Permit Information
Permit NumberBLD14-02401
StatusFinaled
Name CANYON CREST HOMES
Site Address 4276 N ARROW VILLA WAY
Project NameJones
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2674 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 413 sq. ft. of covered patio/porch and a 757 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  12/31/2015 DONE
final 12-30-14
PubWorks Occupancy Approval4/22/20154/22/20154/22/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Blower Door Test Results12/30/201412/31/201412/31/2014PPASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper,, (4)
BLD-Final12/29/201412/30/201412/30/2014APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Final12/29/201412/29/201412/29/2014PCANC
DetailsPhil Shearer
Phone #: ###-#### >> Inspection requested via web by David Wipper Inspection cancelled via mobile web on Monday, December 29, 2014.
PubWorks Occupancy Approval12/24/201412/24/201412/24/2014 DONE
DetailsJason C. Taylor
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Wall cover10/24/201410/27/201410/27/2014PPASS
DetailsMike Jordan
WUI 1 hour soffit Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Energy code compliance10/24/201410/27/201410/27/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Framing/Rough-in10/24/201410/24/201410/24/2014PPASS
DetailsTony Young
late PM please Phone #: ###-#### Inspection requested via web by David Wipper,, verify seal pack
BLD-Other10/24/201410/24/201410/24/2014PPART
DetailsTony Young
WUI drywall soffit inspection
late PM please Phone #: ###-#### Inspection requested via web by David Wipper,, light boxes ok,, double layer of 5/8" work in progress on soffits ok
BLD-Wall Bracing10/14/201410/15/201410/15/2014APASS
DetailsTony Young
Exterior shear wall inspection Phone #: ###-#### Inspection requested via web by David Wipper
BLD-Foundation9/17/20149/18/20149/18/2014APASS
DetailsJim Sly
Shawn-late am pour Phone #: ###-####
BLD-Footing9/17/20149/17/20149/17/2014PPASS
DetailsTony Young
Shawn-2:00 pour time Phone #: ###-####
PubWorks Subgrade Approval9/17/20149/17/20149/17/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  9/11/2014 DONE
DetailsCandy A. Nichols
OVERRIDE  9/10/2014  
Permit Ready to Issue  9/10/2014 DONE
DetailsChristina Prado
Plan assigned to (JG)8/27/20148/27/20149/9/2014 PASS
DetailsJavier Guzman
1st review completed, 9/12 F L2 Hillside ePlan*
Routing - PLAN CHECK9/8/2014 9/9/2014 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/9/2014 DONE
Routing - PLAN CHECK9/4/2014 9/8/2014 FAIL
DetailsJavier Guzman
1st review completed  9/4/2014 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/27/2014 9/4/2014 FAIL
DetailsJavier Guzman
ePlan
Routing - FIRE8/27/20148/27/20149/2/2014 PASS
DetailsScott Arellano
This property has been evaluated for Fire Department Vehicle Access.
Routing PW Grading-Hillside8/27/2014 8/29/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Routing - MECHANICAL8/27/2014 8/28/2014 PASS
DetailsTroy James
Routing - PLANNING8/27/2014 8/28/2014 PASS
DetailsSue Cummings
Routing - Addressing8/27/2014 8/28/2014 PASS
DetailsEmily Dixon
Routing - PUBLIC WORKS8/27/2014 8/28/2014 PASS
DetailsJennifer Bruner
Routing - Erosion and Sediment8/27/2014 8/28/2014 PASS
DetailsEvan Jenkins
Plans ACCEPTED BY PLAN TECH  8/27/2014 DONE
DetailsChristina Prado
Intake Approval  8/27/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  8/27/2014 DONE
DetailsChristina Prado
Application received  8/19/2014 DONE
Application submitted via PDS Online on Aug 19 2014 10:22AM