Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-02161
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 541 W MESA GRANDE LN
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 1,945 sq. ft., two story (first story 1,319 sq. ft., second story 626 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 172 sq. ft. of covered patio/porch and a 840 sq. ft. attached garage per the approved plans, ResCheck, plan review report and any notations. R-1B zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/17/201412/18/201412/18/2014APASS
DetailsPhil Shearer
garage code 5296 Phone #: ###-#### Inspection requested via web by Stephanie Anthony
DOC - Permit Finaled12/18/201412/18/201412/18/2014PPASS
DetailsPhil Shearer
BLD-Blower Door Test Results12/18/201412/18/201412/18/2014PPASS
DetailsPhil Shearer
5.32
PubWorks Occupancy Approval12/18/201412/18/201412/18/2014 DONE
DetailsJason C. Taylor
NO HILLSIDE APPROVAL REQUIRED. Jason Taylor ###-####.
BLD-Final12/17/201412/17/201412/17/2014PNR
DetailsJim Sly
Justin phone ###-#### code 5296
BLD-Final12/16/201412/17/201412/17/2014ANR
DetailsJim Sly
garage code 5296 Phone #: ###-#### Inspection requested via web by Stephanie Anthony
Need Hillside.......
BLD-Final12/15/201412/15/201412/15/2014PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, needs hillside, temp glass, blower door test
BLD-Energy code compliance10/20/201410/21/201410/21/2014APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Stephanie Anthony
BLD-Framing/Rough-in10/15/201410/16/201410/16/2014PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, ok to insulate,, still a couple of corrections
BLD-Framing/Rough-in10/15/201410/16/201410/16/2014APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, pending on a couple correction issues,, ok to insulate
BLD-Framing/Rough-in10/14/201410/15/201410/15/2014PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, correction notice posted,, do not insulate
BLD-Wall cover10/7/201410/8/201410/9/2014PPART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Stephanie Anthony sheetrock soffite and light boxs ok to cover
BLD-Wall Bracing10/3/201410/6/201410/6/2014APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, exterior shear ok
BLD-Wall Bracing10/1/201410/2/201410/2/2014PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, not even close
BLD-Wall Bracing10/1/201410/2/201410/1/2014ACANC
DetailsTony Young
Phone #: ###-#### >> Inspection requested via web by Stephanie Anthony Inspection cancelled from web by: Stephanie Anthony
Plan Modification Accepted  10/1/2014 DONE
new manual j
Routing - MECHANICAL10/1/2014 10/1/2014 PASS
DetailsTroy James
resubmitted manual j report
BLD-Foundation8/29/20148/29/20148/29/2014PPART
DetailsTony Young
Pat Phone #: ###-####,, work in progress
BLD-Footing8/27/20148/28/20148/28/2014APASS
DetailsTony Young
Pat Phone #: ###-####
PubWorks Subgrade Approval8/28/20148/28/20148/28/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  8/25/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  8/18/2014  
Telephone call  8/18/2014 DONE
DetailsCandy A. Nichols
called Justion to let know permit is rady and how much is owed-left message with secretary
Inspection Record Card- Bld  8/18/2014 DONE
DetailsChristina Prado
Permit Ready to Issue  8/18/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (JG)7/30/20147/30/20148/16/2014 PASS
DetailsJavier Guzman
8/18 M L2 Hillside**
Routing - PLAN CHECK  8/16/2014 PASS
DetailsJavier Guzman
1st review completed  8/16/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  8/16/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/16/2014 DONE
Routing - Addressing7/31/2014 8/16/2014 PASS
DetailsJason C. Taylor
signed off in PW report by Jason Taylor 7/31/2014
Routing - Erosion and Sediment8/6/2014 8/7/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection Required Prior to Earth Disturbance
Routing - FIRE8/7/2014 8/7/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire Department Vehicle Access.
Routing - MECHANICAL8/1/2014 8/6/2014 PASS
DetailsTroy James
Route to Impact Fee Review7/29/20148/1/20148/1/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING8/1/2014 8/1/2014 PASS
DetailsSusan Riggs
CORRECTIONS REQUIRED AS INDICATED ON SITE PLAN.
Routing - PUBLIC WORKS7/31/2014 8/1/2014 PASS
DetailsJennifer Bruner
Application received 7/29/20147/31/2014 DONE
Routing PW Grading-Hillside7/31/2014 7/31/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plans ACCEPTED BY PLAN TECH  7/30/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/30/2014 DONE
DetailsTisha Gallop
Intake Approval  7/30/2014 PASS
DetailsTisha Gallop