BLD-Final | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Phil Shearer
|
|
|
garage code 5296 Phone #: ###-#### Inspection requested via web by Stephanie Anthony
|
DOC - Permit Finaled | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Blower Door Test Results | 12/18/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Phil Shearer
|
|
|
5.32
|
PubWorks Occupancy Approval | 12/18/2014 | 12/18/2014 | 12/18/2014 | | DONE |
Jason C. Taylor
|
|
|
NO HILLSIDE APPROVAL REQUIRED. Jason Taylor ###-####.
|
BLD-Final | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | NR |
Jim Sly
|
|
|
Justin phone ###-#### code 5296
|
BLD-Final | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | NR |
Jim Sly
|
|
|
garage code 5296 Phone #: ###-#### Inspection requested via web by Stephanie Anthony Need Hillside.......
|
BLD-Final | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, needs hillside, temp glass, blower door test
|
BLD-Energy code compliance | 10/20/2014 | 10/21/2014 | 10/21/2014 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony
|
BLD-Framing/Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, ok to insulate,, still a couple of corrections
|
BLD-Framing/Rough-in | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, pending on a couple correction issues,, ok to insulate
|
BLD-Framing/Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, correction notice posted,, do not insulate
|
BLD-Wall cover | 10/7/2014 | 10/8/2014 | 10/9/2014 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony sheetrock soffite and light boxs ok to cover
|
BLD-Wall Bracing | 10/3/2014 | 10/6/2014 | 10/6/2014 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, exterior shear ok
|
BLD-Wall Bracing | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Stephanie Anthony,, not even close
|
BLD-Wall Bracing | 10/1/2014 | 10/2/2014 | 10/1/2014 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stephanie Anthony Inspection cancelled from web by: Stephanie Anthony
|
Plan Modification Accepted | | | 10/1/2014 | | DONE |
|
|
|
new manual j
|
Routing - MECHANICAL | 10/1/2014 | | 10/1/2014 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Foundation | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, work in progress
|
BLD-Footing | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 8/28/2014 | 8/28/2014 | 8/28/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 8/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 8/18/2014 | | |
|
|
|
|
Telephone call | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
called Justion to let know permit is rady and how much is owed-left message with secretary
|
Inspection Record Card- Bld | | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (JG) | 7/30/2014 | 7/30/2014 | 8/16/2014 | | PASS |
Javier Guzman
|
|
|
8/18 M L2 Hillside**
|
Routing - PLAN CHECK | | | 8/16/2014 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 8/16/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 8/16/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2014 | | DONE |
|
|
|
|
Routing - Addressing | 7/31/2014 | | 8/16/2014 | | PASS |
Jason C. Taylor
|
|
|
signed off in PW report by Jason Taylor 7/31/2014
|
Routing - Erosion and Sediment | 8/6/2014 | | 8/7/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection Required Prior to Earth Disturbance
|
Routing - FIRE | 8/7/2014 | | 8/7/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department Vehicle Access.
|
Routing - MECHANICAL | 8/1/2014 | | 8/6/2014 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/29/2014 | 8/1/2014 | 8/1/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 8/1/2014 | | 8/1/2014 | | PASS |
Susan Riggs
|
|
|
CORRECTIONS REQUIRED AS INDICATED ON SITE PLAN.
|
Routing - PUBLIC WORKS | 7/31/2014 | | 8/1/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Application received | | 7/29/2014 | 7/31/2014 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 7/31/2014 | | 7/31/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 7/30/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/30/2014 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 7/30/2014 | | PASS |
Tisha Gallop
|
|
|
|