BLD-Final | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
DOC - Permit Finaled | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PASS |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 6/5/2015 | 6/5/2015 | 6/5/2015 | | DONE |
Jason C. Taylor
|
|
|
Bond in place for drainage issues, OK for occupancy. Jason Taylor ###-####
|
BLD-Final | 6/2/2015 | 6/2/2015 | 6/3/2015 | P | NR |
Jim Storey
|
|
|
would like call ahead; Mark Phone #: ###-#### address # and handrails
|
BLD-Wall Bracing | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | NR |
Jim Storey
|
|
|
shear // Mark Phone #: ###-####
|
BLD-Framing/Rough-in | 1/20/2015 | 1/21/2015 | 1/21/2015 | P | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
BLD-Energy code compliance | 1/21/2015 | 1/21/2015 | 1/21/2015 | P | PASS |
Jim Storey
|
|
|
Mark Phone #: ###-####
|
BLD-Energy code compliance | 1/15/2015 | 1/20/2015 | 1/20/2015 | A | NR |
Jim Storey
|
|
|
Joe Phone #: ###-####
|
BLD-Energy code compliance | 1/13/2015 | 1/14/2015 | 1/15/2015 | P | NR |
Jim Storey
|
|
|
Joe Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | PART |
Jim Storey
|
|
|
Joe Phone #: ###-#### c/n a1 thru a8 need support/ stem wall need insulation / ok to cover exterior and insulation.
|
BLD-Framing/Rough-in | 1/7/2015 | 1/8/2015 | 1/8/2015 | A | NR |
Phil Shearer
|
|
|
Joe Phone #: ###-#### No plans onsite
|
BLD-Other | 11/3/2014 | 11/3/2014 | 11/3/2014 | P | DONE |
Mike Jordan
|
|
|
sub floor// Joe Phone #: ###-####
|
BLD-Foundation | 10/2/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Jim Storey
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 9/30/2014 | 9/30/2014 | 9/30/2014 | P | PASS |
Mike Jordan
|
|
|
Mana Phone #: ###-####. exterior permiter footings only.
|
PubWorks Subgrade Approval | 9/26/2014 | 9/26/2014 | 9/26/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 9/17/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 9/15/2014 | | |
|
|
|
|
Telephone call | | | 9/15/2014 | | DONE |
Tisha Gallop
|
|
|
called Roth Homes and told recep permit is ready and fee due.
|
Inspection Record Card- Bld | | | 9/15/2014 | | DONE |
Christina Prado
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 9/8/2014 | | 9/15/2014 | | PASS |
Perry Paine
|
|
|
|
Routing - PLAN CHECK | | | 9/15/2014 | | PASS |
Perry Paine
|
|
|
|
Routing - MECHANICAL | 9/11/2014 | | 9/11/2014 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/9/2014 | | DONE |
Candy A. Nichols
|
|
|
recieved 3 sets of foundation calcs and 3 sheets of S-2-Javier came out and talked to customer-took to perry
|
Plan assigned to (PEP) | 9/4/2014 | | 9/9/2014 | | DONE |
Perry Paine
|
|
|
BUILDING PLAN REVIEW APPROVED. STILL NEED ACCA APPROVAL.
|
Routing - FIRE | 9/5/2014 | | 9/8/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been reviewed for Fire Department Vehicle access.
|
Routing - Erosion and Sediment | 9/5/2014 | | 9/5/2014 | | PASS |
Evan Jenkins
|
|
|
Site Prep Inspection and Approval Required Prior to any Earth Disturbance
|
Routing - MECHANICAL | 9/5/2014 | | 9/5/2014 | | FAIL |
Troy James
|
|
|
emailed correction to Idaho hvac and joe roth
|
Routing - PLANNING | 9/4/2014 | | 9/5/2014 | | PASS |
Sue Cummings
|
|
|
Category I Hillside. No P&Z Hillside Applciation Required.
|
Routing - Addressing | | | 9/4/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 9/4/2014 | | 9/4/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Plan resubmittals received | | | 9/4/2014 | | DONE |
Tisha Gallop
|
|
|
received three copies of C1, two copies of S-2 and three copies of Geotech report; put with plans and routed to PW grading.
|
Routing PW Grading-Hillside | 9/4/2014 | | 9/4/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan assigned to (JG) | | | 8/22/2014 | | DEFR |
Perry Paine
|
|
|
waiting on hillside 8/18 M L2 Hillside*
|
Telephone call | | | 8/18/2014 | | DONE |
Barbara Stitt
|
|
|
Called Joe Roth and told him that we need a Geo tech report and grading & drainage plan for the Hillside before these plans can move on
|
Routing PW Grading-Hillside | 7/31/2014 | | 8/5/2014 | | FAIL |
Jason C. Taylor
|
|
|
Applciation needs to be hillside 404, need geotech report, need site civil grading plan. Possible P&Z hillside applciation. JCT
|
1st review completed | | | 8/5/2014 | | DONE |
Jason Blais
|
|
|
Is hillside. Needs to work through that process first.
|
Route to Impact Fee Review | 7/31/2014 | 8/5/2014 | 8/1/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 7/31/2014 | 8/3/2014 | 8/1/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Application received | | 7/31/2014 | 7/31/2014 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/31/2014 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 7/31/2014 | | FAIL |
Barbara Stitt
|
|
|
Needs hillside application, geotechnical report and grading and drainage report
|
Recd Pcfee & Taken To Pln CK | | | 7/31/2014 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 7/31/2014 | | |
Barbara Stitt
|
|
|
|