Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-02197
StatusFinaled
Name HORNET CONSTRUCTION
Site Address 2618 W GEM ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the relocation (house move) of an existing 920s.f. 1-story single family dwelling from 1023 S. Denver (MIS14-00173) to 2618 Gem St. C-2D ok per Colleen Carroll. All electrical plumbing and mechanical for the dwelling must be approved by the inspection division of same. There is to be a minimum of R-38 insulation in the attic area and R-30 in the floor. If floor is framed of 2 X 6's R-19 is ok in the floor. All tempered glazing is to be as required; Egress windows must comply with current 2009 IRC and IECC. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsPhil Shearer
BLD-Final12/4/201412/8/201412/8/2014PPASS
DetailsPhil Shearer
Chris Phone #: ###-####
DOC - Permit Finaled12/8/201412/8/201412/8/2014PPASS
DetailsPhil Shearer
BLD-Foundation8/18/20148/19/20148/19/2014PPASS
DetailsPhil Shearer
Chuck---mud coming at 2:30 Phone #: ###-####
BLD-Footing8/14/20148/18/20148/18/2014APASS
DetailsPhil Shearer
chuck Phone #: ###-####
Issue PAID IN FULL permit  8/14/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  8/12/2014  
Application received 8/4/20148/12/2014 DONE
Routing - PLAN CHECK  8/12/2014 PASS
DetailsPerry Paine
Telephone call  8/12/2014 DONE
DetailsTisha Gallop
called Chris Sabala and told him permit is ready and fee due.
Inspection Record Card- Bld  8/12/2014 DONE
DetailsTisha Gallop
Permit Ready to Issue  8/12/2014 DONE
DetailsTisha Gallop
Routing Walk-In (BLD)8/11/20148/11/20148/11/2014PDONE
DetailsPerry Paine
Plan assigned to (PEP) 8/4/20148/11/2014 PASS
DetailsPerry Paine
1st review completed  8/11/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/11/2014 DONE
Routing - PUBLIC WORKS8/5/2014 8/5/2014 PASS
DetailsJennifer Bruner
BLD-Other8/4/20148/4/20148/4/2014PPART
DetailsBob Archibald
Ok to relocate dwelling from Denverlocation to this site tuesday evening 8/5/14 while building permit is pending issuance.
Override - Parcel Holds  8/4/2014  
Routing - PLANNING8/4/2014 8/4/2014 PASS
DetailsLeon Letson
Plan has been redlined to reflect required setbacks of the C-2D zone.
Routing - Addressing8/4/2014 8/4/2014 PASS
DetailsJason C. Taylor
Plans ACCEPTED BY PLAN TECH  8/4/2014 DONE
DetailsChristina Prado
Override - Parcel Holds  8/4/2014  
Recd Pcfee & Taken To Pln CK  8/4/2014 DONE
DetailsChristina Prado