Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-02240
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 5311 W IRVING ST
Project NameSimplot Plant Sciences GH
Customer Number 
ePlanReviewYes
Description
(SIMPLOT PLANT SCIENCES – New Greenhouse / Head of House) Permit to construct a new 2,064 square foot green house and head of house building. Building will be two 543 square foot prefabricated steel greenhouse structures attached to a center 978 square foot CMU head of house structure. Work to include: construction of a new foundation structure, construction of CMU exterior walls, erection of prefabricated metal greenhouses, new roof system, new electrical / lighting, new mechanical, construct new interior non-bearing walls, installation of new accessible doors / hardware, new plumbing, and interior finishes. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval8/20/20158/20/20158/20/2015 DONE
DetailsTiffany Lowery
Permanent Occupancy  8/19/2015 DONE
DetailsChristina Prado
BLD-Final8/18/20158/18/20158/18/2015PPASS
DetailsJim Sly
Colin Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection8/17/20158/18/20158/18/2015APASS
DetailsTroy Cobbley
Life safety passed. There appears to be an issue with address. The computer and small documents say 5311 but the approved plans say 5317. Colyn is following up with the architect
FIRE-Final Inspection8/17/20158/17/20158/17/2015PFAIL
DetailsTroy Cobbley
No city approved plans. I noted that the thumbturn dead bolts will need to be removed from the two interior doors.
Zoning Approval8/14/20158/14/20158/14/2015 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in2/24/20152/24/20152/24/2015PPASS
DetailsJim Sly
Colyn Phone #: ###-####
Pending MTI special inspections, tests and approvals.
BLD-Conference2/23/20152/24/20152/24/2015APEND
DetailsJim Sly
BLD-Framing/Rough-in12/17/201412/17/201412/17/2014PPART
DetailsJim Sly
Colyn Phone #: ###-####
Should have been Foundation wall. Wall OK pending MTI special insp, tests and approvals.
BLD-Footing12/9/201412/10/201412/10/2014PPASS
DetailsJim Sly
Colyn Phone #: ###-####
OK Pend MTI Special insp, tests and approvals.
CHANGE STATUS TO (ISS)  12/9/2014 DONE
OVERRIDE  11/14/2014  
Print Occupancy Form  11/14/2014 DONE
DetailsCandy A. Nichols
(F) Reprint permit  11/14/2014 DONE
DetailsCandy A. Nichols
Permit Ready to Issue  11/14/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  11/13/2014  
Permit Ready to Issue  11/13/2014 DONE
Plan assigned to (TLW)10/21/2014 11/7/2014 PASS
DetailsTim L. Woodard
New Simplot Research Green House
Routing PW Drainage10/28/2014 11/7/2014 PASS
DetailsBrian Murphy
PLANS/APPL TAKEN TO FRONT DESK  11/7/2014 DONE
Routing - PLAN CHECK10/28/2014 11/6/2014 PASS
DetailsTim L. Woodard
Approved with attached "modification letter". TLW
Plan resubmittals received  10/28/2014 DONE
DetailsTim L. Woodard
Recieved in E-Plan and Routed. TLW
Route to Impact Fee Review10/23/201410/26/201410/24/2014 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK10/21/2014 10/23/2014 FAIL
DetailsTim L. Woodard
Refer to changemarks in E-Plan Review. TLW
1st review completed  10/23/2014 DONE
DetailsTim L. Woodard
Pending Assignment by JCM9/29/2014 10/21/2014 DONE
DetailsJohn Menard
Plan assigned to (AJS)9/29/2014 10/21/2014 DEFR
DetailsAdele J Schaffeld-Griffin
New Simplot Building
Routing - PLAN CHECK9/29/2014 10/21/2014 PEND
DetailsAdele J Schaffeld-Griffin
Rerouted plans to Tim W. TLW
Routing Off Site - STRUCTURAL9/29/2014 10/14/2014 PASS
DetailsAdele J Schaffeld-Griffin
approved in e plan
Routing PW Solid Waste9/30/2014 10/10/2014 PASS
DetailsPeter J. McCullough
Routing PW Drainage9/30/2014 10/9/2014 FAIL
DetailsBrian Murphy
need calcs drainage report,o and m,geotech
Routing - FIRE9/29/20149/29/201410/3/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review 10-03-14
Routing - PLUMBING9/29/2014 10/3/2014 PASS
DetailsDaryl Spivey
premise protection to be changed to an R.P. and all water piping in building to be labeled per ISPC
Routing PW Street Lights9/30/2014 10/1/2014 PASS
DetailsMike D Hedge
No stree lighting required.
Routing PW Environmental9/30/2014 10/1/2014 PASS
DetailsRick Christenson
Routing PW Sewer Rating9/30/2014 9/30/2014 PASS
DetailsBeverly Mountain
Routing - PUBLIC WORKS9/29/2014 9/30/2014 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment9/29/2014 9/30/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection Required Prior to Earth Disturbance
Routing - Design Review9/29/2014 9/30/2014 PASS
DetailsJosh Wilson
Routing - PLANNING Land Div9/29/2014 9/29/2014 PASS
DetailsDave Abo
Parcel is over 5 acres in size. (10+ acres)
Routing - Addressing9/29/2014 9/29/2014 PASS
DetailsEmily Dixon
Intake Approval  9/29/2014 PASS
DetailsJohn Menard
Intake Approval  8/7/2014 FAIL
DetailsJohn Menard
Please submit the structural plans and calculations for the proposed pre-engineered greenhouse portion of this project.
Also, please submit the information on the greenhouse finish materials.
Application received  8/6/2014 DONE
Application submitted via PDS Online on Aug 6 2014 4:26PM
First Notice 8/29/2015