BLD-Final | 2/3/2015 | 2/4/2015 | 2/4/2015 | A | PASS |
Dave Hannah
|
|
|
Megan Phone #: ###-####
|
DOC - Permit Finaled | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | PASS |
Phil Shearer
|
|
|
Eric Phone #: ###-####
|
OVERRIDE | | | 12/16/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/16/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/16/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/16/2014 | | DONE |
Candy A. Nichols
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2014 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 11/25/2014 | | 12/2/2014 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 11/25/2014 | | 12/2/2014 | | PASS |
John Menard
|
|
|
per approved plans and calculations. JCM
|
Routing - PLANNING | 11/25/2014 | | 12/2/2014 | | PASS |
David Moser
|
|
|
|
Routing - FIRE | 11/25/2014 | | 12/1/2014 | | PASS |
Craig D. Hanson
|
|
|
No report
|
Routing - Erosion and Sediment | 11/25/2014 | | 11/25/2014 | | PASS |
Evan Jenkins
|
|
|
Construction of 40-foot free-standing radio tower next to the City of Boise Communications Division Shop/Office. ESC Waiver Request approved due to nature of project, and project not in Env. Sensative Area
|
Routing - PLANNING Land Div | 11/25/2014 | | 11/25/2014 | | PASS |
Dave Abo
|
|
|
|
Intake Approval | | | 11/25/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 11/25/2014 | | 11/25/2014 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 11/21/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
11-21-14 Each individual sheet for the drawings and structural drawings is required to be stamped by a licensed engineer. Drawing sheets are different than structural calculation packages.
|
Intake Approval | | | 8/1/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please refer to the required submittal standards.
Each sheet shall be uploaded individually.
Each sheet shall be at least 18X24.
Each sheet shall meet the conventional naming standards.
Each sheet shall have the required stamping area.
Each sheet shall have an Idaho Licensed Engineer Stamp.
Structural calculations with the Idaho Licensed Engineer Stamp shall be submitted.
Please complete the check list and upload the check list with all of the additional items required from the check list.
|
Application received | | | 7/31/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2014 11:06AM
|
First Notice | 2/4/2015 | 2/4/2015 | | | |
Dave Hannah
|
|
|
|