Second Notice | | 6/20/2015 | 6/19/2015 | | DONE |
|
|
|
This permit finaled on the web by Dawn Jennings
|
First Notice | | 5/23/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Permanent Occupancy | | | 5/13/2015 | | DONE |
|
|
|
|
BLD-Final | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | PASS |
Mike Jordan
|
|
|
Anita Phone #: ###-####. Ok for perm occ.
|
BLD-Ceiling Grid Inspection | 5/1/2015 | 5/4/2015 | 5/4/2015 | A | PASS |
Mike Jordan
|
|
|
Anita Phone #: ###-####
|
FIRE-Final Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Address has been updated in the GIS per Tim to the 1203.
|
Zoning Approval | 4/29/2015 | 4/29/2015 | 4/29/2015 | | PASS |
Josh Wilson
|
|
|
|
BLD-Framing/Rough-in | 3/12/2015 | 3/16/2015 | 3/16/2015 | A | PASS |
Mike Jordan
|
|
|
Small building in parking lot behind the temple // Kent Phone #: ###-####. Interior steel stud framed walls ok, exterior wood frameing for west windows ok, ledger not yet installed for exterior brick.
|
Permit Ready to Issue | | | 1/28/2015 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/28/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/28/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/27/2015 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Expiration Notice | 12/30/2014 | 1/22/2015 | 12/30/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - FIRE | 10/2/2014 | | 10/6/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 10-06-14
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2014 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/27/2014 | | 10/6/2014 | | PASS |
Tim L. Woodard
|
|
|
1st Review Complete
|
Routing - PLAN CHECK | 10/2/2014 | | 10/2/2014 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 9/17/2014 | | DONE |
|
|
|
|
Routing - FIRE | 8/27/2014 | | 9/17/2014 | | FAIL |
Craig D. Hanson
|
|
|
No report at this time. Will re-examine after occupant classification and load has been eastablished.
|
Routing PW Sewer Rating | 8/28/2014 | | 9/15/2014 | | PASS |
Jennifer Bruner
|
|
|
Passed in E-Plan Review. TLW
|
Routing - PLAN CHECK | 8/27/2014 | | 9/15/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to change marks on the drawings. TLW
|
Routing - PLANNING | 8/27/2014 | | 9/5/2014 | | PASS |
Sarah Schafer
|
|
|
Project was discussed with Cody Riddle. Use is accessory to the main use as a church which holds a valid CU.
|
Routing - Addressing | 8/27/2014 | | 8/28/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/27/2014 | | 8/28/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 8/27/2014 | | PASS |
|
|
|
|
Intake Approval | | | 7/31/2014 | | FAIL |
Tim L. Woodard
|
|
|
Valerie,
Looks good. The only thing still missing is the form #304 and the #518 submittal checklist. Please upload those last two things in the documents folder and the review will begin.
Please call with any questions,
Tim Woodard
|
Intake Approval | | | 7/24/2014 | | FAIL |
Tim L. Woodard
|
|
|
Valerie,
Please upload each plan sheet individually into the documents folder. I've already transfered your Calcs to the Documents folder. Please upload the submittal checklist and form #304. Go over the "Electronic Standards" document I attached to the email I sent you. It will tell you how we need a "Stamping area" on each sheet, when you upload the sheets individually you should give them each a name (for example: A1.0 Floor Plan, A2.0 Reflected Ceiling, etc.).
Please call with any questions,
Tim Woodard
|
Application received | | | 7/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 23 2014 4:28PM
|