Permit Information
Permit NumberBLD14-02379
StatusFinaled
Name DULIN SHAWN M
Site Address 1427 E HAYS ST
Project Name 
Customer Number 
ePlanReviewNo
Description
garage. This permit is for the construction of a new garage in place of an existing concrete parking slab. The new 576s.f. 2-car garage plan is submitted with foundation engineering per the city hillside ordinance. Separate ESC permit is required. All per the approved plans as marked and the engineering calculations with details along with the plan review notes. pepA letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/201410/20/201410/20/2014PPASS
DetailsDave Hannah
Bob Phone #: ###-####
DOC - Permit Finaled10/20/201410/20/201410/20/2014PPASS
DetailsDave Hannah
BLD-Framing/Rough-in10/7/201410/8/201410/8/2014APASS
DetailsDave Hannah
Bob Phone #: ###-####
BLD-Wall Bracing10/7/201410/8/201410/8/2014APASS
DetailsDave Hannah
Bob Phone #: ###-####
BLD-Wall Bracing10/6/201410/7/201410/7/2014AFAIL
DetailsDave Hannah
Bob Phone #: ###-#### needs to restapel or nail
BLD-Framing/Rough-in10/6/201410/7/201410/7/2014APART
DetailsDave Hannah
Bob Phone #: ###-#### need truss enginering
BLD-Foundation9/2/20149/2/20149/3/2014PPASS
DetailsDave Hannah
Pat-wall Phone #: ###-####
BLD-Footing8/29/20148/29/20148/29/2014PPASS
DetailsPhil Shearer
Pat Phone #: ###-####
PubWorks Subgrade Approval8/29/20148/29/20148/29/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  8/15/2014  
Routing Walk-In (PW Hillside)8/15/20148/15/20148/15/2014PPASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (BLD)8/15/20148/15/20148/15/2014PDONE
DetailsPerry Paine
Routing Walk-In (Zoning)8/15/20148/15/20148/15/2014PPASS
DetailsSue Cummings
Plan assigned to (PEP)8/15/20148/15/20148/15/2014 PASS
DetailsPerry Paine
1st review completed  8/15/2014 DONE
Received Certificate of Value  8/15/2014 DONE
1st review completed  8/15/2014 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/15/2014 DONE
Permit Ready to Issue  8/15/2014 DONE
DetailsBarbara Stitt
Inspection Record Card- Bld  8/15/2014  
Issue PAID IN FULL permit  8/15/2014 DONE
DetailsBarbara Stitt
Application received 8/15/2014