Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-02350
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 12324 W EXECUTIVE DR
Project NameAdvanced Hardware Supply Inc
Customer Number 
ePlanReviewNo
Description
Advanced Hardware Supply - To construct a new 28,130 square foot, one story warehouse with a 2,160 sq. ft. storage mezzanine. There will be 2,160 square feet of accessory office and retail space. This new building is constructed of concrete tilt-up exterior walls with steel interior structural frame, steel roof joists and metal roof deck. This building is fully fire sprinklered. The sprinklers are used for are increase. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/20/20157/9/2015 DONE
Mailed 7-10-15
First Notice 5/2/20156/10/2015 DONE
Mailed out 6-10-15
Permanent Occupancy  4/22/2015 DONE
BLD-Final4/20/20154/21/20154/21/2015APASS
DetailsMike Jordan
Jim Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection4/20/20154/21/20154/21/2015APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final4/15/20154/20/20154/20/2015PNR
DetailsMike Jordan
Ron Phone #: ###-####
FIRE-Final Inspection4/15/20154/20/20154/20/2015AFAIL
DetailsTroy Cobbley
Life safety ok to pass when the project related fire sprinkler and fire alarm permits are passed.
PubWorks Occupancy Approval4/20/20154/20/20154/20/2015 DONE
DetailsTiffany Lowery
Zoning Approval4/17/20154/17/20154/17/2015 DONE
DetailsAndrea Tuning
BLD-Framing/Rough-in3/31/20154/1/20154/1/2015PCANC
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Ceiling Grid Inspection3/31/20154/1/20154/1/2015PPASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/26/20153/30/20153/30/2015APASS
DetailsMike Jordan
Jim Phone #: ###-####. Exterior soffit ok.
BLD-Energy code compliance3/12/20153/13/20153/13/2015APASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Energy code compliance3/10/20153/10/20153/10/2015APASS
DetailsMike Jordan
Jim Phone #: ###-####
BLD-Framing/Rough-in3/6/20153/9/20153/10/2015PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Interior steel stud and wood framed walls for mezz. ok.
BLD-Framing/Rough-in3/6/20153/6/20153/6/2015PNR
DetailsPhil Shearer
Jim Phone #: ###-####
BLD-Framing/Rough-in2/26/20152/26/20152/26/2015PPASS
DetailsMike Jordan
Jim Phone #: ###-####. Interior steel stud walls at loading dock.
BLD-Framing/Rough-in2/24/20152/25/20152/25/2015APASS
DetailsMike Jordan
Jim Phone #: ###-####. Interior shear wall and decking diaphragm for interior mezz.
BLD-Framing/Rough-in2/19/20152/20/20152/20/2015PPASS
DetailsMike Jordan
Jim Phone #: ###-####. joist hangar connections to 2.x6 per red built installation details.
BLD-Foundation2/12/20152/12/20152/12/2015PPASS
DetailsJim Storey
Rebar // Jim Phone #: ###-####
BLD-Footing2/10/20152/11/20152/11/2015APASS
DetailsMike Jordan
Jim-would like mid morning if poss Phone #: ###-####. column pad footings for mezz, footing for loading dock retaining walls.
BLD-Foundation1/30/20151/30/20151/30/2015PPART
DetailsMike Jordan
Rebar // Jim Phone #: ###-####.. work in progress on reinforcement for loading dock walls. Ok pending special inspection.
BLD-Other1/28/20151/29/20151/29/2015APART
DetailsMike Jordan
Welding // Jim Phone #: ###-####. Panel to panel and beam pockets. Reviewed special inspection reports to date. All welding also inspected by special inspection.
BLD-Footing12/16/201412/18/201412/18/2014APART
DetailsMike Jordan
phone call from Jim for the change//JIm Phone #: ###-####. Work in progress on remainder of exterior footings and loading dock footings. Pending special inspection.
BLD-Footing12/15/201412/15/201412/15/2014PPASS
DetailsMike Jordan
JIm// pour time is 1pm Phone #: ###-####. Exterior footing on ridline C between grids 1.5 to 6.
BLD-Footing12/1/201412/2/201412/2/2014ADEFR
DetailsMike Jordan
Concrete tilt walls rebar - Jim Phone #: ###-####. Pending special inspection.
BLD-Foundation11/12/201411/14/201411/14/2014ACANC
DetailsMike Jordan
Jim-rebar Phone #: ###-####
BLD-Foundation11/12/201411/12/201411/12/2014PPASS
DetailsMike Jordan
Jim-rebar Phone #: ###-####. Concrete tilt panels 1 to 18 and 22 to32.
OVERRIDE  11/4/2014  
BLD-Footing10/22/201410/24/201410/24/2014PPASS
DetailsMike Jordan
Jim-as early pm as possible pour time 1:30 Phone #: ###-####. interio column pad footings ok.
CHANGE STATUS TO (ISS)  10/10/2014 DONE
DetailsCandy A. Nichols
Telephone call  10/10/2014 DONE
DetailsCandy A. Nichols
talked to Valorie @ ACHD-yes inspection is needed and that all fees were paid
Issue PAID IN FULL permit  10/10/2014 DONE
DetailsCandy A. Nichols
Routing Off Site - STRUCTURAL9/30/2014 10/7/2014 PASS
DetailsJohn Menard
Received letter from consulting engineer approving last resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  10/7/2014 DONE
DetailsJohn Menard
Print Occupancy Form  10/7/2014 DONE
DetailsChristina Prado
Telephone call  10/7/2014 DONE
called Gayle- gave fees and informed him that we needed ACHD- also emailed him fees
Plan assigned to (JCM)8/15/2014 10/7/2014 PASS
DetailsJohn Menard
1st Review Complete 8/23/2014
Permit Ready to Issue  10/7/2014 DONE
DetailsCandy A. Nichols
Plan resubmittals received  9/30/2014 DONE
DetailsChristina Prado
Received three sets of revised structural calcs and plans marked S1.1, S2.1, S3.1, S6.1, S6.2, S7.1, S7.2, S7.3, S7.4, S7.5, S8.1 & S9.1; PLANS INSERTED BY ARCH REP AND TAKEN TO JCM FOR FURTHER REVIEW
Plan resubmittals requested  9/22/2014  
DetailsJohn Menard
E-mailed the applicant a copy of the second structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL9/12/2014 9/22/2014 FAIL
DetailsJohn Menard
E-mailed our consultant a copy of the revised calculations. JCM
Routing - PLAN CHECK9/15/2014 9/15/2014 PASS
DetailsJohn Menard
Routing - FIRE9/12/2014 9/15/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 09-15-14
Routing - PLAN CHECK9/4/2014 9/12/2014  
DetailsJohn Menard
Route to Impact Fee Review9/4/20149/7/20149/11/2014 PASS
DetailsCindy M. Gould
Plan resubmittals received  9/11/2014 DONE
DetailsChristina Prado
Received two revised sets of plans marked SP-1, A1 & A6 as well as two response letters (FIR & BLD) as well as two sest of lighting calcs;Plans inserted by arch rep and taken to John for further review
Plan resubmittals requested  9/4/2014 DONE
DetailsJohn Menard
E-mailed the applicant a copy of the plan review requesting revisions. JCM
1st review completed  9/4/2014 DONE
Failed: Structural, Plan Check, Fire
Routing - FIRE9/4/2014 9/4/2014 FAIL
Details
See Fire Plan Review 09-04-14
Routing - PLAN CHECK8/27/2014 9/4/2014 FAIL
DetailsJohn Menard
Routing Off Site - STRUCTURAL8/15/2014 9/3/2014 FAIL
DetailsJohn Menard
Routing - Erosion and Sediment8/26/2014 8/28/2014 PASS
DetailsEvan Jenkins
ESC Plan was submitted 8-28-14 and approved
Routing - PLUMBING  8/27/2014 PASS
Per plan and ISPC.
Routing - PUBLIC WORKS  8/27/2014 PASS
DetailsBarbara Moore
Approved per Bev Mountain
Routing PW Sewer Design8/25/2014 8/25/2014 PASS
DetailsKyle S. Rosenmeyer
Routing PW Sewer Rating8/22/2014 8/25/2014 PASS
DetailsJennifer Bruner
Routing PW Solid Waste8/25/2014 8/25/2014 PASS
DetailsPeter J. McCullough
Routing PW Drainage8/18/2014 8/22/2014 PASS
DetailsBrian Murphy
Routing - Addressing8/15/2014 8/18/2014 PASS
DetailsJason C. Taylor
Application received 8/14/20148/15/2014 DONE
Plans ACCEPTED BY PLAN TECH  8/15/2014 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/15/2014 DONE
DetailsTisha Gallop
Pending Assignment by JCM8/15/2014 8/15/2014 DONE
DetailsJohn Menard
Routing - PLANNING8/15/2014 8/15/2014 PASS
DetailsAndrea Tuning
Routing - PLANNING Land Div8/15/2014 8/15/2014 PASS
DetailsAndrea Tuning
Intake Approval  8/15/2014 PASS
DetailsJohn Menard