Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD14-02112
StatusFinaled
Name WOOD RIVER BUILDERS
Site Address 4318 N ARROW VILLA WAY
Project Name4318 Arrow villa
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2643 sq. ft., two story (first story 1530 sq. ft., second story 1113 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 239 sq. ft. of covered patio/porch and a 660 sq. ft. attached garage per the approved plans, prescriptive energy, plan review report and any notations, structural engineering for foundation, lateral, column and beams. A-1 zoning and setbacks per planning. ajs A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/10/201411/10/201411/10/2014PPASS
DetailsJim Sly
Bob Phone #: ###-####
DOC - Permit Finaled11/10/201411/10/201411/10/2014PPASS
DetailsJim Sly
PubWorks Occupancy Approval11/10/201411/10/201411/10/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Final11/7/201411/7/201411/7/2014PNR
DetailsTony Young
Bobbie Phone #: ###-####
BLD-Other10/16/201410/16/201410/16/2014PPART
DetailsTony Young
Bob-fire rated soffits Phone #: ###-####,, work in progress,, ok
BLD-Wall Bracing10/3/201410/3/201410/3/2014PPART
DetailsJim Sly
Bob-interior shear Phone #: ###-####
Finishing up attachment.
BLD-Energy code compliance9/30/201410/1/201410/1/2014PPASS
DetailsTony Young
Robert Phone #: ###-####
BLD-Framing/Rough-in9/29/20149/30/20149/30/2014APASS
DetailsTony Young
Bob Phone #: ###-####
BLD-Wall Bracing9/17/20149/17/20149/17/2014PPASS
DetailsTony Young
Bob Phone #: ###-####,, exterior ok,, will need alt holdowns on rear dining wall
BLD-Wall Bracing9/16/20149/17/20149/17/2014ADEFR
DetailsTony Young
Bob Phone #: ###-####,, to pm
BLD-Foundation8/21/20148/22/20148/22/2014APART
DetailsTony Young
Pat Phone #: ###-####
BLD-Footing8/21/20148/21/20148/21/2014PPASS
DetailsTony Young
Pat Phone #: ###-####
PubWorks Subgrade Approval8/21/20148/21/20148/21/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
OVERRIDE  8/19/2014  
Issue PAID IN FULL permit  8/19/2014 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  8/19/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  8/19/2014 DONE
DetailsBarbara Stitt
Plan assigned to (AJS)8/13/20148/13/20148/18/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed 8/18 M L2 Hillside ePlan**
1st review completed  8/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK8/18/2014 8/18/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/18/2014 DONE
Routing - PLAN CHECK8/13/2014 8/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in ePlan review
Plan assigned to (JG)7/30/20147/30/20148/13/2014 DEFR
DetailsJavier Guzman
8/18 M L2 Hillside ePlan**
Routing - MECHANICAL7/30/2014 8/4/2014 PASS
DetailsTroy James
Routing - FIRE7/30/20147/30/20148/1/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire Department Vehicle Access.
Routing PW Grading-Hillside7/30/2014 7/31/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLANNING7/30/2014 7/30/2014 PASS
DetailsSue Cummings
Routing - Addressing7/30/2014 7/30/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS7/30/2014 7/30/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment7/30/2014 7/30/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection w/ Approval Required Prior to earth disturbance
Plans ACCEPTED BY PLAN TECH  7/30/2014 DONE
DetailsChristina Prado
Intake Approval  7/30/2014 PASS
Recd Pcfee & Taken To Pln CK  7/30/2014 DONE
DetailsChristina Prado
Application received  7/24/2014 DONE
Application submitted via PDS Online on Jul 24 2014 10:43AM