | 1/16/2015 | 1/16/2015 | | DONE |
Brian Murphy
|
|
|
|
Zoning Approval Temp | 1/16/2015 | 1/16/2015 | 1/16/2015 | | DONE |
Andrea Tuning
|
|
|
Temporary approval has been granted due to the fact that a bond has been placed for native grass seed, bike rack and the metal coping on the building. 120-day temporary occupancy.
|
BLD-Final | 1/13/2015 | 1/14/2015 | 1/14/2015 | A | FAIL |
Mike Jordan
|
|
|
Bernie or ###-#### Jeremiah Phone #: ###-####. Provide special inspection report, post bond. Provide ADA compliant restroom signs.
|
FIRE-Final Inspection | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 1/8/2015 | 1/9/2015 | 1/9/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need approval from plan review for the lighting calculations, need battery room signage still, need spill clean up documentation as discussed, need riser room signage still, need emergency generator certification.
|
FIRE-Final Inspection | 12/17/2014 | 12/18/2014 | 12/18/2014 | P | FAIL |
Troy Cobbley
|
|
|
Went over life safety requirements with owner and general contractor. Need exit discharge lighting, Man Trap door operation approved, fire extinguishers verified, hydrant location verified, gate width verifed, emergency generator certification, need electrical room signs, battery room signs, riser room signage, fire dept access signage, need address, need project related fire alarm and fire sprinkler permits finaled.
|
FIRE-Final Inspection | 12/17/2014 | 12/17/2014 | 12/18/2014 | P | FAIL |
Troy Cobbley
|
|
|
Started life safety inspection. Missing all of the small documents. I noted problems with exit discharge lighting and access controled egress locks. This was only a partial inspection.
|
BLD-Ceiling Grid Inspection | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | PASS |
Mike Jordan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/17/2014 | | DONE |
Christina Prado
|
|
|
Per AJS - Plan mod was minor and no fees were due. Changing status from FEE to ISS so inspections can continue
|
Routing - FIRE | 12/11/2014 | 12/11/2014 | 12/11/2014 | | PASS |
Craig D. Hanson
|
|
|
No changes to original Fire Code review comments. Modifications will be required to the building fire protection system, under separate permit.
|
Plan assigned to (AJS) | 12/11/2014 | 12/11/2014 | 12/11/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan mod
|
Routing - PLAN CHECK | 12/11/2014 | | 12/11/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Plan resubmittals requested | | | 12/4/2014 | | DONE |
|
|
|
started workflow
|
BLD-Ceiling Grid Inspection | 11/20/2014 | 11/20/2014 | 11/20/2014 | P | PASS |
Jim Sly
|
|
|
jason Phone #: ###-####
|
BLD-Framing/Rough-in | 10/22/2014 | 10/23/2014 | 10/23/2014 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####. soffits and hardlids ok.
|
BLD-Framing/Rough-in | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | CANC |
Mike Jordan
|
|
|
Berne Phone #: ###-####. No inspection needed at this time.
|
BLD-Framing/Rough-in | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 9/25/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Jim Sly
|
|
|
Framing inspection for office area Phone #: ###-#### Inspection requested via web by Berne Hotchkiss
|
BLD-Conference | 9/16/2014 | 9/16/2014 | 9/16/2014 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Berne Hotchkiss
|
BLD-Framing/Rough-in | 9/16/2014 | 9/16/2014 | 9/16/2014 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Berne Hotchkiss. ok to start sheeting on exterior side of exterior walls only. Contractor to get clarification from structural engineer regarding the horizontal bridging at 5 ft and 4ft on center for all non bearing walls and walls smaller than 4" wide.
|
BLD-Framing/Rough-in | 9/12/2014 | 9/15/2014 | 9/15/2014 | P | PART |
Mike Jordan
|
|
|
Bernie Phone #: ###-####. Exterior steel stud walls at south office area wall. Work in progress on remainder of exterior walls.
|
BLD-Framing/Rough-in | 9/3/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Mike Jordan
|
|
|
Berney Phone #: ###-####. Interior steel stud walls at data center portion only. Steel steud parapet also ok to shhet on interior side.
|
BLD-Framing/Rough-in | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PART |
Mike Jordan
|
|
|
bernie Phone #: ###-####. Needs MEP inspections first. Reviewed special inspection reoprts to date. Also requested special inspection reports for precast concrete wall panels.
|
Issue PAID IN FULL permit | | | 8/27/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 8/27/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (AJS) | 7/8/2014 | 7/8/2014 | 8/21/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
resubs recieved 8/14 1st review completed Due 8/05 Project Management Level 3 TI - ePlanReview - Involta Data Center TI
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/21/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 8/14/2014 | | 8/21/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 8/14/2014 | 8/14/2014 | 8/20/2014 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to plans.
|
Route to Impact Fee Review | 8/5/2014 | 8/8/2014 | 8/5/2014 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 7/31/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 7/8/2014 | | 7/31/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 7/8/2014 | 7/8/2014 | 7/16/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-16-14
|
Routing - PLUMBING | 7/8/2014 | | 7/9/2014 | | PASS |
Bill VanDegrift
|
|
|
approved with red lines
1) P100- 4"drain in mechanical room to recieve discharge of 2" R.P.,
2) P100- floor drain in restroom to be flush with finish floor.
3) P100- control valve to be in north wall for ADA compliance.
4) P200-R.P. required on water to mechanical equipment.
5) P210- same as P100
6) P211- same as P200
|
Routing PW Sewer Rating | 7/9/2014 | | 7/9/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/8/2014 | | 7/9/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/8/2014 | | 7/9/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 7/8/2014 | | 7/9/2014 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH14-00042
|
Intake Approval | | | 7/8/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Sam Zahorka. Plan Review Fees paid.
|
Pending Assignment by JCB | 7/8/2014 | | 7/8/2014 | | DONE |
Jason Blais
|
|
|
|
Application received | | | 7/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 1 2014 12:41PM
|