Second Notice | | 5/14/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
Print Statement | | | 5/28/2015 | | DONE |
|
|
|
|
Print Statement | | | 5/28/2015 | | DONE |
|
|
|
|
First Notice | | 4/12/2015 | 5/4/2015 | | DONE |
|
|
|
|
BLD-Final | 4/1/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
FIRE-Final Inspection | 4/1/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PubWorks Occupancy Approval | 4/2/2015 | 4/2/2015 | 4/2/2015 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 4/2/2015 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Troy Cobbley
|
|
|
Life safety passed in the new two story addition. This includes the stand alone elevator recall.
|
BLD-Final | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### temp ok for new addition
|
BLD-Conference | 1/23/2015 | 1/26/2015 | 1/26/2015 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
FIRE-Conference | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | DONE |
Troy Cobbley
|
|
|
Went over phasing of the project with Tom.
|
BLD-Framing/Rough-in | 1/7/2015 | 1/8/2015 | 1/8/2015 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### conf on stairs
|
BLD-Framing/Rough-in | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Jim Storey
|
|
|
tom Phone #: ###-#### refu area ok to cover
|
BLD-Framing/Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | P | FAIL |
Jim Storey
|
|
|
Tom Phone #: ###-#### area of refuse hold on this end of building/ roof ceilling and duct proction required.
|
BLD-Energy code compliance | 12/10/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2014 | 12/10/2014 | 12/10/2014 | P | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### ok to insulate. Needsto install lat bracing in trusses ,king studs two ply trusses , plumbing rough in , air seal ok.
|
BLD-Framing/Rough-in | 11/18/2014 | 11/19/2014 | 11/19/2014 | A | PART |
Jim Storey
|
|
|
tom Phone #: ###-#### ok to pre rock for mech and ele pannel
|
BLD-Other | 10/28/2014 | 10/28/2014 | 10/29/2014 | P | PART |
Jim Storey
|
|
|
Rebar - Tom Phone #: ###-#### ok pending si report
|
BLD-Footing | 10/22/2014 | 10/23/2014 | 10/23/2014 | P | PASS |
Jim Storey
|
|
|
tom - late pm Phone #: ###-####
|
OVERRIDE | | | 10/20/2014 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/20/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/20/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/20/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/16/2014 | | 10/16/2014 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2014 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 8/18/2014 | | 10/16/2014 | | PASS |
John Menard
|
|
|
1st Review Complete 9/15/2014
|
Routing - PLAN CHECK | 10/6/2014 | | 10/9/2014 | | FAIL |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 10/6/2014 | | 10/7/2014 | | PASS |
John Menard
|
|
|
|
Routing - FIRE | 10/6/2014 | | 10/6/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 10-06-14
|
1st review completed | | | 9/15/2014 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 8/18/2014 | | 9/15/2014 | | FAIL |
John Menard
|
|
|
|
Telephone call | | | 9/3/2014 | | |
|
|
|
Spoke with Architect Mark Anderson regarding hydrants. Told him that although 3 are required he must likely can add one in NW corner of lot and ask FM for a waiver for the third hydrant. CDH 09-03-14
|
Routing - FIRE | 8/18/2014 | 8/18/2014 | 9/2/2014 | | FAIL |
|
|
|
See Fire Plan Review 09-02-14
|
Routing Off Site - STRUCTURAL | 8/18/2014 | | 8/29/2014 | | FAIL |
John Menard
|
|
|
|
Routing PW Drainage | 8/18/2014 | | 8/28/2014 | | PASS |
Brian Murphy
|
|
|
|
Route to Impact Fee Review | 8/18/2014 | 8/21/2014 | 8/26/2014 | | PASS |
Cindy M. Gould
|
|
|
Police and Fire Impact Fees added manually.
|
Routing - PLUMBING | 8/18/2014 | | 8/18/2014 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - PLANNING Land Div | 8/18/2014 | | 8/18/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 8/18/2014 | | 8/18/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 8/18/2014 | | 8/18/2014 | | PASS |
Andy J. Long
|
|
|
SWPPP and ESC site plan approved. RP to be designated.
|
Routing - Design Review | 8/18/2014 | | 8/18/2014 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 8/18/2014 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 8/18/2014 | | 8/18/2014 | | DONE |
John Menard
|
|
|
|
Application received | | | 8/14/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 14 2014 2:38PM
|