First Notice | 4/7/2015 | 4/7/2015 | 4/9/2015 | | DONE |
Mike Jordan
|
|
|
This permit finaled on the web by Jeremy Barber
|
Letter of compliance/Occupancy | | | 4/8/2015 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Jeremy Barber
|
DOC - Permit Finaled | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Mike Jordan
|
|
|
|
Zoning Approval | 4/6/2015 | 4/6/2015 | 4/6/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | NR |
Jim Sly
|
|
|
The only note to add is that the permit was changed to a shell permit and not the whole building. I think this was already changed in the system by Carl who is aware of the different contractor for the interior of the building. Phone #: ###-#### Inspection requested via web by Jeremy Bar Complete all required final inspections prior to calling for Structural final.
|
PubWorks Occupancy Approval | 4/2/2015 | 4/2/2015 | 4/2/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Conference | 2/4/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Mike Jordan
|
|
|
Darin Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2015 | 2/5/2015 | 2/5/2015 | A | PASS |
Mike Jordan
|
|
|
Darin Phone #: ###-####. Exterior steel stud framed walls, Structural steel. Also reviewed all special inspection reports to date.
|
BLD-Foundation | 12/12/2014 | 12/15/2014 | 12/15/2014 | A | DEFR |
Mike Jordan
|
|
|
Darren-pour time 10:00 Phone #: ###-####. Special inspectoron site.
|
BLD-Footing | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PASS |
Mike Jordan
|
|
|
Aaron-please call 30 minutes prior to meet Phone #: ###-####
|
OVERRIDE | | | 12/6/2014 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/17/2014 | | DONE |
Brittany Hill
|
|
|
|
Issue PAID IN FULL permit | | | 11/17/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/17/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/12/2014 | | DONE |
Brittany Hill
|
|
|
|
Routing Off Site - STRUCTURAL | 11/12/2014 | | 11/12/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/12/2014 | | 11/12/2014 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/12/2014 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 8/25/2014 | | 11/12/2014 | | PASS |
|
|
|
First review completed
|
Routing - Design Review | 11/6/2014 | | 11/6/2014 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLUMBING | 10/21/2014 | | 10/21/2014 | | PASS |
Daryl Spivey
|
|
|
RPBP required on water line to filtered water.
|
Routing - Design Review | 10/20/2014 | | 10/20/2014 | | FAIL |
Andrea Tuning
|
|
|
Street trees shall be Class II or Class III. They should also be lcoated outside of the irrigation easement and the ROW to be dedicated to ACHD. The light poles are required to be located outside of the required planter islands as well.
|
Route to Impact Fee Review | 9/23/2014 | 9/26/2014 | 9/26/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Solid Waste | 8/25/2014 | | 9/23/2014 | | PASS |
Peter J. McCullough
|
|
|
|
1st review completed | | | 9/23/2014 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 8/25/2014 | | 9/23/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing PW Street Lights | 8/25/2014 | | 9/23/2014 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PLAN CHECK | 8/25/2014 | | 9/23/2014 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 8/25/2014 | | 9/18/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLANNING Land Div | 8/25/2014 | | 9/18/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 8/25/2014 | | 9/2/2014 | | PASS |
|
|
|
See Fire Plan Review 09-02-14
|
Routing PW Drainage | 8/25/2014 | | 9/2/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 8/25/2014 | | 8/27/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLUMBING | 8/25/2014 | | 8/27/2014 | | FAIL |
Daryl Spivey
|
|
|
RPBP required on filtered water line, soda machines and other equipment may require additional backflow protection.
Floor sink under food prep sink to drain to grease intercepter.
|
Routing PW Sewer Rating | 8/25/2014 | | 8/26/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Design Review | 8/25/2014 | | 8/25/2014 | | FAIL |
Andrea Tuning
|
|
|
Street trees shall be Class II or Class III. They should also be lcoated outside of the irrigation easement and the ROW to be dedicated to ACHD. The light poles are required to be located outside of the required planter islands as well.
|
Routing - Addressing | 8/25/2014 | | 8/25/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/25/2014 | | 8/25/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 8/25/2014 | | 8/25/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid PD designated, RP tbd.
|
Intake Approval | | | 8/25/2014 | | PASS |
John Menard
|
|
|
|
Intake Approval | | | 8/11/2014 | | FAIL |
John Menard
|
|
|
Please submit the required structural calculations. The structural design loads are included on plan sheet S-1; however, those are not the structural calculations. Please request an electonic copy from the project structural engineer to upload to ProjectDox.
|
Intake Approval | | | 7/24/2014 | | FAIL |
John Menard
|
|
|
1. Please submit the required Statement of Special Inspection Form, completed by the design structural engineer.
2. Please submit the required building structural calculations.
3. Please submit the required Food Establishment Plan Review and Approval Form.
4. Please submit the required Building Envelope Compliance.
5. Please submit a copy of the heating and cooling load calculations used in determining the required equipment sizing.
|
Application received | | | 7/22/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 22 2014 3:13PM
|
Pending Assignment by JCM | 8/25/2014 | | | | |
John Menard
|
|
|
|