Print Statement | | | 6/9/2015 | | DONE |
Rita DeYoung
|
|
|
|
Print Statement | | | 1/23/2015 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 12/29/2014 | 1/2/2015 | | DONE |
Christina Prado
|
|
|
|
Permanent Occupancy | | | 12/19/2014 | | DONE |
|
|
|
|
BLD-Final | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | CANC |
Mike Jordan
|
|
|
Keith Phone #: ###-####
|
BLD-Final | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Mike Jordan
|
|
|
call from keith to change time//keith Phone #: ###-####. Ok for perm occ.
|
Zoning Approval | 12/17/2014 | 12/17/2014 | 12/17/2014 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 12/12/2014 | 12/12/2014 | 12/12/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 12/8/2014 | 12/11/2014 | 12/12/2014 | A | PART |
Craig D. Hanson
|
|
|
3 exit signs need added. 1 in back middle of sales floor and one on each side of front of sales floor
|
BLD-Ceiling Grid Inspection | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Mike Jordan
|
|
|
Keith Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | NR |
Mike Jordan
|
|
|
Keith Phone #: ###-####
|
BLD-Conference | 11/10/2014 | 11/12/2014 | 11/12/2014 | A | CANC |
Mike Jordan
|
|
|
keith Phone #: ###-####
|
OVERRIDE | | | 10/24/2014 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/24/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 10/24/2014 | | 10/24/2014 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/24/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/24/2014 | | DONE |
Christina Prado
|
|
|
Called Hayward Construction to advise revisded sheets are ready - no fees per Carl Madsen
|
Permit Ready to Issue | | | 10/24/2014 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 10/23/2014 | | DONE |
Christina Prado
|
|
|
Received two sets of revised plan sheets marked T1.0, A1.0, A11.0, E2.0, E5.0 & E8.0;Plans taken to carl Madsen for further review and issuance
|
FIRE-Conference | 10/7/2014 | 10/8/2014 | 10/8/2014 | A | DONE |
Troy Cobbley
|
|
|
I verified that the insulation was being installed in the entire space for the overbuild where the anti-freeze system has been removed and fire stopped to less that 1,000 cublc feet per compartment. Keith Phone #: ###-####
|
FIRE-Conference | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | DONE |
Troy Cobbley
|
|
|
Keith and I verified the overbuild where the anti-freeze system was removed is now compartmentized to individual areas less than 1,000 cubic feet. Will need to re-inspect when filled with insulation.
|
BLD-Framing/Rough-in | 9/23/2014 | 9/24/2014 | 9/24/2014 | A | PART |
Mike Jordan
|
|
|
Keith Phone #: ###-####. Hardlids for restrooms , corridor and office, need detaild from architect. Towers at front entry.
|
BLD-Energy code compliance | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Mike Jordan
|
|
|
Keith Phone #: ###-####. Exterior furred out walls ok.
|
BLD-Framing/Rough-in | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PART |
Mike Jordan
|
|
|
Keith Phone #: ###-####. interior steel stud framed walls ok, pending electrical rough in inspection.
|
CHANGE STATUS TO (ISS) | | | 9/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 9/8/2014 | | DONE |
Candy A. Nichols
|
|
|
called DAvid to let know plan mod is ready-left message on his phone
|
Plan assigned to (CDM) | 9/2/2014 | 9/2/2014 | 9/5/2014 | | PASS |
Carl D Madsen
|
|
|
plan mod
|
Routing - PLANNING | 9/4/2014 | | 9/5/2014 | | PASS |
Andrea Tuning
|
|
|
Plan modification changes.
|
Routing - PLAN CHECK | 9/5/2014 | | 9/5/2014 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 9/5/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/5/2014 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/2/2014 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for additional coordination between drawings which consisted of adding a site detail sheet. Additional explanation can be found in the enclosed revision narrative letter. All changes were strictly for coordination and did not affect structural, MEP, and life safety; submitted on plan sheets T1.0, LS1.0, AS1.0, AS1.1, A1.0, A1.2, A2.0, A2.2, A3.0, A3.1, A4.0, A4.1, A5.0, A6.0, A7.0, A7.1, A9.0, A9.1, A9.3, A11.0, A11/1, A11.3, A11.4, A12.0, A12.1, A12.2, A12.4, A12.5, A12.6, A12.7; routed to Carl Madsen.
|
BLD-Footing | 8/26/2014 | 8/27/2014 | 8/27/2014 | A | PART |
Mike Jordan
|
|
|
Keith-would like late AM if possible Phone #: ###-####. Work in progress on column pad footings in front of store for new facade and canopy. Will have special inspection.
|
Issue PAID IN FULL permit | | | 8/22/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 8/18/2014 | | |
|
|
|
|
Plan assigned to (CDM) | 7/29/2014 | 7/29/2014 | 8/18/2014 | | PASS |
Carl D Madsen
|
|
|
Dick's Sporting Goods
|
Routing - PLAN CHECK | 8/14/2014 | | 8/18/2014 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/4/2014 | | 8/18/2014 | | PASS |
Carl D Madsen
|
|
|
|
Telephone call | | | 8/18/2014 | | DONE |
Tisha Gallop
|
|
|
called David Cowen and told him permit is ready, fees due, and need RP.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/18/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/18/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 8/15/2014 | | DONE |
|
|
|
rec'd response letter, calcs and two copies of sheets ME2.0; P1.0; P2.0 - taken to cdm
|
Routing - FIRE | 8/13/2014 | 8/13/2014 | 8/14/2014 | | PASS |
|
|
|
See Fire Plan Review 08-14-14
|
1st review completed | | | 8/13/2014 | | DONE |
|
|
|
|
Routing - PLUMBING | 8/14/2014 | | 8/13/2014 | | PASS |
Bill VanDegrift
|
|
|
replace R.P. on service with a DCVA
|
Routing - PLUMBING | 7/31/2014 | | 8/4/2014 | | FAIL |
Bill VanDegrift
|
|
|
change water service backflow protection to a DCVA or provide a 4" floor sink
|
Routing - PLANNING | 8/4/2014 | | 8/4/2014 | | PASS |
Andrea Tuning
|
|
|
DRH14-00231 Andrea
|
Routing - Erosion and Sediment | 7/31/2014 | | 7/31/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be designated.
|
Routing - PUBLIC WORKS | 7/29/2014 | | 7/31/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Sewer Rating | 7/29/2014 | | 7/30/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | 7/23/2014 | 7/29/2014 | | DONE |
|
|
|
|
Routing - Addressing | 7/29/2014 | | 7/29/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2014 | | DONE |
|
|
|
|
Application received | | 7/23/2014 | 7/23/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/23/2014 | | DONE |
Tisha Gallop
|
|
|
|