Permit Information
Permit NumberBLD14-01910
StatusFinaled
Name RAINIER CONSTRUCTION
Site Address 2396 N 14TH PL
Project Name 
Customer Number 
ePlanReviewNo
Description
***12-5-2014 THIS BUILDING PERMIT IS MODIFIED TO REFLECT THE CHANGE OF THE CONDITIONED LIVING SPACE ABOVE THE DETACHED GARAGE TO BE UNFINISHED AT THIS TIME. NO INTERIOR WALL OR CEILING COVERINGS INSULATION IN WALL OR CEILING OF THE LIVING SPACE MAY BE COVERED. 1- LIGHT SWITCH FOR STAIR AND ONE FOR OTHER UNFINISHED SPACE ALONG WITH HARD WIRED SMOKE ALARM CO ALARM. PROPOCED REDUCTION IN THE PROJECT VALUATION WILL BE $35,000.00. SEPARATE PERMITS FOR THE COMPLETION OF TIS UPPER LEVEL CONDITIONED AREA ARE REQUIRED. (SEE COMMENTS) pep 12-5-2014*** WUI Zone A, Class A Roof, Permit for the construction of a new 1,065 sq. ft., one story single family dwelling (1 bedroom, 1 bathroom, approximately 260 sq. ft. of covered patio/porch) with detached 336 sq. ft. detached garage with 376 sq. ft. attached shop and 393 sq. ft. of living space above (2 bonus rooms, 1 half bathroom) per approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. This inspection should include all density testing of footings soil as per geotechncial report. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/28/20164/29/20164/29/2016APASS
DetailsTony Young
charlie
DOC - Permit Finaled4/29/20164/29/20164/29/2016PPASS
DetailsTony Young
PubWorks Occupancy Approval4/22/20164/22/20164/22/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final3/17/20163/18/20163/18/2016PPEND
DetailsTony Young
Charlie Phone #: ###-####,, need hill side approval
BLD-Final3/16/20163/17/20163/17/2016PPEND
DetailsTony Young
Charlie Phone #: ###-####
BLD-Final3/15/20163/16/20163/16/2016PPART
DetailsTony Young
Charlie Phone #: ###-####,, all ok pending hillside P W
BLD-Final3/15/20163/15/20163/15/2016PPEND
DetailsTony Young
Charlie Phone #: ###-####
BLD-Final3/14/20163/14/20163/15/2016PNR
DetailsTony Young
Charlie Phone #: ###-####,, need hillside and address
BLD-Energy code compliance2/11/20152/11/20152/11/2015PPASS
DetailsMike Jordan
Charlie Phone #: ###-####
BLD-Framing/Rough-in2/3/20152/4/20152/4/2015APART
DetailsTony Young
Charlie Phone #: ###-####,, ok to insulate,, need another sprinkler inspection
BLD-Framing/Rough-in2/2/20152/2/20152/2/2015PNR
DetailsTony Young
Charlie Phone #: ###-####,, need sprinklers signed off 1st
CHANGE STATUS TO (ISS)  1/29/2015 DONE
DetailsChristina Prado
(F) Reprint permit  1/29/2015 DONE
DetailsChristina Prado
OVERRIDE  1/26/2015  
Telephone call  1/26/2015 DONE
DetailsCandy A. Nichols
called to let Rainier Construction to plan mod is ready-left message on their phon e
Routing - PLAN CHECK1/23/2015 1/26/2015 PASS
DetailsJavier Guzman
no review needed of seepage bed from plan review
PLANS/APPL TAKEN TO FRONT DESK  1/26/2015 DONE
Permit Ready to Issue  1/26/2015 DONE
DetailsCandy A. Nichols
Plan Modification Accepted  1/23/2015  
received 3 sets of sheets G-001, CS-101, CG-101, CG-501, EC-101- took to Jason Taylor's desk
Routing PW Grading-Hillside1/23/2015 1/23/2015 PASS
DetailsJason C. Taylor
Plan mod approved for location and size of seepage bed. Jason Taylor ###-####.
Plan assigned to (PEP)12/5/201412/5/201412/5/2014 DONE
DetailsPerry Paine
Routing Walk-In (BLD)12/5/201412/5/201412/5/2014APASS
DetailsPerry Paine
Case Summary (BLD)  12/5/2014  
Inspection Record Card- Bld  12/5/2014  
CHANGE STATUS TO (ISS)  12/5/2014 DONE
SEE 12-5-2014 PLAN REVIEW NOTES AND COMMENTS 12-5-2014 PEP
BLD-Foundation10/6/201410/7/201410/7/2014APASS
DetailsTony Young
WES Phone #: ###-####
BLD-Footing10/2/201410/3/201410/3/2014PPART
DetailsDave Hannah
wes - 330 pour Phone #: ###-#### setbacks ok forms up crew working on rebar
PubWorks Subgrade Approval9/29/20149/29/20149/29/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  9/2/2014 DONE
DetailsChristina Prado
OVERRIDE  8/13/2014  
Telephone call  8/13/2014 DONE
DetailsCandy A. Nichols
called Charlie to let know permit is ready and how much is owed. left message
Permit Ready to Issue  8/13/2014 DONE
DetailsCandy A. Nichols
Routing - FIRE8/12/20148/12/20148/12/2014 PASS
DetailsScott Arellano
Approved. Attached Fire Code comments to plans.
Plan assigned to (JG)7/10/20147/10/20148/12/2014 PASS
DetailsJavier Guzman
1st review completed, Pending Fire, 7/29 T L2 Hillside*
Plan resubmittals received  8/12/2014  
Received 1 cover transmittal, 4 sheets of 1 of 7 and taken to Javier's desk
Case Summary (BLD)  8/12/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/12/2014 DONE
Inspection Record Card- Bld  8/12/2014 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS7/25/2014 7/25/2014 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside7/24/2014 7/25/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. This inspection should include all density testing of footings soil as per geotechncial report. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

1st review completed  7/24/2014 FAIL
DetailsJavier Guzman
pending Fire and Hillside
Routing - PLAN CHECK  7/24/2014 PASS
DetailsJavier Guzman
Routing - FIRE7/18/20147/11/20147/18/2014 FAIL
DetailsScott Arellano
Faxed report to applicant. See attached Fire Code Plan review report.
Routing - Erosion and Sediment7/17/2014 7/18/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection Required Prior to Earth Disturbance
Routing - MECHANICAL  7/17/2014 PASS
DetailsTroy James
Plan resubmittals received  7/16/2014 DONE
DetailsTisha Gallop
received three copies of revised plan sheets G-001, CS-101, CG-101, CG-501, EC-101, shallow injection well form and ESC narrative; put with plans in Mechanical review.
Routing - PLANNING7/14/2014 7/15/2014 PASS
DetailsSue Cummings
Sheet # EC-101 labled shop as "house". No accessory dwelling unit permit approval at this time.
Routing - Addressing7/11/2014 7/14/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS7/14/2014 7/14/2014 FAIL
DetailsJennifer Bruner
Routing PW Grading-Hillside7/14/2014 7/14/2014 FAIL
DetailsJason C. Taylor
Need 3 copies of revised grading plan (spoke with Syman Company). 2 copies of Shallow Injection Well Forms for seepage bed. Jason Taylor ###-####.
Application received 7/7/20147/11/2014 DONE
Plans ACCEPTED BY PLAN TECH  7/10/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/10/2014 DONE
DetailsTisha Gallop
Intake Approval  7/10/2014 PASS
DetailsTisha Gallop