Information based on query as of Saturday, July 13, 2024.
Permit Information
Permit NumberBLD14-02328
StatusFinaled
Name LITZINGER CONSTRUCTION CO
Site Address 1577 W SILVER CREST DR
Project NameStueve Residence
Customer Number 
ePlanReviewYes
Description
***4-21-2015 THIS PERMIT IS MODIFIED TO REFLECT THE INCLUSION OF THE 648S.F. INGROUND SWIMMING POOL MISSED ON THE ORIGINAL PERMIT APPLICATIONS AND APPROVED SITE AND DRAINAGE PLANS. N / A ADDED VALUE pep 4-21-2015**** WUI Zone A, Class A Roof, Permit for the construction of a new 4603 sq. ft., two story (first story 3945 sq. ft., second story 658 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 280 sq. ft. of covered patios/porches and 1315 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20158/4/20158/4/2015ADONE
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
DOC - Permit Finaled8/4/20158/4/20158/4/2015PPASS
DetailsTony Young
BLD-Final7/30/20157/31/20157/31/2015PPEND
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger,, ok pending pool fence
BLD-Final7/29/20157/30/20157/30/2015PDONE
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/29/20157/29/20157/29/2015PPEND
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/28/20157/28/20157/29/2015PPEND
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/27/20157/28/20157/28/2015APEND
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/27/20157/27/20157/27/2015PPEND
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/24/20157/27/20157/27/2015APEND
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/24/20157/24/20157/24/2015PNR
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/23/20157/24/20157/24/2015ANR
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Final7/22/20157/23/20157/23/2015PNR
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger,, needs hill side,, trades
BLD-Conference6/18/20156/19/20156/19/2015PPASS
DetailsTony Young
Kenny
BLD-Conference6/18/20156/18/20156/18/2015PPEND
DetailsTony Young
Kenny,, called and left a messege
Inspection Record Card- Bld  4/21/2015  
BLD-Energy code compliance2/20/20152/23/20152/23/2015PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Framing/Rough-in2/20/20152/23/20152/23/2015APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Framing/Rough-in2/19/20152/20/20152/20/2015APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger,, ok to insulate
BLD-Framing/Rough-in2/19/20152/19/20152/19/2015PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger,, need mech full pass,, but ok to insulate
BLD-Conference2/18/20152/18/20152/18/2015PPASS
DetailsTony Young
Fire caulk around wires Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Conference2/12/20152/12/20152/12/2015APART
DetailsTony Young
Soffit fire protection Phone #: ###-#### Inspection requested via web by Ken Litzinger,, ok pending electrical
Plan Modification Accepted  2/11/2015 DONE
new manual j report
Routing - MECHANICAL2/11/2015 2/11/2015 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing2/5/20152/6/20152/6/2015APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger,, exterior ok
BLD-Wall Bracing2/4/20152/5/20152/5/2015APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger, exterior work in progress
BLD-Wall Bracing2/4/20152/4/20152/4/2015PNR
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Wall Bracing2/1/20152/2/20152/2/2015ANR
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Conference2/1/20152/2/20152/2/2015APART
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger,, soofit ?s
BLD-Wall Bracing1/23/20151/23/20151/23/2015PNR
DetailsJim Sly
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
No Stamped approved plans .....Re-call for insp.
BLD-Foundation10/9/201410/9/201410/9/2014PPASS
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger
BLD-Footing10/6/201410/7/201410/7/2014APART
DetailsTony Young
Gate code #1599 Phone #: ###-#### Inspection requested via web by Ken Litzinger,, ok to pour when ready
PubWorks Subgrade Approval10/6/201410/6/201410/6/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  10/1/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Bld  10/1/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  9/29/2014  
Routing - FIRE9/26/20149/26/20149/29/2014 PASS
DetailsScott Arellano
Approved. This structure is subject to the Defensible Space provisions of BMC 7-01-69 section 4920. See Boise Municiple Code for details.
Plan assigned to (PEP)9/4/20149/4/20149/29/2014 PASS
DetailsPerry Paine
Hillside ePlan
Routing - PLAN CHECK9/2/2014 9/29/2014 PASS
DetailsPerry Paine
Routing - MECHANICAL9/26/2014 9/29/2014 FAIL
DetailsTroy James
previous corrections have not been addressed.
Routing - MECHANICAL9/29/2014 9/29/2014 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  9/29/2014 DONE
Permit Ready to Issue  9/29/2014 DONE
DetailsCandy A. Nichols
Plan resubmittals received  9/26/2014  
Plan resubmittals received  9/26/2014 DONE
Assigned to fire and mechanical
Routing - FIRE9/2/20149/2/20149/8/2014 FAIL
DetailsScott Arellano
Emailed plan review report to architect. Attached report to case.
Routing - MECHANICAL9/2/2014 9/8/2014 FAIL
DetailsTroy James
emailed corrections to idaho hvac
1st review completed  9/8/2014 DONE
DetailsPerry Paine
Plan assigned to (JG)9/2/20149/2/20149/4/2014 DEFR
DetailsJavier Guzman
9/18 TH L2 Hillside ePlan**
Routing - Addressing9/2/2014 9/3/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS9/2/2014 9/3/2014 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside9/2/2014 9/3/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PLANNING9/2/2014 9/3/2014 PASS
DetailsSue Cummings
Routing PW Sewer Rating9/3/2014 9/3/2014 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment9/2/2014 9/3/2014 PASS
DetailsEvan Jenkins
ESC Narrative and Site Maps are approved.
A Site Prep Inspection is required prior to any earth disturbance
Recd Pcfee & Taken To Pln CK  9/2/2014 DONE
DetailsCandy A. Nichols
Intake Approval  9/2/2014 PASS
DetailsCandy A. Nichols
Plans ACCEPTED BY PLAN TECH  8/21/2014 DONE
DetailsCandy A. Nichols
reference e plan review checklist corrections
Application received  8/13/2014 DONE
Application submitted via PDS Online on Aug 13 2014 10:14AM