Permit Information
Permit NumberBLD14-02340
StatusFinaled
Name HC COMPANY INC
Site Address 401 W FRONT ST Unit: 308
Project NameIdaho Independent Bank 3rd flo
Customer Number 
ePlanReviewNo
Description
(ZASIO – Idaho Independent Bank – 3rd floor – Soffit and ceiling remodel) This building is fully sprinklered for allowable height and area increase. Permit for remodel of 5,661 square foot office. The last permit to occupy this space was done under “BLD13-02397”. Work includes: construction of interior non-combustible soffit, installation of a new suspended ceiling, installation of new lighting, and interior finishes. Interior finishes shall be per chapter 8 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice9/23/20149/23/20149/30/2014 DONE
DetailsDave Hannah
This permit finaled on the web by Jeremy Barber
First Notice9/23/20149/23/20149/30/2014 DONE
DetailsDave Hannah
This permit finaled on the web by Jeremy Barber
BLD-Final9/22/20149/23/20149/23/2014APASS
DetailsDave Hannah
Located on the third floor of the building in the South East corner. The conference room is directly East of the reception desk. Phone #: ###-#### Inspection requested via web by Jeremy Barber
DOC - Permit Finaled9/23/20149/23/20149/23/2014PPASS
DetailsDave Hannah
DOC - Permit Finaled9/23/20149/23/20149/23/2014PPASS
DetailsDave Hannah
FIRE-Final Inspection9/18/20149/19/20149/19/2014PPASS
DetailsForrest France
Fire life safety inspection passed. No signature card available on site.
BLD-Final9/17/20149/18/20149/19/2014ANR
DetailsDave Hannah
Space is on the third floor of the building in the South East corner. The conference room ceiling is complete. Phone #: ###-#### Inspection requested via web by Jeremy Barber
BLD-Ceiling Grid Inspection9/3/20149/5/20149/5/2014APASS
DetailsDave Hannah
The conference room is on the third floor of the building to the East of the elevator bank. Phone #: ###-#### Inspection requested via web by Jeremy Barber
BLD-Framing/Rough-in8/25/20148/25/20148/25/2014PPASS
DetailsDave Hannah
The space is on the third floor of the building and will be on the East side of the elevator bank. The space is occupied so the receptionist may ask what you need to look at. The conference room remodel is directly East of the reception desk. Phone #: ###-#### Inspection requested via web by Jeremy Barber
Application received 8/13/20148/13/2014 DONE
Plans ACCEPTED BY PLAN CHECK  8/13/2014 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)8/13/2014 8/13/2014 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/13/2014 8/13/2014 PASS
DetailsTim L. Woodard
1st review completed  8/13/2014 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/13/2014 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/13/2014 DONE
DetailsTim L. Woodard
Permit Ready to Issue  8/13/2014 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  8/13/2014 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  8/13/2014 DONE
DetailsTisha Gallop