Permit Information
Permit NumberBLD14-01938
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1105 S LA POINTE ST
Project NameWest Sherwood Apartments
Customer NumberBLD14-01936 & BLD14-01937
ePlanReviewNo
Description
VISTA EAST (formerly known as West Sherwood Apartments) - Building 2 - To construct a 27,900 square foot, three story, wood framed apartment building. This building contains 33 living units. This building is being constructed on a three-hour fire-resistive concrete podium above a one story concrete parking garage building. This apartment building is being divided into three buildings by two fire walls. This building is being sprinklered with an NFPA 13R system. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  7/22/2016 DONE
Print Statement  12/22/2015 DONE
Permanent Occupancy  10/27/2015 DONE
BLD-Final10/21/201510/22/201510/22/2015APASS
DetailsDave Hannah
Abel Phone #: ###-####
Zoning Approval10/21/201510/21/201510/21/2015 DONE
DetailsAndrea Tuning
BLD-Aging Inspection9/30/20159/30/20159/30/2015 PEND
DetailsDave Hannah
Temporary Occupancy7/31/201510/29/20157/31/2015 DONE
DetailsChristina Prado
Zoning Approval Temp7/31/20157/31/20157/31/2015 DONE
DetailsAndrea Tuning
BND15-00084
BLD-Conference7/29/20157/29/20157/29/2015ADONE
DetailsBob Archibald
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
FIRE-Final Inspection7/23/20157/24/20157/24/2015APASS
DetailsJim Page
Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.

*Above item confirmed - 325*
BLD-Final7/23/20157/24/20157/24/2015PPEND
DetailsDave Hannah
Walk for final
Phone #: ###-#### Inspection requested via web by Julian Lopez. Needs other trades ot go perm occ needs to install perm signage, type A ada units need to meet ansi 117.1 chapter 10 section 1006. ok for temp occ.
Print Occupancy Form  7/14/2015 DONE
BLD-Ceiling Grid Inspection6/29/20156/29/20156/30/2015PPASS
DetailsDave Hannah
corridor Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Ceiling Grid Inspection6/24/20156/24/20156/25/2015PPASS
DetailsDave Hannah
Corridor level 4 Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Ceiling Grid Inspection6/17/20156/17/20156/18/2015PPASS
DetailsDave Hannah
Ceiling grid Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Other4/28/20154/28/20154/28/2015PPASS
DetailsDave Hannah
level 4 soffits. Ready now. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance4/21/20154/21/20154/22/2015PPASS
DetailsDave Hannah
Am if possible. level 2 soffits Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Other4/13/20154/14/20154/14/2015APASS
DetailsDave Hannah
Soffit inspection level 3 Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance4/8/20154/8/20154/9/2015PPASS
DetailsDave Hannah
Level 4 insulation. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in4/3/20154/3/20154/3/2015PPASS
DetailsDave Hannah
Framing inspection. If AM possible. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance3/26/20153/26/20153/27/2015PPASS
DetailsDave Hannah
Area 1 level 3 Insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in3/25/20153/25/20153/25/2015PNR
DetailsDave Hannah
Area 2 level 4 framing inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in3/23/20153/23/20153/23/2015PPASS
DetailsDave Hannah
Area 1 lvl 3. framing and insulation lvl 2 Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in3/19/20153/20/20153/20/2015APART
DetailsDave Hannah
Framing inspection level 2,3, Phone #: ###-#### Inspection requested via web by Julian Lopez 2nd floor only ok to insulate
BLD-Framing/Rough-in3/13/20153/13/20153/18/2015PPASS
DetailsDave Hannah
Area 2 lvl 4 shear wall and rest of showers. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in3/6/20153/6/20153/6/2015PCANC
DetailsDave Hannah
Exterior walls lvl 4
Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in2/25/20152/26/20152/26/2015APASS
DetailsDave Hannah
lvl 3 inside exterior walls. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Conference2/17/20152/18/20152/18/2015APART
DetailsDave Hannah
Framing inspection outer walls. level 2 Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ext walls.
BLD-Framing/Rough-in1/30/20151/30/20151/30/2015PPART
DetailsDave Hannah
check corridor framing prior to drywall lvl 4 Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ceiling 4th floor corridor.
BLD-Wall cover1/27/20151/27/20151/27/2015ACANC
DetailsDave Hannah
BLD-Wall Bracing1/27/20151/27/20151/27/2015APART
DetailsDave Hannah
ok to cover ext
BLD-Framing/Rough-in1/15/20151/16/20151/21/2015PPASS
DetailsDave Hannah
Requesting a sheer nailing inspection on the exterior of the building.
Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Framing/Rough-in1/20/20151/20/20151/21/2015PPASS
DetailsDave Hannah
Requesting sheer wall nailing ; simpson strapping inspection. Phone #: ###-#### Inspection requested via web by Tony Inserra ext ok to cover
BLD-Framing/Rough-in1/12/20151/12/20151/13/2015PCANC
DetailsDave Hannah
Requesting a framing inspection for corridor pree-rock 2nd floor. Phone #: ###-#### Inspection requested via web by Tony Inserra ok to rock top 2ft of corr in area two
BLD-Framing/Rough-in1/6/20151/7/20151/7/2015APASS
DetailsDave Hannah
Requesting a roof sheeting nailing inspection.
Thanks. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Framing/Rough-in12/29/201412/29/201412/29/2014PPEND
DetailsDave Hannah
Requesting a roof nailing inspection, on N.W. to N. E section of roof sheeting.
Thank you. Phone #: ###-#### Inspection requested via web by Tony Inserra roof coverd in snow
Permit Ready to Issue  10/3/2014 DONE
Issue PAID IN FULL permit  10/3/2014  
(F) Reprint permit  10/3/2014 DONE
Print Occupancy Form  10/3/2014 DONE
DetailsCandy A. Nichols
PLANS/APPL TAKEN TO FRONT DESK  10/2/2014 DONE
DetailsJohn Menard
Plan assigned to (JCM)7/14/2014 10/2/2014 PASS
DetailsJohn Menard
1st Review Complete 8/21/2014 -West Sherwood Apartments
Routing - PLANNING7/14/2014 9/21/2014 PASS
DetailsJoshua Johnson
Routing - PLAN CHECK9/3/2014 9/17/2014 FAIL
DetailsJohn Menard
Routing - Design Review9/3/2014 9/5/2014 PASS
DetailsJosh Wilson
Corrected elevations have been uploaded.
Routing PW Street Lights9/3/2014 9/4/2014 FAIL
DetailsMike D Hedge
Routing - MECHANICAL9/3/2014 9/3/2014 PASS
DetailsTroy James
Routing - PLUMBING9/3/2014 9/3/2014 PASS
DetailsBill VanDegrift
Routing - Addressing9/3/2014 9/3/2014 PASS
DetailsEmily Dixon
Routing - PLAN CHECK7/14/2014 8/21/2014 FAIL
DetailsJohn Menard
1st review completed  8/21/2014 DONE
DetailsJohn Menard
Routing - Design Review7/14/2014 8/4/2014 FAIL
DetailsJosh Wilson
Upload new sheets A201 and A202 showing corrugated metal siding
Routing - PLUMBING7/14/2014 7/24/2014 FAIL
DetailsDaryl Spivey
see bld14-01936
Routing - FIRE7/14/20147/14/20147/18/2014 PASS
DetailsScott Arellano
Attached comments to case.
Routing Off Site - STRUCTURAL7/14/2014 7/18/2014 PASS
DetailsJohn Menard
Routing - PUBLIC WORKS7/14/2014 7/17/2014 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating7/17/2014 7/17/2014 PASS
DetailsBeverly Mountain
Routing - Addressing7/14/2014 7/16/2014 FAIL
DetailsEmily Dixon
Apartment addresses need to be identifed on plans. Room numbers identifed currently do not meet BoiseCity addressing code. Jason Taylor ###-####
Route to Impact Fee Review7/14/20147/17/20147/14/2014 PASS
DetailsCindy M. Gould
Pending Assignment by JCM7/14/2014 7/14/2014 DONE
DetailsJohn Menard
Intake Approval  7/14/2014 PASS
DetailsJohn Menard
Application received  7/8/2014 DONE
Application submitted via PDS Online on Jul 8 2014 2:56PM