Third Notice | | 11/14/2015 | 12/10/2015 | | DONE |
|
|
|
|
Second Notice | | 10/22/2015 | 11/9/2015 | | DONE |
|
|
|
sent in mail
|
First Notice | | 9/26/2015 | 10/12/2015 | | DONE |
|
|
|
sent in mail
|
Permanent Occupancy | | | 9/16/2015 | | DONE |
|
|
|
|
Telephone call | | | 8/31/2015 | | DONE |
|
|
|
called talked to Tom-he will come in and pick up the perm C of O with the sign off card
|
BLD-Final | 7/22/2015 | 7/23/2015 | 7/23/2015 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 7/22/2015 | 7/23/2015 | 7/23/2015 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Ok for perm occ. The interior wall and south exterior windows have been deleted from the scope of work. All work is completed.
|
BLD-Final | 7/22/2015 | 7/22/2015 | 7/22/2015 | P | CANC |
Mike Jordan
|
|
|
Joe Phone #: ###-####.Moved to am. inspection tomorrow.
|
BLD-Framing/Rough-in | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Framing and new headers for new door in east exterior wall.
|
Temporary Occupancy | 6/1/2015 | 8/30/2015 | 6/1/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Temporary Occupancy | 5/28/2015 | 3/30/2015 | 5/28/2015 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension thru 6-3-15
|
Telephone call | | | 5/28/2015 | | DONE |
|
|
|
called Tom to see if the final was ready so he could get his perm c of o-left message letting him know the temp expires on 6-3-15
|
Telephone call | | | 3/27/2015 | | DONE |
|
|
|
Tom called-he will get an email sent to Jason B requesting an extension on the temp co
|
Telephone call | | | 3/26/2015 | | DONE |
Candy A. Nichols
|
|
|
called Mike again to see if he's redy for the final-left message-
|
BLD-Final | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PART |
Mike Jordan
|
|
|
Joe Phone #: ###-####. All issues resolved. ok for perm occ./// status changed after speaking with Mike Jordan & Jason Blais as still need to install structural partition walls///cdp 12/5/14
|
Temporary Occupancy | 12/5/2014 | 3/5/2015 | 12/5/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 12/3/2014 | 12/4/2014 | 12/4/2014 | P | FAIL |
Mike Jordan
|
|
|
Joe Phone #: ###-####. Provide floor transitions from tile to concrete floors, remove the manual operated flush bolt from rear double door.
|
FIRE-Final Inspection | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 12/4/2014 | 12/4/2014 | 12/4/2014 | | PASS |
Josh Wilson
|
|
|
|
Print Occupancy Form | | | 12/2/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 12/2/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 12/2/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 10/27/2014 | 10/28/2014 | 10/28/2014 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
BLD-Footing | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Mike Jordan
|
|
|
Joe Phone #: ###-####
|
OVERRIDE | | | 8/13/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/13/2014 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 8/13/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 8/13/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (CJW) | 7/17/2014 | 7/17/2014 | 8/12/2014 | | PASS |
Carl Westfall
|
|
|
CALVARY CHAPEL YOUTH BUILDING - Level 3 TI - ePlanReview (15 days - Aug 4)
|
Routing - PLAN CHECK | 8/11/2014 | | 8/12/2014 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/11/2014 | | |
|
|
|
|
Routing - FIRE | 7/17/2014 | 7/17/2014 | 7/29/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 07-29-14
|
Plan resubmittals requested | | | 7/29/2014 | | DONE |
|
|
|
|
1st review completed | | | 7/29/2014 | | FAIL |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 7/17/2014 | | 7/29/2014 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - Design Review | 7/17/2014 | | 7/22/2014 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00152
|
Routing - Erosion and Sediment | 7/17/2014 | | 7/18/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designate RP.
|
Routing - PLANNING | 7/17/2014 | | 7/18/2014 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - Changing cafe'/bookstore into educational use.
The conversion from retail to school space is allowed as long as the overall school enrollment does not increase.
|
Routing - Addressing | 7/17/2014 | | 7/18/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/17/2014 | | 7/18/2014 | | PASS |
Beverly Mountain
|
|
|
|
Pending Assignment by JCB | 7/17/2014 | | 7/17/2014 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 7/15/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Intake Approval | | | 7/12/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
The scope of work includes change of occupancy occupancy in areas and increased occupancy in assembly area. Please complete the 520 major TI check list and upload any additional documents.
|
Application received | | | 7/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2014 3:18PM
|