Permit Information
Permit NumberBLD14-02406
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1105 S LA POINTE ST
Project NameWest Sherwood Apartments
Customer Number 
ePlanReviewNo
Description
VISTA EAST (formerly known as West Sherwood Apartments) - Building 3 - To construct a 23,830 square foot, three story, wood framed apartment building with a fitness center, club room and outdoor patio area on the first leve.. This building contains 20 living units. This building is being constructed on a three-hour fire-resistive concrete podium above a one story concrete parking garage building. This apartment building is being divided into three buildings by two fire walls. This building is being sprinklered with an NFPA 13 system. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  7/22/2016 DONE
Print Statement  12/22/2015 DONE
CHANGE STATUS TO (FNL)  12/18/2015 DONE
DetailsChristina Prado
Made RDY by mistake after final inspections and CO was issued
Permit Ready to Issue  11/20/2015 DONE
Case Summary (BLD)  11/20/2015 DONE
Permanent Occupancy  10/27/2015 DONE
BLD-Final10/21/201510/22/201510/22/2015APASS
DetailsDave Hannah
Abel Phone #: ###-####
Zoning Approval10/21/201510/21/201510/21/2015 DONE
DetailsAndrea Tuning
BLD-Aging Inspection9/30/20159/30/20159/30/2015 PEND
DetailsDave Hannah
Temporary Occupancy7/31/201510/29/20157/31/2015 DONE
DetailsChristina Prado
BLD-Conference7/29/20157/29/20157/29/2015APASS
DetailsDave Hannah
Confirmed with electrical contractor and engineer that the fire alarm system wiring has been extended to a point within the units and is available for upgrade when necessary to sustain visual notification for rooms occupied by hearing impaired tenants. ICC A117.1-2009 section 1006.2 and 1006.3.
FIRE-Final Inspection7/23/20157/24/20157/24/2015APASS
DetailsJim Page
Temporary occupancy approved for life fire safety, verbally confirmed with electrical contractor that the fire alarm system has capability to sustain visual notification for rooms occupied by hearing impaired tenants. Electrical contractor needs to provide information on heat tape used on fire sprinkler system before final sign off can occur.

*Above item confirmed* - 325
BLD-Final7/23/20157/24/20157/24/2015PPEND
DetailsDave Hannah
Walk for final Phone #: ###-#### Inspection requested via web by Julian Lopez. Needs other trades ot go perm occ needs to install perm signage, type A ada units need to meet ansi 117.1 chapter 10 section 1006. ok for temp occ.
BLD-Conference7/14/20157/14/20157/15/2015PDONE
DetailsDave Hannah
Julian Phone #: ###-####
Print Occupancy Form  7/14/2015 DONE
BLD-Ceiling Grid Inspection6/17/20156/17/20156/18/2015PPASS
DetailsDave Hannah
ceiling grid level 2 and 3 Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Other6/2/20156/3/20156/4/2015APEND
DetailsDave Hannah
John// fire proofing for cover in Clubhouse Phone #: ###-#### ok after sprc inspection sign off
BLD-Energy code compliance5/21/20155/21/20155/21/2015PPART
DetailsDave Hannah
Clubhouse Phone #: ###-#### Inspection requested via web by Julian Lopez ok to cover alll but beams
BLD-Other5/7/20155/7/20155/8/2015PPASS
DetailsDave Hannah
level 4 Soffit inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Other5/5/20155/6/20155/6/2015PPART
DetailsDave Hannah
level 3 soffit inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance4/23/20154/24/20154/24/2015APASS
DetailsDave Hannah
Elevator insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in4/16/20154/16/20154/16/2015APASS
DetailsDave Hannah
shear wall level 2,3,4 at south stairwell by clubhouse. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance4/16/20154/16/20154/16/2015APASS
DetailsDave Hannah
Level 2 insulation and shower pan fire caulking. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Energy code compliance4/14/20154/15/20154/16/2015APART
DetailsDave Hannah
Level 3 and 4 insulation. Shear walls east of stairs Phone #: ###-#### Inspection requested via web by Julian Lopez 4th floor shear ok insulateion 3rd and 4th ok
BLD-Energy code compliance4/9/20154/9/20154/9/2015PPASS
DetailsDave Hannah
level 3 and 4 shower pan fire caulking inspection. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in4/6/20154/7/20154/7/2015APASS
DetailsDave Hannah
Framing level 2,3 and 4. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in4/3/20154/3/20154/3/2015PPASS
DetailsDave Hannah
Framing inspection. Level''s 2, 3, and 4. Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD-Framing/Rough-in2/25/20152/26/20152/26/2015APART
DetailsDave Hannah
Level 3 inside exterior framing. Phone #: ###-#### Inspection requested via web by Julian Lopez corridor ceiling and top 2ft ok to cover
BLD-Conference2/17/20152/18/20152/18/2015APART
DetailsDave Hannah
Framing inspection level 2 outer walls. Phone #: ###-#### Inspection requested via web by Julian Lopez . ok to insulate ext walls.
BLD-Framing/Rough-in1/30/20151/30/20151/30/2015PPART
DetailsDave Hannah
Check corridor framing lvl4 Phone #: ###-#### Inspection requested via web by Julian Lopez ok to insulate ceiling 4th floor corridor.
BLD-Wall Bracing1/27/20151/27/20151/27/2015APART
DetailsDave Hannah
ok to cover ext
Permit Ready to Issue  10/3/2014 DONE
DetailsCandy A. Nichols
Issue PAID IN FULL permit  10/3/2014 DONE
DetailsCandy A. Nichols
Print Occupancy Form  10/3/2014 DONE
DetailsCandy A. Nichols
Plan assigned to (JCM)8/19/2014 10/2/2014 PASS
DetailsJohn Menard
1st Review Complete 8/21/2014 - Sherwood Apartments
PLANS/APPL TAKEN TO FRONT DESK  10/2/2014 DONE
DetailsJohn Menard
1st review completed  8/21/2014 DONE
DetailsJohn Menard
Application received 8/19/2014