Telephone call | | | 6/29/2016 | | DONE |
|
|
|
called Michelle about past due amount-was transferred to Steve (CO) he asked me to email me the statemnets so he can pay them online
|
Print Statement | | | 6/29/2016 | | DONE |
|
|
|
sent statement so Steve (CO)
|
Print Statement | | | 6/9/2016 | | DONE |
|
|
|
|
Print Statement | | | 4/14/2016 | | DONE |
|
|
|
stamped past due
|
Print Statement | | | 4/1/2016 | | DONE |
|
|
|
|
Print Statement | | | 12/22/2015 | | DONE |
|
|
|
|
Second Notice | | 11/19/2015 | 12/10/2015 | | DONE |
|
|
|
mailed 12-11-15
|
First Notice | | 11/6/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
Permanent Occupancy | | | 10/27/2015 | | DONE |
|
|
|
|
BLD-Final | 10/21/2015 | 10/22/2015 | 10/22/2015 | A | PASS |
Dave Hannah
|
|
|
Abel Phone #: ###-####
|
Zoning Approval | 10/21/2015 | 10/21/2015 | 10/21/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Aging Inspection | 9/30/2015 | 9/30/2015 | 9/30/2015 | | PEND |
Dave Hannah
|
|
|
|
Temporary Occupancy | 7/31/2015 | 10/29/2015 | 7/31/2015 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval Temp | 7/31/2015 | 7/31/2015 | 7/31/2015 | | DONE |
Andrea Tuning
|
|
|
BND15-000084
|
BLD-Conference | 7/29/2015 | 7/29/2015 | 7/29/2015 | A | DONE |
Bob Archibald
|
|
|
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
|
FIRE-Final Inspection | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | PASS |
Jim Page
|
|
|
Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.
*Above item confirmed - 325*
|
BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 | P | PEND |
Dave Hannah
|
|
|
Walk for final Phone #: ###-#### Inspection requested via web by Julian Lopez. needs other trades to final
|
Print Occupancy Form | | | 7/14/2015 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Dave Hannah
|
|
|
grid and soffit in bike rm Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 5/20/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Dave Hannah
|
|
|
Garage insulation. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Energy code compliance | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Dave Hannah
|
|
|
garage insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 5/12/2015 | 5/13/2015 | 5/14/2015 | P | PART |
Dave Hannah
|
|
|
Parking garage ceiling Phone #: ###-#### Inspection requested via web by Julian Lopez west half ok to cover
|
BLD-Energy code compliance | 5/11/2015 | 5/11/2015 | 5/11/2015 | P | PASS |
Dave Hannah
|
|
|
Lobby. Phone #: ###-#### Inspection requested via web by Julian Lopez
|
BLD-Framing/Rough-in | 5/1/2015 | 5/4/2015 | 5/4/2015 | A | FAIL |
Dave Hannah
|
|
|
Lobby. Phone #: ###-#### Inspection requested via web by Julian Lopez needs to fix fire stopping
|
BLD-Framing/Rough-in | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | PART |
Dave Hannah
|
|
|
Julian Phone #: ###-#### sheetrock lids in corradors west side second level ok
|
BLD-Foundation | 10/15/2014 | 10/15/2014 | 10/16/2014 | P | PEND |
Dave Hannah
|
|
|
Pouring several slabs with thickened footings that have re-bar in them, pouring elevated spa slab with concrete beams and rebar. Concrete is scheduled fro 8:30 am Thursday. MTI will also be inspecting. Phone #: ###-#### Inspection requested via web by Tony Inserra
|
Permit Ready to Issue | | | 10/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue PAID IN FULL permit | | | 10/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 10/3/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing PW Street Lights | 9/30/2014 | | 10/2/2014 | | PASS |
Mike D Hedge
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2014 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 7/14/2014 | | 10/2/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 8/15/2014West Sherwood Apartments
|
Routing - PLAN CHECK | 9/26/2014 | | 10/1/2014 | | PASS |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2014 | | 9/30/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLUMBING | 9/26/2014 | | 9/29/2014 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing PW Street Lights | 9/26/2014 | | 9/26/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - PLAN CHECK | 9/3/2014 | | 9/17/2014 | | FAIL |
John Menard
|
|
|
|
Routing - Design Review | 9/3/2014 | | 9/5/2014 | | PASS |
Josh Wilson
|
|
|
Corrected elevations have been uploaded.
|
Routing PW Street Lights | 9/3/2014 | | 9/4/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing - Addressing | 9/3/2014 | | 9/3/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PLUMBING | 9/3/2014 | | 9/3/2014 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - MECHANICAL | 9/3/2014 | | 9/3/2014 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/13/2014 | | 8/19/2014 | | FAIL |
Troy James
|
|
|
smoke protection to ducts penetrating the corridor
|
Routing PW Environmental | 7/17/2014 | | 8/18/2014 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Flood Plain | 7/17/2014 | | 8/18/2014 | | PASS |
Jim Wyllie
|
|
|
|
1st review completed | | | 8/15/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/14/2014 | | 8/15/2014 | | FAIL |
John Menard
|
|
|
|
Route to Impact Fee Review | 7/14/2014 | 7/17/2014 | 8/13/2014 | | PASS |
Cindy M. Gould
|
|
|
Spoke to John he said the plans did not list an office, just parking and club house. Therefore no impact fees.
|
Routing - Design Review | 7/14/2014 | | 8/4/2014 | | FAIL |
Josh Wilson
|
|
|
Upload new sheets A201 and A202 showing corrugated metal siding
|
Routing - PLUMBING | 7/14/2014 | | 7/24/2014 | | FAIL |
Daryl Spivey
|
|
|
1) size waste mains in the parking garage
2) rain water is undersized from the first horizontal offset to the mains.
|
Routing PW Solid Waste | 7/17/2014 | | 7/23/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLANNING | 7/14/2014 | | 7/21/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing - FIRE | 7/14/2014 | 7/14/2014 | 7/18/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to case.
|
Routing Off Site - STRUCTURAL | 7/14/2014 | | 7/18/2014 | | PASS |
John Menard
|
|
|
|
Routing PW Drainage | 7/17/2014 | | 7/18/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 7/17/2014 | | 7/18/2014 | | FAIL |
Mike D Hedge
|
|
|
|
Routing PW Sewer Design | 7/17/2014 | | 7/17/2014 | | PASS |
Kristal Soland
|
|
|
|
Routing PW Sewer Rating | 7/17/2014 | | 7/17/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PUBLIC WORKS | 7/14/2014 | | 7/17/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/14/2014 | | 7/16/2014 | | FAIL |
Emily Dixon
|
|
|
Apartment addresses need to be identifed on plans. Room numbers identifed currently do not meet BoiseCity addressing code. Jason Taylor ###-####
|
Pending Assignment by JCM | 7/14/2014 | | 7/14/2014 | | DONE |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 7/14/2014 | | 7/14/2014 | | PASS |
Andy J. Long
|
|
|
Reference ESC14-00239. No need for new ESC permit.
|
Intake Approval | | | 7/14/2014 | | PASS |
John Menard
|
|
|
|
Application received | | | 7/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2014 2:56PM
|