DOC - Permit Finaled | | | 11/21/2016 | | DONE |
|
|
|
Final inspection passed 11-19-16
|
Letter of compliance/Occupancy | | | 11/21/2016 | | DONE |
|
|
|
|
BLD-Final | 11/15/2016 | 11/15/2016 | 11/19/2016 | P | DONE |
Dave Hannah
|
|
|
Building Final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Final | 11/17/2016 | 11/18/2016 | 11/19/2016 | P | PASS |
Dave Hannah
|
|
|
Building final Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/15/2016 | P | PASS |
Jim Page
|
|
|
Fial life fire safety inspection passed/complete
|
PubWorks Occupancy Approval | 11/15/2016 | 11/15/2016 | 11/15/2016 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 11/8/2016 | 11/10/2016 | 11/9/2016 | A | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-#### Inspection cancelled from web by: Michael Zaccheo
|
BLD-Final | 10/28/2016 | 10/31/2016 | 11/1/2016 | P | NR |
Dave Hannah
|
|
|
Final after Fire/Life/Safety inspection. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
FIRE-Final Inspection | 10/28/2016 | 10/31/2016 | 10/31/2016 | A | PASS |
Katie Marron
|
|
|
No inspection required. Foundation permit. No changes to FD Access or hydrants.
|
BLD-Aging Inspection | 8/25/2016 | 8/25/2016 | 8/30/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/24/2016 | 8/24/2016 | 8/30/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Wall cover | 4/11/2016 | 4/12/2016 | 4/12/2016 | P | PASS |
Dave Hannah
|
|
|
2 hr assembly in storage room south of utility shaft on 2nd level. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Energy code compliance | 4/4/2016 | 4/4/2016 | 4/5/2016 | P | PASS |
Dave Hannah
|
|
|
Envelope inspection on 2nd level hard lid. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Wall cover | 4/1/2016 | 4/4/2016 | 4/4/2016 | P | PEND |
Dave Hannah
|
|
|
2 hr assembly in storage closet south of utility shaft. Phone #: ###-#### Inspection requested via web by Michael Zaccheo issued n/c
|
BLD-Conference | 4/23/2015 | 4/23/2015 | 4/4/2016 | P | CANC |
Dave Hannah
|
|
|
Concern project isn''t being done correctly Inspection cancelled from web by: Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Dave Hannah
|
|
|
Re-inspection fire caulking 2nd level ceiling. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Framing/Rough-in | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Dave Hannah
|
|
|
Steel stud framing on levels 1 and 2. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Ceiling Grid Inspection | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | NR |
Dave Hannah
|
|
|
Fire caulking and ceiling fat grid 2nd level. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD-Foundation | 10/21/2015 | 10/22/2015 | 10/23/2015 | A | PEND |
Dave Hannah
|
|
|
Rebar // Mike Phone #: ###-####ok after spec insp sign off
|
BLD-Conference | 8/21/2015 | 8/24/2015 | 8/24/2015 | A | DONE |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Foundation | 6/5/2015 | 6/8/2015 | 6/9/2015 | P | PASS |
Dave Hannah
|
|
|
Mike-wall Phone #: ###-####
|
BLD-Footing | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | CANC |
Dave Hannah
|
|
|
Mike Phone #: ###-####
|
BLD-Conference | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Dave Hannah
|
|
|
Mike-please call 10 minutes prior Phone #: ###-####
|
BLD-Conference | 4/14/2015 | 4/15/2015 | 4/15/2015 | A | DONE |
Dave Hannah
|
|
|
MIke Phone #: ###-####
|
Issue PAID IN FULL permit | | | 4/14/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/14/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/2/2015 | | |
|
|
|
|
Permit Ready to Issue | | | 4/2/2015 | | DONE |
|
|
|
ACHD Complete. Need GC, RP and Revised Cert of Value
|
Routing PW Sewer Design | 2/5/2015 | | 2/5/2015 | | PASS |
Kyle S. Rosenmeyer
|
|
|
resubmitted plans received 02/04/2015 showing revised sewer plans
|
Plan resubmittals received | | | 2/5/2015 | | DONE |
Kyle S. Rosenmeyer
|
|
|
Received sheets C1.0 Site Demolition Plan and C4.0 Site Utility Plan
|
Extend Review Timeline | | | 1/15/2015 | | DONE |
Christina Prado
|
|
|
extension request approved
|
Expiration Notice | 1/9/2015 | 1/30/2015 | 1/9/2015 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2015 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 8/6/2014 | | 1/7/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New 10th and Grove Condo's
|
Routing Off Site - STRUCTURAL | 12/18/2014 | | 1/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 12/18/2014 | | 1/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 12/18/2014 | 12/18/2014 | 12/24/2014 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLUMBING | 12/23/2014 | | 12/23/2014 | | PASS |
Bill VanDegrift
|
|
|
use plan dated 12/23/14
|
Routing - PLUMBING | 12/18/2014 | | 12/22/2014 | | FAIL |
Bill VanDegrift
|
|
|
please upload version 2 of P2.1
|
Routing - PLAN CHECK | 9/26/2014 | | 10/9/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
need sign off from failed department reviews
|
Routing Off Site - STRUCTURAL | 9/26/2014 | | 10/8/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 9/26/2014 | 9/26/2014 | 10/2/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 10-02-14
|
Routing - PLANNING Land Div | 10/1/2014 | | 10/1/2014 | | PASS |
Dave Abo
|
|
|
Approved as per e-mail from Mike Harrison, Boise City Canal Company, 10/1/14, foundation plans as submitted in e-review.
|
Routing - Design Review | 9/26/2014 | | 10/1/2014 | | PASS |
Josh Wilson
|
|
|
Recieved approval for encroachment from Boise Canal Company via email 10/1/14
|
Routing - PLUMBING | 9/26/2014 | | 9/30/2014 | | FAIL |
Bill VanDegrift
|
|
|
provide complete underground plumbing plans.
|
Routing Off Site - STRUCTURAL | 8/6/2014 | | 8/27/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see change marks in e plan
|
Routing - PLAN CHECK | 8/6/2014 | | 8/27/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 8/27/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 8/6/2014 | 8/6/2014 | 8/14/2014 | | FAIL |
|
|
|
See Fire Plan Review 08-14-14
|
Routing PW Drainage | 8/6/2014 | | 8/14/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 8/6/2014 | | 8/13/2014 | | FAIL |
Daryl Spivey
|
|
|
SDR 35 is not approved for iside a building use. Must use schedule 40 plastic or other approved material for inside building use.
|
Routing - Design Review | 8/6/2014 | | 8/11/2014 | | FAIL |
Josh Wilson
|
|
|
Resolve conflict with Boise Canal company and receive approval for placing building over piped canal or relocate building.
|
Route to Impact Fee Review | 8/6/2014 | 8/11/2014 | 8/6/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing PW Street Lights | 8/6/2014 | | 8/6/2014 | | PASS |
Mike D Hedge
|
|
|
Street lighting to be included on seperate building permit for main building.
|
Routing PW Sewer Design | 8/6/2014 | | 8/6/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Intake Approval | | | 8/6/2014 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING Land Div | 8/6/2014 | | 8/6/2014 | | FAIL |
Dave Abo
|
|
|
Existing 12 foot concrete culvert located on northeast corner of site owned by the Boise City Canal Company. Their Board will not allow construction over the culvert. It must be relocated prior to issuance of building permit.
|
Routing - Addressing | 8/6/2014 | | 8/6/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/6/2014 | | 8/6/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 8/6/2014 | | 8/6/2014 | | PASS |
Evan Jenkins
|
|
|
|
Application received | | | 7/29/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 29 2014 11:27AM
|
Pending Assignment by JCM | 8/6/2014 | | | | |
John Menard
|
|
|
|