BLD-Final | 4/27/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Phil Shearer
|
|
|
Jeremy Phone #: ###-####// please call 45min prior
|
DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 4/22/2015 | 4/22/2015 | 4/22/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | PASS |
Mike Jordan
|
|
|
Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Phil Shearer
|
|
|
Call 30 min before // Jeremy Phone #: ###-####
|
BLD-Framing/Rough-in | 2/10/2015 | 2/11/2015 | 2/11/2015 | P | FAIL |
Phil Shearer
|
|
|
Jeremy Phone #: ###-####. Headers not installed as per aproved pans, missing bracing on truss c-4, need fire blocking at froint entery.
|
BLD-Wall Bracing | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PASS |
Jim Storey
|
|
|
Jeremy-please call 45 min prior Phone #: ###-####
|
BLD-Wall Bracing | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | FAIL |
Dave Hannah
|
|
|
Jeremy Phone #: ###-#### needs to block and nail horz seams
|
Plan Modification Accepted | | | 1/23/2015 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/23/2015 | | 1/23/2015 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Phil Shearer
|
|
|
Request inspection about 9:00. We are scheduled to pour at 11 am Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Foundation | 10/30/2014 | 10/31/2014 | 10/31/2014 | A | PASS |
Phil Shearer
|
|
|
Request inspection about 9:00. We are scheduled to pour at 11 am Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | PASS |
Phil Shearer
|
|
|
Request early afternoon inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
OVERRIDE | | | 10/7/2014 | | |
|
|
|
|
PubWorks Subgrade Approval | 10/7/2014 | 10/7/2014 | 10/7/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Permit Ready to Issue | | | 10/7/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/7/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/7/2014 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/5/2014 | 9/5/2014 | 9/29/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/23 T L2 Hillside ePlan*
|
Routing - PLAN CHECK | 9/19/2014 | | 9/29/2014 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2014 | | DONE |
|
|
|
|
Routing - PLANNING | 9/26/2014 | | 9/26/2014 | | PASS |
David Moser
|
|
|
The retaining wall in side yard setback is only 5 feet high and driveway has been reduced to about 33 feet wide in the front yard setback
|
Routing PW Grading-Hillside | 9/26/2014 | | 9/26/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
1st review completed | | | 9/19/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - PLAN CHECK | 9/5/2014 | | 9/19/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 9/16/2014 | | 9/16/2014 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 9/5/2014 | 9/5/2014 | 9/11/2014 | | PASS |
Scott Arellano
|
|
|
This plan has been evaluated for Fire Department Vehicle Access.
|
Routing - MECHANICAL | 9/5/2014 | | 9/9/2014 | | FAIL |
Troy James
|
|
|
emailed corrections to air energy of idaho
|
Routing PW Grading-Hillside | 9/5/2014 | | 9/9/2014 | | FAIL |
Jason C. Taylor
|
|
|
Grading plna needs revised to match Planning & Zoning notes. Grading plan is not signed by the design engineer.
|
Routing - PLANNING | 9/5/2014 | | 9/8/2014 | | FAIL |
David Moser
|
|
|
The driveway exceeds 33 feet in width in front yard setback and the screen fence and retaining wall exceeds 6 feet in height in side yard
|
Routing - PUBLIC WORKS | 9/5/2014 | | 9/8/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Addressing | 9/5/2014 | | 9/8/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - Erosion and Sediment | 9/5/2014 | | 9/8/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection and Approval Required Prior to any Earth Disturbance
|
Recd Pcfee & Taken To Pln CK | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 9/5/2014 | | PASS |
Christina Prado
|
|
|
|
Intake Approval | | | 8/26/2014 | | FAIL |
Christina Prado
|
|
|
Needs stamped foundation plans, structural calcs and rescheck
|
Application received | | | 7/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 17 2014 2:25PM
|