BLD-Final | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Blower Door Test Results | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | PASS |
Tony Young
|
|
|
Bob Phone #: ###-####//// 2.7
|
BLD-Final | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, work in progress
|
BLD-Final | 1/21/2015 | 1/21/2015 | 1/21/2015 | P | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, need protection post,, blower door test
|
BLD-Final | 1/20/2015 | 1/21/2015 | 1/21/2015 | A | NR |
Tony Young
|
|
|
Bob Phone #: ###-####,, needs plumbing 1st
|
PubWorks Occupancy Approval | 1/16/2015 | 1/16/2015 | 1/16/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Wall Bracing | 9/24/2014 | 9/25/2014 | 9/25/2014 | A | PASS |
Jim Sly
|
|
|
Interior shear - Bobby Phone #: ###-####
|
BLD-Energy code compliance | 9/19/2014 | 9/19/2014 | 9/19/2014 | P | PASS |
Phil Shearer
|
|
|
late pm please // Bobby Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Phil Shearer
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | PART |
Tony Young
|
|
|
Bobby-fire rated soffits Phone #: ###-####,, soffits work in progress,, ok
|
BLD-Wall Bracing | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Jim Sly
|
|
|
Todd Phone #: ###-####
|
BLD-Foundation | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 8/11/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Phil Shearer
|
|
|
Pat Phone #: ###-#### Footings only no columns
|
PubWorks Subgrade Approval | 8/11/2014 | 8/11/2014 | 8/11/2014 | | DONE |
Jason C. Taylor
|
|
|
* FOOTINGS ONLY* NO COLUMNS* A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/7/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/7/2014 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 8/7/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (JG) | 7/17/2014 | 7/17/2014 | 8/6/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 8/05 T L2 Hillside ePlan**
|
Routing - PLAN CHECK | 8/4/2014 | | 8/6/2014 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2014 | | DONE |
|
|
|
|
1st review completed | | | 8/4/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLAN CHECK | 7/17/2014 | | 8/4/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan review
|
Routing - MECHANICAL | 7/17/2014 | | 7/21/2014 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 7/17/2014 | 7/17/2014 | 7/18/2014 | | PASS |
Scott Arellano
|
|
|
Approved. This structure has been evaluated for Fire Department Vehicle Access.
|
Routing PW Grading-Hillside | 7/17/2014 | | 7/18/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 7/17/2014 | | 7/18/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2014 | | 7/18/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 7/17/2014 | | 7/17/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection Required and Approved prior to Earth Disturbance. BMP's and Construction Signage to be posted as well prior to inspection
|
Plans ACCEPTED BY PLAN TECH | | | 7/17/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/17/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/17/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 7/17/2014 | | 7/17/2014 | | PASS |
Sue Cummings
|
|
|
|
Application received | | | 7/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 9 2014 10:46AM
|