BLD-Final | 10/3/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Dave Hannah
|
|
|
covertech Phone #: ###-####
|
DOC - Permit Finaled | 10/3/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Subgrade Approval | 9/22/2014 | 9/22/2014 | 9/22/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/17/2014 | 9/18/2014 | 9/19/2014 | P | PART |
Dave Hannah
|
|
|
Jimmy will be doing the installation. His cell number is ###-####. We will be getting a footing subgrade inspection at 2:00 P.M. with Emily from MTI if you want to be there when she is. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch ok after geo tec signoff
|
Routing Walk-In (Zoning) | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | DONE |
Christina Prado
|
|
|
|
Routing Walk-In (BLD) | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 9/4/2014 | 9/4/2014 | 9/4/2014 | | PASS |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 9/4/2014 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/4/2014 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/4/2014 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 8/7/2014 | 8/7/2014 | 8/7/2014 | A | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 8/7/2014 | 8/7/2014 | 8/7/2014 | A | FAIL |
Perry Paine
|
|
|
engineering required?
|
1st review completed | | | 8/7/2014 | | DONE |
Perry Paine
|
|
|
|
Application received | | 8/7/2014 | | | |
|
|
|
|