Permit Information
Permit NumberBLD14-02396
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1600 W GOWEN RD
Project NameSkyWest Maintenance Hangar
Customer Number 
ePlanReviewYes
Description
(SkyWest Maintenance Hangar - Grading/Drainage only) Permit to excavate, grade and compact site earth materials in preparation for a future aircraft maintenance hangar building. Install curb, gutter, paving, striping and landscaping as approved by the Public Works and Planning & Zoning Departments. Underground site utilities are included in this scope of work. No buildings or footings are to be constructed under this permit. // leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  1/6/2016 DONE
emailed Able that there are no final values required for grading permits.
Print Statement  12/28/2015 DONE
Third Notice 11/14/201512/10/2015 DONE
Third Notice 10/17/201511/9/2015 DONE
Second Notice 9/25/201510/12/2015 DONE
Mailed 10-13-15
First Notice8/25/20158/25/20159/15/2015 DONE
DetailsCandy A. Nichols
mailed 9-15-15
BLD-Final8/25/20158/25/20158/25/2015ADONE
DetailsJim Storey
DOC - Permit Finaled8/25/20158/25/20158/25/2015PPASS
DetailsJim Storey
FIRE-Final Inspection8/20/20158/21/20158/21/2015APASS
DetailsJim Page
Life fire safety inspection passed/complete
BLD-Final8/20/20158/20/20158/20/2015PPASS
DetailsJim Storey
Phone #: ###-####
FIRE-Final Inspection8/19/20158/19/20158/19/2015PFAIL
DetailsTroy Cobbley
Provide fire dept access signage as per note #12. All other items appear ok.
FIRE-Final Inspection8/14/20158/14/20158/14/2015PCANC
DetailsJim Page
Tom Phone #: ###-####
PubWorks Occupancy Approval8/12/20158/12/20158/12/2015 DONE
DetailsTiffany Lowery
BLD-Final8/10/20158/11/20158/11/2015ANR
DetailsJim Storey
Tom Phone #: ###-####
BLD-Conference8/10/20158/10/20158/10/2015PPASS
DetailsJim Storey
Tom Phone #: ###-####
Routing - FIRE11/17/201411/17/201411/18/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Mod Rev 1 11-18-14
PLANS/APPL TAKEN TO FRONT DESK  11/18/2014 DONE
approved plan mod
CHANGE STATUS TO (ISS)  11/18/2014 DONE
batch stamped approved plan mod, no fees due.
Plan assigned to (LEG) Tisha10/28/2014 11/18/2014 DONE
DetailsTisha Gallop
plan mod; 11/4/14 failed fire
Plan resubmittals received  11/17/2014 DONE
Routing - PLAN CHECK11/17/2014 11/17/2014 PASS
DetailsTisha Gallop
Tisha
Routing PW Solid Waste10/28/2014 11/4/2014 PASS
DetailsPeter J. McCullough
per ePlan
Routing - PUBLIC WORKS10/28/2014 11/4/2014 PASS
DetailsTisha Gallop
Per ePlan
Routing - FIRE10/28/201410/28/201411/3/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review Mod 11-03-14
Routing PW Environmental10/28/2014 11/3/2014 PASS
DetailsRick Christenson
per ePlan
Routing PW Sewer Design10/28/2014 10/30/2014 PASS
DetailsKyle S. Rosenmeyer
Routing - Design Review10/28/2014 10/29/2014 PASS
DetailsCody Riddle
The project is not located in a DR overlay, so their approval is not required. CER
Routing - Erosion and Sediment10/28/2014 10/29/2014 PASS
DetailsEvan Jenkins
Site Prep Inspection Already Performed. A new aircraft maintenance hangar building with office space and warehouse space attached. Sitework includes utilities, parking, airplane apron and landscaping. 134,000 SF Maintanence Hanger
Routing PW Drainage10/28/2014 10/29/2014 PASS
DetailsBrian Murphy
Plan Modification Accepted  10/28/2014 DONE
plan mod workflow started.
Routing - PLAN CHECK10/28/2014 10/28/2014 PASS
DetailsTisha Gallop
Routing - PLUMBING10/28/2014 10/28/2014 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Issue PAID IN FULL permit  9/30/2014 DONE
DetailsChristina Prado
Inspection Record Card- Bld  9/30/2014 DONE
DetailsChristina Prado
OVERRIDE  9/29/2014  
Permit Ready to Issue  9/29/2014 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  9/26/2014 DONE
DetailsTisha Gallop
Routing PW Drainage9/17/2014 9/26/2014 PASS
DetailsBrian Murphy
Plan assigned to (LEG) Tisha9/2/2014 9/26/2014 DONE
DetailsTisha Gallop
Routing PW Sewer Design9/25/2014 9/25/2014 PASS
DetailsKyle S. Rosenmeyer
Routing - FIRE9/17/20149/17/20149/18/2014 PASS
DetailsCraig D. Hanson
See Fire Plan Review Rev 1 09-18-14
Routing PW Sewer Design9/17/2014 9/17/2014 FAIL
DetailsKyle S. Rosenmeyer
Add pipe support to pressure line inside manhole (Stainless steel straps or equivalent).
Label existing manhole: MH 360N8.
Contact Boise public works 48 hours prior to instruction to obtain tap permit and schedule inspection.
Plan resubmittals received  9/17/2014 DONE
DetailsTisha Gallop
ePlan
Routing - PLAN CHECK9/17/2014 9/17/2014 PASS
DetailsTisha Gallop
1st review completed  9/2/2014 DONE
DetailsTisha Gallop
failed Sewer Design, Drainage, Fire
Routing PW Solid Waste8/20/2014 9/2/2014 PASS
DetailsPeter J. McCullough
passed in e-plan
Routing PW Environmental8/20/2014 9/2/2014 PASS
DetailsRick Christenson
passed in e-plan
Routing PW Street Lights8/20/2014 9/2/2014 CANC
DetailsMike D Hedge
no reveiw per e-plan
Plan assigned to (CAN) Candy8/20/2014 9/2/2014 DEFR
DetailsCandy A. Nichols
defr to Tisha Gallop
Routing - FIRE8/20/20148/20/20148/29/2014 FAIL
DetailsCraig D. Hanson
See Fire Plan Review 08-29-14
Routing PW Drainage8/20/2014 8/26/2014 FAIL
DetailsBrian Murphy
need drainage report
Routing PW Sewer Design8/20/2014 8/21/2014 FAIL
DetailsKyle S. Rosenmeyer
Discharge manhole must be coated with T-Lock, Sauereisen, or Spray Rock protective coatings. Show profile for force main. Place Air-Release Valves at high points per SD-513. Place Location Wire Boxes in 1000' intervals per SD-514. Install Pressure Sewer Cleanouts per SD-515 in the ISPWC. Install dry service line (size dictated by mechanical drawings) to the southern edge of site improvements for future gravity sewer service from Gowen Road. Use minimum slopes for service line. Cap and mark service line with finder wire per SD-512.
Routing PW Sewer Rating8/20/2014 8/21/2014 PASS
DetailsBeverly Mountain
Waiting for full plans to submit fees. bam
Routing - PLANNING8/20/2014 8/21/2014 PASS
DetailsSarah Schafer
Approved for earthwork only. CER

Parking lot and utilities okay for construction. The 9/8/14 CUP hearing is only for the height of the proposed aircraft hangar. The other improvments are allowed
Routing - Erosion and Sediment8/20/2014 8/21/2014 PASS
DetailsEvan Jenkins
Routing - PLANNING Land Div8/20/2014 8/20/2014 PASS
DetailsDave Abo
Routing - PUBLIC WORKS8/20/2014 8/20/2014 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK8/20/2014 8/20/2014 PASS
DetailsTisha Gallop
Routing - PLUMBING8/20/2014 8/20/2014 PASS
DetailsDaryl Spivey
Telephone call  8/19/2014 DONE
DetailsCandy A. Nichols
called Tracey twice-need to know the correct valuation for just this part of the project. Left message both times
Intake Approval  8/19/2014 PASS
DetailsCandy A. Nichols
Application received  8/18/2014 DONE
Application submitted via PDS Online on Aug 18 2014 2:44PM