Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-02179
StatusIssued
Name PINNACLE BUILDERS INCORPORATED
Site Address 1604 W BANNOCK ST
Project NameBudda Condo Carport
Customer Number 
ePlanReviewYes
Description
To construct 1 (1214) sq.ft., Five stall, free standing carport at the above address. This carport will be constructed with steel columns, glullam beams, metal joists, and galv. metal roofing. The carport complies with 406.3 of the 2012 IBC. All construction shall be per the approved plans and attached engineered drawings. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval7/8/20157/8/20157/8/2015 DONE
DetailsTiffany Lowery
BLD-Framing/Rough-in5/1/20155/1/20155/1/2015PPASS
DetailsPhil Shearer
Travis Phone #: ###-####
BLD-Foundation4/6/20154/7/20154/7/2015APART
DetailsTony Young
Ryan Phone #: ###-####,, work in progress
BLD-Footing4/3/20154/6/20154/6/2015APART
DetailsTony Young
Ryan Phone #: ###-####,, work in progress
OVERRIDE  1/27/2015  
Issue PAID IN FULL permit  1/27/2015 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  1/27/2015 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  1/27/2015 DONE
Expiration Notice1/9/20151/30/20151/9/2015 DONE
DetailsChristina Prado
Plan assigned to (SRZ)9/27/2014 11/5/2014 PASS
DetailsSam Zahorka
1st review completed. New Carports ePlanReview
Routing - PLAN CHECK11/5/2014 11/5/2014 PASS
DetailsSam Zahorka
Routing Off Site - STRUCTURAL11/5/2014 11/5/2014 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  11/5/2014 DONE
DetailsSam Zahorka
Routing PW Drainage10/29/2014 10/31/2014 PASS
DetailsBrian Murphy
1st review completed  10/23/2014 DONE
DetailsSam Zahorka
Routing - FIRE9/27/2014 10/23/2014 PASS
DetailsCraig D. Hanson
No report needed project meets fire flow and is within hydrant distance.CDH
Routing Off Site - STRUCTURAL9/27/2014 10/23/2014 FAIL
DetailsSam Zahorka
Routing - PLAN CHECK9/27/2014 10/22/2014 FAIL
DetailsSam Zahorka
Routing PW Drainage9/29/2014 10/7/2014 FAIL
DetailsBrian Murphy
needs seperate reports for geo tech drainage and o and m needs lxw for paver on drainage sheet depth on drain rock free draining note.
Routing - Design Review9/27/2014 9/30/2014 PASS
DetailsJosh Wilson
Route to Impact Fee Review9/27/20149/30/20149/29/2014 PASS
DetailsCindy M. Gould
Routing - PLANNING Land Div9/29/2014 9/29/2014 PASS
DetailsDave Abo
Buddha Condominiums
Routing - PUBLIC WORKS9/27/2014 9/29/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment9/27/2014 9/29/2014 PASS
DetailsEvan Jenkins
1,500sq ft 5 car port structure.
Site Prep Inspection Required Prior to Earth Disturbance, due to Env. Sensative
Pending Assignment by JCM9/27/2014 9/27/2014 DONE
DetailsJohn Menard
Intake Approval  9/24/2014 FAIL
DetailsAdele J Schaffeld-Griffin
You separated the checklist into 3 documents. Please see change marks on all 3 sheets for items that are missing or additional information needed.

9/24/14 Not all of change marks from the original pre screen were addresses. Please see change marks on check lists and upload all of the required documents and re upload the documents correctly.
Intake Approval  8/18/2014 FAIL
DetailsAdele J Schaffeld-Griffin
You separated the checklist into 3 documents. Please see change marks on all 3 sheets for items that are missing or additional information needed.
Application received  7/31/2014 DONE
Application submitted via PDS Online on Jul 31 2014 10:28AM