PubWorks Occupancy Approval | 1/26/2018 | 1/26/2018 | 1/26/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 7/10/2015 | 7/13/2015 | 7/13/2015 | A | PART |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Foundation | 7/9/2015 | 7/10/2015 | 7/10/2015 | P | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, work in progress on exterior stair foundation walls
|
BLD-Footing | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Jim Storey
|
|
|
Justin phone # ###-#### Please try to come up early AM ........if possible. Thanks!
|
BLD-Footing | 7/7/2015 | 7/7/2015 | 7/7/2015 | P | CANC |
Jim Sly
|
|
|
Justin Phone #: ###-#### Contractor Cancelled........Not Ready.
|
PubWorks Subgrade Approval | 7/6/2015 | 7/6/2015 | 7/6/2015 | | DONE |
Jason C. Taylor
|
|
|
* UPPER TWO STAIRS***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 6/30/2015 | 6/30/2015 | 6/30/2015 | P | PASS |
Phil Shearer
|
|
|
Justin Phone #: ###-####. Bottom 5 step of stairs up to the cul-de-sac.
|
PubWorks Subgrade Approval | 6/30/2015 | 6/30/2015 | 6/30/2015 | | DONE |
Jason C. Taylor
|
|
|
STEPS ONLY**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
PubWorks Subgrade Approval | 5/22/2015 | 5/22/2015 | 5/22/2015 | | DONE |
Jason C. Taylor
|
|
|
* LOWER ROCK RETAINING WALL**A letter from the applicant’s geotechnical engineer indicating that the rock wall subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Wall Bracing | 4/9/2015 | 4/10/2015 | 4/10/2015 | P | PART |
Tony Young
|
|
|
Justin Phone #: ###-####/// portion of upper block retaining wall along the driveway ok
|
PubWorks Subgrade Approval | 4/10/2015 | 4/10/2015 | 4/10/2015 | | DONE |
Jason C. Taylor
|
|
|
***WALL G STA 1+51 to 1+66 ONLY****A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 4/8/2015 | 4/9/2015 | 4/9/2015 | A | PART |
Tony Young
|
|
|
Early as possible - Justin Phone #: ###-####
|
BLD-Footing | 3/31/2015 | 3/31/2015 | 3/31/2015 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, center part of retaining wall G footing work in progress,, ok to pour when ready
|
BLD-Concrete | 3/20/2015 | 3/20/2015 | 3/20/2015 | P | PASS |
Tony Young
|
|
|
all concrete footings and retaining walls ok to this date,, per plan
|
BLD-Foundation | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PART |
Tony Young
|
|
|
Shaun Phone #: ###-####,, wall G,, masonary retaining wall,, work in progress,, need to add verticals,, and clean excess morter out
|
BLD-Wall Bracing | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PART |
Tony Young
|
|
|
Shaun Phone #: ###-####,, wanted block wall inspection for wall G,, work in progress
|
BLD-Footing | 3/17/2015 | 3/18/2015 | 3/18/2015 | A | PASS |
Tony Young
|
|
|
Sean Phone #: ###-####,, footing on the south side of the driveway ok
|
BLD-Footing | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | PEND |
Tony Young
|
|
|
Sean Phone #: ###-####,, need soils report
|
PubWorks Subgrade Approval | 3/17/2015 | 3/17/2015 | 3/17/2015 | | DONE |
Jason C. Taylor
|
|
|
*RETAINING WALL G ONLY*****A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 3/4/2015 | 3/5/2015 | 3/5/2015 | P | PART |
Tony Young
|
|
|
Retaning wall. late AM // Robert Phone #: ###-####
|
BLD-Wall Bracing | 3/4/2015 | 3/5/2015 | 3/5/2015 | A | PART |
Tony Young
|
|
|
Retaning wall. late AM // Robert Phone #: ###-####,, foundation wall,, not wall bracing
|
BLD-Footing | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PART |
Tony Young
|
|
|
Robert Phone #: ###-####,, ok to pour portion set up for C2
|
PubWorks Subgrade Approval | 3/4/2015 | 3/4/2015 | 3/4/2015 | | DONE |
Jason C. Taylor
|
|
|
* WALL "C" ONLY - It will bear on backfill for wall B2**** A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
BLD-Footing | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PEND |
Tony Young
|
|
|
Robert Phone #: ###-####
|
BLD-Footing | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | PEND |
Tony Young
|
|
|
Robert Phone #: ###-####,, pending soils report
|
BLD-Footing | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PEND |
Tony Young
|
|
|
Robert Phone #: ###-####
|
BLD-Foundation | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | PART |
Tony Young
|
|
|
Robert Phone #: ###-####,, B=2 wall
|
BLD-Footing | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Tony Young
|
|
|
Late AM // Robert Phone #: ###-####,, B-2 ftg and C-@ wall
|
BLD-Footing | 2/13/2015 | 2/13/2015 | 2/13/2015 | P | PART |
Tony Young
|
|
|
Robert Phone #: ###-####,, B-2 and S-C portion as noted on plans
|
Routing PW Grading-Hillside | 2/13/2015 | | 2/13/2015 | | PASS |
Jim Wyllie
|
|
|
Received subgrade inspection report from MTI. Okay to pour wall B2. Jim Wyllie / ###-####
|
BLD-Footing | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PART |
Tony Young
|
|
|
Sean Phone #: ###-####,, FOUNDATION,, WALL A OK
|
BLD-Footing | 1/30/2015 | 2/2/2015 | 2/2/2015 | P | CANC |
Tony Young
|
|
|
Sean Phone #: ###-####,, too much rain
|
BLD-Foundation | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PART |
Tony Young
|
|
|
Robert Phone #: ###-####,, B-1 wall ok
|
BLD-Footing | 1/26/2015 | 1/27/2015 | 1/27/2015 | A | PART |
Tony Young
|
|
|
late morning // Robert Phone #: ###-####,, Footing A and B-1 ok
|
PubWorks Subgrade Approval | 1/23/2015 | 1/23/2015 | 1/23/2015 | | DONE |
Jason C. Taylor
|
|
|
*WALL A & B-1 ONLY** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Other | 9/24/2014 | 9/25/2014 | 9/25/2014 | A | PART |
Jim Sly
|
|
|
Robert// retaining wall Phone #: ###-####// please try for late AM Wall "F" .....OK
|
BLD-Footing | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PART |
Tony Young
|
|
|
Late AM - Robert Phone #: ###-#### F ftg ok
|
PubWorks Subgrade Approval | 9/22/2014 | 9/22/2014 | 9/22/2014 | | DONE |
Jason C. Taylor
|
|
|
*WALL F ONLY** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PART |
Tony Young
|
|
|
Robert- retaining wall Phone #: ###-####,, E-LINE OK
|
BLD-Other | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Tony Young
|
|
|
Robert- retaining wall Phone #: ###-####,, e-line ok wall ok
|
BLD-Footing | 9/5/2014 | 9/5/2014 | 9/5/2014 | A | PASS |
Jim Storey
|
|
|
pour time 10:00 ft e-line
|
Plan assigned to (JG) | 8/27/2014 | 8/27/2014 | 9/5/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, Plan Mod Retaining Wall
|
Case Summary (BLD) | | | 9/5/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2014 | | DONE |
|
|
|
|
Telephone call | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
called Sean to let know resubmitted plans are ready and how much is owed
|
(F) Reprint permit | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | 8/29/2014 | | 9/5/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 9/4/2014 | | DONE |
Candy A. Nichols
|
|
|
received resubmittals- 1 set of each transmittal letter from Briggs Engineering, 1 sheet (11x17)stair section, 1 each of sheet-C1,C2,C3,C4,C5,C6,C7,C8,C9,C10,C11,C12,C13,C14 & C15-Took to JG
|
Plan resubmittals received | | | 9/3/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised retaining wall plans C1, C-10 & C-11, two revised structural calcs and two revised stair detail sheet marked C-10-1; Plans stamped and taken to Javier for review
|
PubWorks Subgrade Approval | 8/29/2014 | 8/29/2014 | 8/29/2014 | | DONE |
Jason C. Taylor
|
|
|
* WALL "E" ONLY**** A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing - PLAN CHECK | 8/27/2014 | | 8/29/2014 | | FAIL |
Javier Guzman
|
|
|
emailed applicant plan mod review report
|
Routing Off Site - STRUCTURAL | 8/27/2014 | | 8/29/2014 | | FAIL |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 8/27/2014 | | DONE |
Candy A. Nichols
|
|
|
received 2 sets of C1, C2, C3, C4, C5, C6, C7, C8, C9, C10, C11, C12, C13, C14, C15. Also 2 sets of Briggs Engineering cals w/transmittal sheet took to Javier G
|
OVERRIDE | | | 8/11/2014 | | |
|
|
|
|
Telephone call | | | 8/11/2014 | | DONE |
Tisha Gallop
|
|
|
called Sean and told him permit is ready and fee due.
|
Issue PAID IN FULL permit | | | 8/11/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 8/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/11/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (JG) | 7/21/2014 | 7/21/2014 | 8/8/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 8/07 TH L2 Retaining Wall
|
Case Summary (BLD) | | | 8/8/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2014 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/8/2014 | | |
|
|
|
Received 1 cover transmittal, 2 Signed & Stamped sheets of 1 & 11, 2 Calcs for RW F-4.5, 2 Calcs for RW F-5.5 and taken to Javier's desk
|
Routing - PLAN CHECK | 8/4/2014 | | 8/8/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 8/7/2014 | | |
|
|
|
Received 1 cover transmittal, 2 Signed & Stamped sheets of 1 & 11, 2 Calcs for RW F-4.5, 2 Calcs for RW F-5.5 and taken to Javier's desk
|
Routing Off Site - STRUCTURAL | 7/25/2014 | | 8/4/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 7/24/2014 | | 8/4/2014 | | FAIL |
Javier Guzman
|
|
|
Sent review report to applicant
|
1st review completed | | | 8/4/2014 | | FAIL |
Javier Guzman
|
|
|
|
Telephone call | | | 7/25/2014 | | DONE |
Tisha Gallop
|
|
|
called Action Couriers for pick up
|
Routing - PLANNING | 7/24/2014 | | 7/24/2014 | | PASS |
Cody Riddle
|
|
|
Cody Riddle CFH14-00017/ Retaining walls shall not exceed 3' in height in front setback or 6' in side and rear.
|
Routing - Erosion and Sediment | 7/24/2014 | | 7/24/2014 | | PASS |
Andy J. Long
|
|
|
Reference ESC14-00664. ESC plan submitted with rough grading permit application. Approved.
|
Routing PW Grading-Hillside | 7/23/2014 | | 7/23/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - Addressing | 7/21/2014 | | 7/23/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 7/21/2014 | 7/21/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/21/2014 | | DONE |
Barbara Stitt
|
|
|
|