Permit Information
Permit NumberBLD14-02153
StatusFinaled
Name SHILOH BUILDERS LLC
Site Address 5376 N GOLDIE PL
Project NameSorenson Residence
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2076 sq. ft., two story (first story 566 sq. ft., second story 1510 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, and a 1078 sq. ft. attached garage per the approved plans, plan review report, engineering, and any notations. R-1A zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/26/201412/26/201412/26/2014PPASS
DetailsPhil Shearer
Call Dan for access Phone #: ###-#### Inspection requested via web by Daniel Appel
DOC - Permit Finaled12/26/201412/26/201412/26/2014PPASS
DetailsPhil Shearer
PubWorks Occupancy Approval12/24/201412/24/201412/24/2014 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance11/4/201411/4/201411/4/2014PPASS
DetailsTony Young
Dan Appel Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Framing/Rough-in11/3/201411/4/201411/4/2014APASS
DetailsTony Young
Dan Appel Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Framing/Rough-in10/30/201411/3/201411/3/2014PPART
DetailsTony Young
Dan Appel Phone #: ###-#### Inspection requested via web by Daniel Appel,, frame ok,, ok to insulate
BLD-Framing/Rough-in10/28/201410/29/201410/29/2014APART
DetailsTony Young
Late AM please call Dan when 30 minutes out Phone #: ###-#### Inspection requested via web by Daniel Appel,, need to provide fire blocking at ceiling lines,, strap plates ,, carry roof load direct on single top plates,, ok to insulate
BLD-Conference10/27/201410/27/201410/27/2014PDONE
DetailsPhil Shearer
Question regarding Canned lights in fire rated soffitt areas. You could call my electrician, Bob Schroder ###-#### in lieu of a site visit Phone #: ###-#### Inspection requested via web by Daniel Appel
Plan Modification Accepted  10/27/2014 DONE
new manual j report
Routing - MECHANICAL10/27/2014 10/27/2014 PASS
DetailsTroy James
resubmitted manual j report
BLD-Conference10/23/201410/23/201410/23/2014PPASS
DetailsTony Young
Dan ###-####,, ? on drilling for wires
BLD-Wall Bracing10/20/201410/21/201410/21/2014APASS
DetailsTony Young
Dan Appel Phone #: ###-#### Inspection requested via web by Daniel Appel
BLD-Wall Bracing10/17/201410/20/201410/20/2014APEND
DetailsTony Young
Dan Appel Phone #: ###-#### Inspection requested via web by Daniel Appel,, need to see if plans show shear walls,, called Dan
BLD-Foundation9/22/20149/23/20149/23/2014PPART
DetailsTony Young
Dane Phone #: ###-####,, work in progress,, ok basement walls
BLD-Footing9/17/20149/18/20149/18/2014PPASS
DetailsPhil Shearer
Dane Phone #: ###-####
BLD-Footing9/16/20149/17/20149/17/2014ANR
DetailsTony Young
Dane Phone #: ###-####,, late
BLD-Footing9/16/20149/16/20149/16/2014PNR
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing9/15/20149/16/20149/16/2014ANR
DetailsTony Young
Dane Phone #: ###-####
BLD-Footing9/12/20149/15/20149/15/2014PNR
DetailsTony Young
Dane Phone #: ###-####
PubWorks Subgrade Approval9/15/20149/15/20149/15/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  8/29/2014  
Issue PAID IN FULL permit  8/29/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  8/29/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  8/29/2014 DONE
DetailsChristina Prado
Plan assigned to (AJS)8/13/20148/13/20148/21/2014 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed 8/19 T L2 Hillside ePlan**
Routing - PLANNING8/21/2014 8/21/2014 PASS
DetailsDavid Moser
Routing - PLAN CHECK8/21/2014 8/21/2014 PASS
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  8/21/2014 DONE
1st review completed  8/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK8/13/2014 8/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
see change marks in e plan
Plan assigned to (JG)8/1/20148/1/20148/13/2014 DEFR
DetailsJavier Guzman
8/19 T L2 Hillside ePlan**
Routing - FIRE8/1/20148/1/20148/8/2014 PASS
DetailsScott Arellano
This structure has been evaluated for FD vehicle access. This structure shall comply with the provisions for defensible space as defined in BMC 7-01-69 section 4920 and be subject to periodic inspection by Boise Fire department Wildland Urban Interface mitigation team.
Routing PW Grading-Hillside8/1/2014 8/5/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - MECHANICAL8/1/2014 8/5/2014 PASS
DetailsTroy James
Routing - PLANNING8/1/2014 8/1/2014 FAIL
DetailsDavid Moser
need to show the covered patio posts on site plan to confirm setbacks.
Routing - Addressing8/1/2014 8/1/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/1/2014 8/1/2014 PASS
DetailsJennifer Bruner
Case Summary (BLD)  8/1/2014 DONE
Intake Approval  8/1/2014 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/1/2014 DONE
DetailsTisha Gallop
Routing - Erosion and Sediment8/1/2014 8/1/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection Required Prior to Earth Disturbance
Intake Approval  7/30/2014 FAIL
DetailsChristina Prado
Need engineering stamp on foundation, wall detail
Application received  7/29/2014 DONE
Application submitted via PDS Online on Jul 29 2014 11:17AM