Second Notice | | 6/20/2015 | 7/9/2015 | | DONE |
|
|
|
Mailed 7-10-15
|
First Notice | | 5/2/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Permanent Occupancy | | | 4/22/2015 | | DONE |
|
|
|
|
BLD-Final | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 4/20/2015 | 4/21/2015 | 4/21/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 4/15/2015 | 4/20/2015 | 4/20/2015 | P | NR |
Mike Jordan
|
|
|
Ron Phone #: ###-####
|
FIRE-Final Inspection | 4/15/2015 | 4/20/2015 | 4/20/2015 | A | FAIL |
Troy Cobbley
|
|
|
Life safety ok to pass when the project related fire sprinkler and fire alarm permits are passed.
|
PubWorks Occupancy Approval | 4/20/2015 | 4/20/2015 | 4/20/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 4/17/2015 | 4/17/2015 | 4/17/2015 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Framing/Rough-in | 3/31/2015 | 4/1/2015 | 4/1/2015 | P | CANC |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/31/2015 | 4/1/2015 | 4/1/2015 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/26/2015 | 3/30/2015 | 3/30/2015 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Exterior soffit ok.
|
BLD-Energy code compliance | 3/12/2015 | 3/13/2015 | 3/13/2015 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 3/10/2015 | 3/10/2015 | 3/10/2015 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/6/2015 | 3/9/2015 | 3/10/2015 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior steel stud and wood framed walls for mezz. ok.
|
BLD-Framing/Rough-in | 3/6/2015 | 3/6/2015 | 3/6/2015 | P | NR |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2015 | 2/26/2015 | 2/26/2015 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior steel stud walls at loading dock.
|
BLD-Framing/Rough-in | 2/24/2015 | 2/25/2015 | 2/25/2015 | A | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Interior shear wall and decking diaphragm for interior mezz.
|
BLD-Framing/Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. joist hangar connections to 2.x6 per red built installation details.
|
BLD-Foundation | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Jim Storey
|
|
|
Rebar // Jim Phone #: ###-####
|
BLD-Footing | 2/10/2015 | 2/11/2015 | 2/11/2015 | A | PASS |
Mike Jordan
|
|
|
Jim-would like mid morning if poss Phone #: ###-####. column pad footings for mezz, footing for loading dock retaining walls.
|
BLD-Foundation | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PART |
Mike Jordan
|
|
|
Rebar // Jim Phone #: ###-####.. work in progress on reinforcement for loading dock walls. Ok pending special inspection.
|
BLD-Other | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PART |
Mike Jordan
|
|
|
Welding // Jim Phone #: ###-####. Panel to panel and beam pockets. Reviewed special inspection reports to date. All welding also inspected by special inspection.
|
BLD-Footing | 12/16/2014 | 12/18/2014 | 12/18/2014 | A | PART |
Mike Jordan
|
|
|
phone call from Jim for the change//JIm Phone #: ###-####. Work in progress on remainder of exterior footings and loading dock footings. Pending special inspection.
|
BLD-Footing | 12/15/2014 | 12/15/2014 | 12/15/2014 | P | PASS |
Mike Jordan
|
|
|
JIm// pour time is 1pm Phone #: ###-####. Exterior footing on ridline C between grids 1.5 to 6.
|
BLD-Footing | 12/1/2014 | 12/2/2014 | 12/2/2014 | A | DEFR |
Mike Jordan
|
|
|
Concrete tilt walls rebar - Jim Phone #: ###-####. Pending special inspection.
|
BLD-Foundation | 11/12/2014 | 11/14/2014 | 11/14/2014 | A | CANC |
Mike Jordan
|
|
|
Jim-rebar Phone #: ###-####
|
BLD-Foundation | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Mike Jordan
|
|
|
Jim-rebar Phone #: ###-####. Concrete tilt panels 1 to 18 and 22 to32.
|
OVERRIDE | | | 11/4/2014 | | |
|
|
|
|
BLD-Footing | 10/22/2014 | 10/24/2014 | 10/24/2014 | P | PASS |
Mike Jordan
|
|
|
Jim-as early pm as possible pour time 1:30 Phone #: ###-####. interio column pad footings ok.
|
CHANGE STATUS TO (ISS) | | | 10/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 10/10/2014 | | DONE |
Candy A. Nichols
|
|
|
talked to Valorie @ ACHD-yes inspection is needed and that all fees were paid
|
Issue PAID IN FULL permit | | | 10/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing Off Site - STRUCTURAL | 9/30/2014 | | 10/7/2014 | | PASS |
John Menard
|
|
|
Received letter from consulting engineer approving last resubmittals. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2014 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 10/7/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 10/7/2014 | | DONE |
|
|
|
called Gayle- gave fees and informed him that we needed ACHD- also emailed him fees
|
Plan assigned to (JCM) | 8/15/2014 | | 10/7/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 8/23/2014
|
Permit Ready to Issue | | | 10/7/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan resubmittals received | | | 9/30/2014 | | DONE |
Christina Prado
|
|
|
Received three sets of revised structural calcs and plans marked S1.1, S2.1, S3.1, S6.1, S6.2, S7.1, S7.2, S7.3, S7.4, S7.5, S8.1 & S9.1; PLANS INSERTED BY ARCH REP AND TAKEN TO JCM FOR FURTHER REVIEW
|
Plan resubmittals requested | | | 9/22/2014 | | |
John Menard
|
|
|
E-mailed the applicant a copy of the second structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 9/12/2014 | | 9/22/2014 | | FAIL |
John Menard
|
|
|
E-mailed our consultant a copy of the revised calculations. JCM
|
Routing - PLAN CHECK | 9/15/2014 | | 9/15/2014 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 9/12/2014 | | 9/15/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 09-15-14
|
Routing - PLAN CHECK | 9/4/2014 | | 9/12/2014 | | |
John Menard
|
|
|
|
Route to Impact Fee Review | 9/4/2014 | 9/7/2014 | 9/11/2014 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals received | | | 9/11/2014 | | DONE |
Christina Prado
|
|
|
Received two revised sets of plans marked SP-1, A1 & A6 as well as two response letters (FIR & BLD) as well as two sest of lighting calcs;Plans inserted by arch rep and taken to John for further review
|
Plan resubmittals requested | | | 9/4/2014 | | DONE |
John Menard
|
|
|
E-mailed the applicant a copy of the plan review requesting revisions. JCM
|
1st review completed | | | 9/4/2014 | | DONE |
|
|
|
Failed: Structural, Plan Check, Fire
|
Routing - FIRE | 9/4/2014 | | 9/4/2014 | | FAIL |
|
|
|
See Fire Plan Review 09-04-14
|
Routing - PLAN CHECK | 8/27/2014 | | 9/4/2014 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 8/15/2014 | | 9/3/2014 | | FAIL |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 8/26/2014 | | 8/28/2014 | | PASS |
Evan Jenkins
|
|
|
ESC Plan was submitted 8-28-14 and approved
|
Routing - PLUMBING | | | 8/27/2014 | | PASS |
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | | | 8/27/2014 | | PASS |
Barbara Moore
|
|
|
Approved per Bev Mountain
|
Routing PW Sewer Design | 8/25/2014 | | 8/25/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 8/22/2014 | | 8/25/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Solid Waste | 8/25/2014 | | 8/25/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | 8/18/2014 | | 8/22/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 8/15/2014 | | 8/18/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Application received | | 8/14/2014 | 8/15/2014 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Pending Assignment by JCM | 8/15/2014 | | 8/15/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLANNING | 8/15/2014 | | 8/15/2014 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLANNING Land Div | 8/15/2014 | | 8/15/2014 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 8/15/2014 | | PASS |
John Menard
|
|
|
|