DOC - Permit Expired | | | 10/31/2018 | | DONE |
|
|
|
No request for inspections since 8-4-2015. permit expired. Reactivation or new permit required.
|
(F) Reprint permit | | | 8/3/2016 | | DONE |
|
|
|
|
BLD-Conference | 7/27/2016 | 7/27/2016 | 7/27/2016 | P | DONE |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2015 | 8/4/2015 | 8/4/2015 | A | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 4/14/2015 | 4/14/2015 | 4/14/2015 | P | DONE |
Jim Sly
|
|
|
Mike Phone #: ###-#### WIP
|
BLD-Framing/Rough-in | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | PART |
Jim Sly
|
|
|
Mike-outsdie wall structure-please call to meet Phone #: ###-#### n. s. and w. wall ok for shear nailing.
|
CHANGE STATUS TO (ISS) | | | 9/26/2014 | | DONE |
Candy A. Nichols
|
|
|
no final for the renewal of this permt has been done according to homeowner.
|
BLD-Conference | 9/2/2014 | 9/10/2014 | 9/10/2014 | A | DONE |
Jim Sly
|
|
|
Obtained Permit.
|
DOC - Permit Finaled | 9/10/2014 | 9/10/2014 | 9/10/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 9/3/2014 | 9/3/2014 | 9/4/2014 | P | DONE |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | NH |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Meeting | | | 8/22/2014 | | DONE |
Christina Prado
|
|
|
Per revised calculations and receipts turned in by applicant value reduced from 22,080 to 8,000 per JCB 8/22/14
|
OVERRIDE | | | 7/25/2014 | | |
|
|
|
|
Application received | | 7/25/2014 | 7/25/2014 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/25/2014 | 7/25/2014 | 7/25/2014 | A | DONE |
Bruce Eggleston
|
|
|
|
Routing Walk-In (BLD) | 7/25/2014 | 7/25/2014 | 7/25/2014 | A | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 7/25/2014 | | DONE |
Javier Guzman
|
|
|
|
Inspection Record Card- Bld | | | 7/25/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 7/25/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/25/2014 | | DONE |
Tisha Gallop
|
|
|
|