Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD14-02319
StatusFinaled
Name ROELL DONALD C
Site Address 2123 W SUNRISE RIM RD
Project Name 
Customer Number 
ePlanReviewNo
Description
### 8-18-2014 PROJECT MODIFIED TO REFLECT AN ADDITION OF 144S.F. TO THE NEW GARAGE. ADDED VALUE $6,672.00. value changes from under 400 @ $13s.f. to over 400s.f @ $23.00 s.f. see comments. pep 8-19-2014 ###***8-15-2014 THIS PROJECT IS MODIFIED TO REFLECT THE CONSTRUCTION OF A 320 s.f. GAZEBO WITH R-1C SETBACKS AND ENGINEERING CALCULATIONS. ADDED VALUE 320s.f. @ $23. = $7,360.00 8-15-2014 pep*** This permit is for the construction of a new 336s.f. detached accessory structure with reduced setbacks approved by Colleen Carroll. N / A ESC due to the small scope of the project and that all excavated material is proposed to remain on site. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/2/20152/3/20152/3/2015APASS
DetailsJim Storey
Tina Phone #: ###-####
DOC - Permit Finaled2/3/20152/3/20152/3/2015PPASS
DetailsJim Storey
BLD-Framing/Rough-in12/1/201412/1/201412/1/2014PPASS
DetailsJim Storey
tina Phone #: ###-####
BLD-Framing/Rough-in12/1/201412/1/201412/1/2014PPASS
DetailsJim Storey
tina Phone #: ###-####
BLD-Wall Bracing10/1/201410/2/201410/2/2014APASS
DetailsJim Sly
Tina Phone #: ###-####
BLD-Footing9/2/20149/2/20149/2/2014PPASS
DetailsJim Storey
Tina- after 4pm please Phone #: ###-####
BLD-Footing8/27/20148/28/20148/28/2014APASS
DetailsJim Storey
after 10am please // footing for shop // Tina Phone #: ###-####
Routing Walk-In (Zoning)8/19/20148/19/20148/19/2014ADONE
DetailsSue Cummings
Still no driveway - not for vehicle use
Routing Walk-In (BLD)8/19/20148/19/20148/19/2014APASS
DetailsPerry Paine
Inspection Record Card- Bld  8/19/2014 DONE
DetailsBarbara Stitt
Permit Ready to Issue  8/19/2014 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  8/19/2014 DONE
DetailsBarbara Stitt
PLANS/APPL TAKEN TO FRONT DESK  8/18/2014 DONE
Routing Walk-In (BLD)8/15/20148/15/20148/15/2014ADONE
DetailsPerry Paine
Inspection Record Card- Bld  8/15/2014  
PLANS/APPL TAKEN TO FRONT DESK  8/15/2014 DONE
Permit Ready to Issue  8/15/2014 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  8/15/2014 DONE
DetailsBarbara Stitt
Routing Walk-In (Zoning)8/12/20148/12/20148/12/2014PPASS
DetailsColleen T Carroll
no drive way not for vehicle use
Routing Walk-In (BLD)8/12/20148/12/20148/12/2014PDONE
DetailsPerry Paine
Plan assigned to (PEP)8/12/20148/12/20148/12/2014 PASS
DetailsPerry Paine
Inspection Record Card- Bld  8/12/2014  
1st review completed  8/12/2014  
PLANS/APPL TAKEN TO FRONT DESK  8/12/2014 DONE
Permit Ready to Issue  8/12/2014 DONE
DetailsBarbara Stitt
Issue PAID IN FULL permit  8/12/2014 DONE
DetailsBarbara Stitt
Application received 8/12/2014