Permit Information
Permit NumberBLD14-02175
StatusFinaled
Name MJT CONSTRUCTION INC
Site Address 3614 W STATE
Project NameALBERTSONS FOOD STORE #0189
Customer Number 
ePlanReviewNo
Description
ALBERTSONS FOOD STORE #0189-Relocate pharmcy to new location within store.selective wall demolition and reconstion. PLAN MODIFICATION 9-25-14 – Modification submitted to add windows to the North side of the existing building with attached engineering. Windows must comply with minimum U-factor of 0.55 and an SHGC of 0.40.**TLW** Light fixture and plumbing reconfiurgation. Fire spk permit to be reviewed for permit by fire planreview. Ref relocation as well as hand sink relocation. health dept required for sign off. review atched to plans.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice3/11/20163/11/20163/14/2016 DONE
DetailsTony Young
This permit finaled on the web by Michele Rodgers
BLD-Aging Inspection3/11/20163/11/20163/11/2016 DONE
DetailsTony Young
BLD-Aging Inspection3/10/20163/10/20163/11/2016 DONE
DetailsTony Young
DOC - Permit Finaled3/11/20163/11/20163/11/2016PPASS
DetailsTony Young
BLD-Final10/27/201510/28/201510/28/2015APASS
DetailsTony Young
Call half hour before // Chuck Phone #: ###-####
BLD-Final10/20/201510/21/201510/21/2015ANR
DetailsTony Young
We would like to schedule our final. We have obtained fire final. Phone #: ###-#### Inspection requested via web by Michele Rodgers,, need sprinklers and f/l/s 1st
BLD-Conference10/19/201510/20/201510/20/2015ANR
DetailsTony Young
We would like to schedule our final. We have obtained fire final. Phone #: ###-#### Inspection requested via web by Michele Rodgers,, still need sprinklers and life safety finals
FIRE-Final Inspection10/27/201410/28/201410/28/2014AFAIL
DetailsTroy Cobbley
Need the project related fire sprinkler permit addressed. Also need a fire alarm permit for the required modifications due to new wall and ceiling arrangements. All other life safety items appeared ok.
BLD-Framing/Rough-in10/9/201410/9/201410/9/2014ADONE
DetailsTony Young
Mike-please call 20 minutes prior to meet-inspection was scheduled for yesterday but was not done
BLD-Framing/Rough-in10/8/201410/8/201410/9/2014PPART
DetailsTony Young
Mike-###-####,, windows
(F) Reprint permit  9/29/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  9/29/2014 DONE
DetailsTisha Gallop
Permit Ready to Issue  9/29/2014 DONE
CHANGE STATUS TO (ISS)  9/29/2014 DONE
DetailsTisha Gallop
Routing - PLANNING9/25/2014 9/26/2014 PASS
DetailsJosh Wilson
Routing - PLAN CHECK9/26/2014 9/26/2014 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/26/2014 DONE
Case Summary (BLD)  9/26/2014 DONE
Plan assigned to (TLW)9/15/2014 9/26/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK9/15/2014 9/18/2014 PASS
DetailsTim L. Woodard
Approved pending DR approval. Approval for Plan Mod did not review the rest of the tenant space, rather the plan mod review was only for the Plan Mod scope of work. TLW
Routing - PLANNING9/18/2014 9/18/2014 FAIL
DetailsTim L. Woodard
DRH14-00348 not approved. Waiting for approval. Prior to Routeing to Josh Wilson for review. TLW
Plan Modification Accepted  9/15/2014 DONE
DetailsChristina Prado
Received plan mod to add glass block replacement and new window opening to the north exterior wall to the permit. Three sets of sheets marked G0.01, A2.01, A3.01 & S1.01 submitted as well as new structural calcs. Plans taken to Tim for review
BLD-Ceiling Grid Inspection9/10/20149/11/20149/11/2014APASS
DetailsDave Hannah
Mike Phone #: ###-####
BLD-Ceiling Grid Inspection9/9/20149/10/20149/10/2014AFAIL
DetailsDave Hannah
Mike Phone #: ###-#### needs to clip or spreader bars on perm
BLD-Framing/Rough-in8/22/20148/25/20148/25/2014APASS
DetailsJim Storey
Mike Phone #: ###-####
Telephone call  8/25/2014 DONE
called mech masters to come and pick up approved mechanical plan. Plans at receptionist counter.
Routing - MECHANICAL8/19/2014 8/25/2014 PASS
DetailsTroy James
Additional plans submitted  8/19/2014 DONE
DetailsTisha Gallop
received deferred submittal for mechanical eng; two copies of plan sheet M-1.0.; routed to mech.
Issue PAID IN FULL permit  8/6/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  8/5/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  8/5/2014  
DetailsBarbara Stitt
Telephone call  8/5/2014 DONE
DetailsBarbara Stitt
Called Will Christensen and told him that permit is ready, fees due and that we will need GC info before issued on 8-5-14 @ 3:25pm
Plan assigned to (301)8/4/20148/4/20148/4/2014 DONE
DetailsJim Storey
Plan assigned to (301)7/30/20147/30/20148/4/2014 PASS
DetailsJim Storey
Routing - PLAN CHECK7/30/2014 8/4/2014 PASS
DetailsJim Storey
Approved by 301 on 8-4-14 orginally.
1st review completed  8/4/2014 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/4/2014 DONE
Application received 7/30/20147/30/2014 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  7/30/2014 DONE
DetailsBarbara Stitt
Intake Approval  7/30/2014 PASS
DetailsJim Storey