Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-02264
StatusFinaled
Name ESI
Site Address 110 E MYRTLE ST
Project NameWinco Store No. 1
Customer Number 
ePlanReviewYes
Description
(WINCO GROCERY STORE REMODEL) The fire sprinkler system is used for unlimited area of the building. To remodel a 7,542 square area located within an existing 89,290 square foot grocery store. The remodel area is located at the front of the store. This is a scope of work permit. This whole building tenant already has a Certificate of Occupancy. Work includes interior nonbearing walls, new plastic skylights with prefabricated metal curbs, walk-in coolers, a pizza oven, a Type I hood, a grease duct with duct wrap, interior finishes, suspended acoustical ceilings, and exterior paint. The customer service area and miscellaneous equipment will be relocated and a new pre-fabricated customer service counter will be installed. A new pizza preparation and sales area will be created. A new fresh beer (growler) sales and storage area will also be created. A new eating area with a stand-up counter and a counter accessible to the disabled will be provided next to the growler sales area. A total of 15 new check-out stands will be installed with at least 3 being accessible to the disabled. A new “high” and a new “low” drinking fountain will be installed. Some of the concrete floor will be saw cut and removed to accommodate new under slab plumbing. Saw cut areas will be patched back with concrete. Special inspection is required for welding new steel channels to the roof deck. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13, including fire sprinklering the coolers, as regulated by the Fire Department. Throughout the project duration, provisions shall be made to protect the public and to maintain the egress system. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  9/18/2015 DONE
Print Statement  7/6/2015 DONE
Telephone call  7/6/2015 DONE
Spoke with Dan and informed him that his Electrical and Plumbing contractors need to have a separate permits for this permit and BLD15-02838
First Notice5/12/20155/12/20156/10/2015 DONE
DetailsDave Hannah
Mailed out 6-10-15
BLD-Final5/11/20155/12/20155/12/2015APASS
DetailsDave Hannah
This is Phase 1 of the project which is the Pizza/Growler Area. Phone #: ###-#### Inspection requested via web by Mike Tsu
DOC - Permit Finaled5/12/20155/12/20155/12/2015PPASS
DetailsDave Hannah
FIRE-Final Inspection5/8/20155/11/20155/11/2015APASS
DetailsKatie Marron
Fire life safety pass.
FIRE-Final Inspection5/6/20155/7/20155/7/2015ANR
DetailsKatie Marron
FIR14-00743 and FIR14-00711 permits need to be finaled before life safety can be completed.
FIRE-Conference11/14/201411/14/201411/14/2014ADONE
DetailsForrest France
On site discussion with contractor regarding project related fire sprinkler, alarm and hood suppression permit work. Life safety items and scope of remodel.
BLD-Ceiling Grid Inspection11/12/201411/13/201411/13/2014ADONE
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Ceiling Grid Inspection11/12/201411/13/201411/13/2014APASS
DetailsDave Hannah
Chris Phone #: ###-####
BLD-Framing/Rough-in11/5/201411/6/201411/6/2014APASS
DetailsDave Hannah
Chris Phone #: ###-####
OVERRIDE  9/16/2014  
Issue PAID IN FULL permit  9/16/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  9/16/2014 DONE
DetailsTisha Gallop
Permit Ready to Issue  9/16/2014 DONE
DetailsTisha Gallop
Plan assigned to (CJW)8/14/20148/14/20148/29/2014 PASS
DetailsCarl Westfall
WINCO GROCERY STORE - Level 3 TI - ePlanReview (15 days - Sept 2) (1st review done)
Routing - PLAN CHECK8/28/2014 8/29/2014 DONE
DetailsCarl Westfall
Started routing

Routing complete
PLANS/APPL TAKEN TO FRONT DESK  8/29/2014 DONE
Route to Impact Fee Review8/27/20148/30/20148/28/2014 PASS
DetailsDonna Wolf
No Impact Fees assessed - remodel of existing building with no additional sq ft. Exemption requested.
Plan resubmittals received  8/28/2014 DONE
Routing - Erosion and Sediment8/28/2014 8/28/2014 PASS
DetailsEvan Jenkins
Waiver Request Submittle is Approved
Routing - MECHANICAL8/27/2014 8/27/2014 PASS
DetailsTroy James
The pizza oven will be electric.
Routing - PLAN CHECK8/25/2014 8/27/2014 PASS
DetailsCarl Westfall
Drawings approved with "red lines".
1st review completed  8/27/2014 DONE
Routing Off Site - C.D.H8/14/2014 8/26/2014 PASS
DetailsByron Grover
Routing PW Environmental8/14/2014 8/25/2014 PASS
DetailsRick Christenson
Routing - PLAN CHECK8/14/2014 8/25/2014 FAIL
DetailsCarl Westfall
Additional information required
Routing - FIRE8/14/2014 8/21/2014 PASS
DetailsScott Arellano
Attached comments to plans.
Routing - MECHANICAL8/14/2014 8/19/2014 FAIL
DetailsTroy James
gas piping design for the pizza oven
Routing - PLUMBING8/14/2014 8/18/2014 PASS
DetailsBill VanDegrift
additional cross connection protection may be required
Routing - Design Review8/14/2014 8/18/2014 PASS
DetailsJosh Wilson
Josh Wilson - CZC14-00237
Routing - Erosion and Sediment8/14/2014 8/15/2014 FAIL
DetailsEvan Jenkins
Some sawcutting of parking lot
Due to Sawcutting, ESC Permit and ESC Plan w/ Narrative or ESC Waiver Letter Required
Pending Assignment by JCB8/14/2014 8/14/2014 DONE
DetailsJason Blais
Routing PW Sewer Rating8/14/2014 8/14/2014 PASS
DetailsBeverly Mountain
Routing - Addressing8/14/2014 8/14/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/14/2014 8/14/2014 PASS
DetailsBeverly Mountain
Intake Approval  8/13/2014 PASS
DetailsJason Blais
Prescreen approved by Tim Woodard. Plan Review Fees paid.
Application received  8/7/2014 DONE
Application submitted via PDS Online on Aug 7 2014 1:37PM