First Notice | | 3/20/2015 | 5/6/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 3/10/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 2/26/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 2/26/2015 | 2/26/2015 | 2/26/2015 | | DONE |
Andrea Tuning
|
|
|
|
Temporary Occupancy | 12/10/2014 | 3/10/2015 | 12/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
BLD-Final | 12/9/2014 | 12/9/2014 | 12/9/2014 | P | PART |
Mike Jordan
|
|
|
later in afternoon/ call before//Kurt Phone #: ###-####. All issues resolved. ok for temp occ. Will be ok for perm occ once zoning signs perm.
|
BLD-Final | 12/5/2014 | 12/8/2014 | 12/8/2014 | P | FAIL |
Mike Jordan
|
|
|
Curt Phone #: ###-####. Provide lever hardware on door and key dead bolt from both sides.
|
Zoning Approval Temp | 12/5/2014 | 12/5/2014 | 12/5/2014 | | DONE |
Andrea Tuning
|
|
|
120-day temporary occupancy. The applicant has bonded for the striping, landscaping and bike rack.
|
FIRE-Final Inspection | 11/18/2014 | 11/19/2014 | 11/19/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide ADA approved single action hardware and remove thumb turn deadbolt prior to building inspection.
|
BLD-Framing/Rough-in | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Mike Jordan
|
|
|
Kirt Phone #: ###-####
|
BLD-Footing | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PASS |
Mike Jordan
|
|
|
Curt// plans are inside business Phone #: ###-####
|
OVERRIDE | | | 10/16/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/16/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/16/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/16/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2014 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 8/29/2014 | 8/29/2014 | 10/15/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed-New Commercial - ePlanReview - Roosters Automotive
|
Routing - PLAN CHECK | 10/15/2014 | | 10/15/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 10/15/2014 | | 10/15/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
code reference change completed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/13/2014 | | 10/13/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
change required on structural calcs was not addressed
|
Routing - PLAN CHECK | 10/8/2014 | | 10/10/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 10/8/2014 | | 10/10/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 9/19/2014 | 9/22/2014 | 9/23/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 9/19/2014 | | 9/19/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Routing Off Site - STRUCTURAL | 9/19/2014 | | 9/19/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
did not route back to structural, failed 1st review and requested documents were not resubmitted.
|
1st review completed | | | 9/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/29/2014 | | 9/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 9/2/2014 | | 9/18/2014 | | PASS |
Brian Murphy
|
|
|
bld < 1000ft2 on impervious compacted gravel per ward s. letter
|
Routing - FIRE | 8/29/2014 | 8/29/2014 | 9/11/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-11-14
|
Routing Off Site - STRUCTURAL | 8/29/2014 | | 9/5/2014 | | FAIL |
Jason Blais
|
|
|
Structural calculations are incomplete. Please provide backup calculations for calculation summary shown on pages 1 & 2, so that reviewer can complete this plan review.
|
Routing - Erosion and Sediment | 8/29/2014 | | 9/4/2014 | | PASS |
Evan Jenkins
|
|
|
Was able to determine total area of disturbance and corrected the Fee.
Approved
|
Routing - PUBLIC WORKS | 8/29/2014 | | 9/2/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Environmental | 9/2/2014 | | 9/2/2014 | | PASS |
Rick Christenson
|
|
|
|
Routing - Design Review | 8/29/2014 | | 9/2/2014 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH14-00202
|
Pending Assignment by JCB | 8/29/2014 | | 8/29/2014 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 8/29/2014 | | 8/29/2014 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 8/28/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Intake Approval | | | 8/27/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
8-27/14 I received the re submittal for the pre screen this morning. There is only 1 item remaining outstanding to accept the pre screen. There are 2 separate documents for the structural calculations. One is the title sheet and one is the calculations. A valid engineers stamp is required on these documents. Once that is received I can accept the plans in for plan review.
|
Intake Approval | | | 8/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Intake Approval | | | 7/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete the check list and upload all of the required documents.
The pre screen will not begin until the completed check list is received.
|
Application received | | | 7/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2014 1:54PM
|