Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD14-01929
StatusFinaled
Name REED KENNETH RUSSELL
Site Address 2415 W COMPASS DR
Project NameMolly's Cottage
Customer Number 
ePlanReviewNo
Description
This project is for the construction of a new 1258s.f. 2-story single family dwelling with 1-master bedroom with a 3/4 bath and two 1/2 bathrooms, in a lot where an existing dwelling was removed under BLD05-01185. The dwelling is proposed to have 656s.f. of living space on the main level and 600s.f. of living space on the upper level. 244s.f. of which is above the 356s.f. 1-car garage that is connected to the main dwelling by an above grade open deck / patio / walkway between the upper levels of living space.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/21/201411/21/201411/21/2014PPASS
DetailsTony Young
Ken Phone #: ###-####
DOC - Permit Finaled11/21/201411/21/201411/21/2014PPASS
DetailsTony Young
BLD-Energy code compliance9/8/20149/9/20149/9/2014PPASS
DetailsTony Young
Ken Phone #: ###-####
BLD-Framing/Rough-in9/5/20149/5/20149/5/2014PPASS
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Wall Bracing8/18/20148/18/20148/18/2014PPASS
DetailsTony Young
Ken Phone #: ###-####
BLD-Foundation7/28/20147/28/20147/28/2014PPART
DetailsTony Young
Ken Phone #: ###-####
BLD-Footing7/25/20147/25/20147/25/2014PPART
DetailsTony Young
Ryan Phone #: ###-####,, ok pending setback verification from Ken Reed
Issue PAID IN FULL permit  7/18/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  7/17/2014  
Plan assigned to (PEP)7/16/20147/16/20147/17/2014 PASS
DetailsPerry Paine
1st review completed  7/17/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/17/2014 DONE
Inspection Record Card- Bld  7/17/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  7/17/2014 DONE
DetailsBarbara Stitt
Telephone call  7/17/2014 DONE
DetailsBarbara Stitt
Left voice message for Ken on 7-17-14 @ 4:05pm
Routing - PLAN CHECK7/15/2014 7/17/2014 PASS
DetailsPerry Paine
Plan assigned to (JG) 7/8/20147/16/2014 DEFR
DetailsJavier Guzman
7/18 F L1**
Routing - MECHANICAL7/9/2014 7/15/2014 PASS
DetailsTroy James
Route to Impact Fee Review7/8/20147/11/20147/11/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING7/9/2014 7/9/2014 PASS
DetailsColleen T Carroll
Garage not approved as an ADU
Routing - Addressing7/8/2014 7/9/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS7/9/2014 7/9/2014 PASS
DetailsJennifer Bruner
Plans ACCEPTED BY PLAN TECH  7/8/2014 DONE
DetailsChristina Prado
Intake Approval  7/8/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  7/8/2014 DONE
DetailsChristina Prado
Application received 7/8/2014