BLD-Final | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | NH |
Jim Sly
|
|
|
Sara Phone #: ###-#### No Access.......Called Sara and left mssg to recall for insp.
|
BLD-Final | 2/17/2015 | 2/18/2015 | 2/18/2015 | A | PEND |
Tony Young
|
|
|
Sara Phone #: ###-####
|
Zoning Approval | 2/18/2015 | 2/18/2015 | 2/18/2015 | | DONE |
Matthew A Halitsky
|
|
|
|
BLD-Final | 2/17/2015 | 2/17/2015 | 2/17/2015 | P | PEND |
Tony Young
|
|
|
Sara Phone #: ###-####,, need zoning
|
BLD-Final | 2/13/2015 | 2/17/2015 | 2/17/2015 | A | NR |
Tony Young
|
|
|
Sara Phone #: ###-####,, needs historical
|
BLD-Wall Bracing | 12/15/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-#### Garage framing
|
BLD-Footing | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, appears to be located on lot per reviewed plans,, ftg is monolithic
|
Routing Walk-In (BLD) | 12/3/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Perry Paine
|
|
|
###12-3-2014 PROJECT MODIFIED TO REFLECT THE APPROVAL OF A MONOLYTHIC POUR FOR THE NEW 300S.F. DETACHED ACCESSORY STRUCTURE. NO ADDED VALUE. 12-3-2014 pep###
|
Case Summary (BLD) | | | 12/3/2014 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/3/2014 | | |
|
|
|
|
OVERRIDE | | | 11/25/2014 | | |
|
|
|
|
Routing Walk-In (Zoning) | 11/25/2014 | 11/25/2014 | 11/25/2014 | P | PASS |
Sue Cummings
|
|
|
|
Plan assigned to (PEP) | 11/25/2014 | 11/25/2014 | 11/25/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 11/25/2014 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 11/25/2014 | | DONE |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 11/25/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/25/2014 | | DONE |
Christina Prado
|
|
|
|
BLD-Energy code compliance | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PASS |
Tony Young
|
|
|
Sarah Kunz Phone #: ###-####
|
BLD-Framing/Rough-in | 11/4/2014 | 11/4/2014 | 11/4/2014 | P | PASS |
Jim Sly
|
|
|
Brandon Phone #: ###-####-call for access
|
Routing - MECHANICAL | 10/3/2014 | | 10/3/2014 | | PASS |
Troy James
|
|
|
|
BLD-Wall Bracing | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PART |
Tony Young
|
|
|
Partial only - Jim Phone #: ###-####,, roof ok to cover
|
Routing Walk-In (Zoning) | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | FAIL |
Matthew A Halitsky
|
|
|
Variance not yet approved.
|
BLD-Foundation | 8/13/2014 | 8/14/2014 | 8/15/2014 | A | PASS |
Dave Hannah
|
|
|
Roddy Phone #: ###-#### this was a footing inspection
|
BLD-Foundation | 8/14/2014 | 8/14/2014 | 8/14/2014 | P | PART |
Tony Young
|
|
|
Shawn-wall-pour time 3:30 Phone #: ###-####
|
OVERRIDE | | | 8/5/2014 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/18/2014 | 7/18/2014 | 7/18/2014 | P | PASS |
Andrea Tuning
|
|
|
|
Routing Walk-In (BLD) | 7/18/2014 | 7/18/2014 | 7/18/2014 | P | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/18/2014 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 7/18/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/18/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/18/2014 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 7/18/2014 | | DONE |
Barbara Stitt
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/18/2014 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 7/18/2014 | | | |
|
|
|
|