BLD-Final | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Tony Young
|
|
|
craig Phone #: ###-####
|
DOC - Permit Finaled | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 10/21/2014 | 10/22/2014 | 10/22/2014 | A | DEFR |
Tony Young
|
|
|
craig Phone #: ###-####
|
BLD-Framing/Rough-in | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | PASS |
Tony Young
|
|
|
Greg Phone #: ###-####,, deck frame ok
|
BLD-Framing/Rough-in | 8/27/2014 | 8/28/2014 | 8/28/2014 | P | CANC |
Tony Young
|
|
|
Craig-this insp is for the deck Phone #: ###-#### // cancelled per phone call from Stronghold Remodeling
|
BLD-Footing | 8/1/2014 | 8/4/2014 | 8/4/2014 | A | PASS |
Tony Young
|
|
|
craig; Phone #: ###-####
|
PubWorks Subgrade Approval | 8/4/2014 | 8/4/2014 | 8/4/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing PW Grading-Hillside | 8/1/2014 | | 8/1/2014 | | PASS |
Jim Wyllie
|
|
|
Received letter from Geotechnical engineer approving footing subgrade for new deck. Okay to schedule fiooting inspection. Deadman connections to existing railroad tie retaining wall are required as per Figure 3 of letter from Syman to Stronghold Remodeling dated July 15, 2014. Jim Wyllie (###-####)
|
Routing Walk-In (Zoning) | 7/31/2014 | 7/31/2014 | 7/31/2014 | A | PASS |
Bruce Eggleston
|
|
|
The Somerset Ridge No. 1E plat notes allow a 15 foot setback in the rear yards. The rear deck complise with this etback.
|
Routing Walk-In (Zoning) | 7/31/2014 | 7/31/2014 | 7/31/2014 | A | DONE |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 7/31/2014 | 7/31/2014 | 7/31/2014 | A | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/31/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2014 | | |
|
|
|
|
Case Summary (BLD) | | | 7/31/2014 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/31/2014 | | 7/31/2014 | | PASS |
Perry Paine
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/31/2014 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/31/2014 | | DONE |
Tisha Gallop
|
|
|
plan modification
|
BLD-Energy code compliance | 7/30/2014 | 7/30/2014 | 7/30/2014 | P | PASS |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Energy code compliance | 7/29/2014 | 7/30/2014 | 7/30/2014 | A | NR |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Energy code compliance | 7/29/2014 | 7/29/2014 | 7/29/2014 | P | NR |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Energy code compliance | 7/28/2014 | 7/29/2014 | 7/29/2014 | A | NR |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2014 | 7/28/2014 | 7/28/2014 | A | PASS |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Footing | 7/9/2014 | 7/10/2014 | 7/10/2014 | P | PART |
Tony Young
|
|
|
Craig Phone #: ###-####,, wip
|
Routing Walk-In (BLD) | 7/2/2014 | 7/2/2014 | 7/2/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 7/2/2014 | 7/2/2014 | 7/2/2014 | | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2014 | | |
|
|
|
|
1st review completed | | | 7/2/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/2/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/2/2014 | | DONE |
|
|
|
|
CHANGE STATUS TO (FEE) | | | 7/2/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 7/2/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 7/2/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | 7/2/2014 | | | |
|
|
|
|