Telephone call | | | 12/22/2015 | | DONE |
|
|
|
Spoke with Marlene. She said she would have to call back about the ELE, PLM and MEC because she did not work with the company yet when this project was done. No Permits were found.
|
Second Notice | | 11/19/2015 | 12/10/2015 | | DONE |
|
|
|
Mailed 12-11-15
|
First Notice | | 10/18/2015 | 11/9/2015 | | DONE |
|
|
|
Mailed 11-10-15
|
BLD-Final | 10/8/2015 | 10/8/2015 | 10/8/2015 | P | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
Permanent Occupancy | | | 10/8/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/7/2014 | 11/7/2014 | 11/7/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. Previous correction items finished. Missing interior doors to be installed and verified prior to structural final approval. Door hardware at the SW exit door to be replaced.
|
FIRE-Final Inspection | 11/6/2014 | 11/6/2014 | 11/6/2014 | P | NR |
Forrest France
|
|
|
Final pending project related fire alarm permit work, need to post building address numbers, repair one exit sign, install missing escutcheon, signs at PFE are not required, some doors and hardware are not yet installed, noted manual thumbturns on sliding doors to lease spaces.
|
FIRE-Conference | 11/5/2014 | 11/5/2014 | 11/5/2014 | P | DONE |
Forrest France
|
|
|
Regarding fire extinguisher placement, fire life safety inspection items.
|
FIRE-Conference | 10/20/2014 | 10/20/2014 | 10/20/2014 | P | DONE |
Forrest France
|
|
|
Regarding occupant notification at the restrooms, fire sprinkler coverage in the existing mechanical room.
|
Issue PAID IN FULL permit | | | 10/1/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Print Occupancy Form | | | 10/1/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 9/24/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 9/24/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CJW) | 8/4/2014 | 8/4/2014 | 9/16/2014 | | PASS |
Carl Westfall
|
|
|
SOLA SALON STUDIOS - Level 3 TI - ePlanReview (15 days - Aug. 22) (1st review done)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/12/2014 | | 9/16/2014 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
Routing - MECHANICAL | 9/12/2014 | | 9/15/2014 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 9/12/2014 | | 9/12/2014 | | PASS |
Josh Wilson
|
|
|
|
Plan resubmittals received | | | 9/12/2014 | | DONE |
|
|
|
|
Routing PW Sewer Rating | 8/5/2014 | | 8/18/2014 | | PASS |
Beverly Mountain
|
|
|
|
Plan resubmittals requested | | | 8/18/2014 | | DONE |
|
|
|
|
1st review completed | | | 8/18/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/4/2014 | | 8/18/2014 | | PASS |
Carl Westfall
|
|
|
Drawings approved with "red lines".
|
Routing - FIRE | 8/4/2014 | 8/4/2014 | 8/12/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 08-12-14
|
Routing - Design Review | 8/4/2014 | | 8/12/2014 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 8/4/2014 | | 8/11/2014 | | FAIL |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/4/2014 | | 8/5/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing - PLUMBING | 8/4/2014 | | 8/5/2014 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 8/4/2014 | | 8/5/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/4/2014 | | 8/5/2014 | | PASS |
Beverly Mountain
|
|
|
|
Intake Approval | | | 8/4/2014 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Adele Schaffeld-Griffin and plan review fees paid.
|
Pending Assignment by JCB | 8/4/2014 | | 8/4/2014 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 8/1/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
An ESC waiver letter is required for any interior saw cutting of concrete over 60 feet. I will email you a copy of an example letter.
|
Application received | | | 7/31/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 31 2014 11:38AM
|
Intake Approval | | | 7/31/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Before the pre screen can begin please complete and upload the 518 check list and all of the additional documents required by the check list.
|