First Notice | 2/17/2015 | 2/17/2015 | 3/3/2015 | | DONE |
Dave Hannah
|
|
|
mailed 3-4-15
|
BLD-Final | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | DONE |
Dave Hannah
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 1/22/2015 | 1/23/2015 | 1/24/2015 | P | PASS |
Dave Hannah
|
|
|
###-####-Ronnie
|
Issue PAID IN FULL permit | | | 1/7/2015 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 12/23/2014 | 1/15/2015 | 12/23/2014 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/15/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/15/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 7/15/2014 | | 7/15/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/15/2014 | | 7/15/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 7/15/2014 | | 7/15/2014 | | PASS |
Andy J. Long
|
|
|
Verified with Andy no ESC required. Each hole is 16 cubic feet. TLW
|
1st review completed | | | 7/15/2014 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/15/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/15/2014 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 7/15/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 7/15/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 7/15/2014 | | DONE |
Candy A. Nichols
|
|
|
called, left message on Mark's phone that permit was ready, what was owed and that he needs the GC form filled out
|
Intake Approval | | | 7/14/2014 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 7/14/2014 | | | |
|
|
|
|