Permit Information
Permit NumberBLD14-02407
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5728 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2518 sq. ft., three story (first story 633 sq. ft., second story 1325 sq. ft., third story 560 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 118 sq. ft. of covered patio/porch and a 695 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-1C zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20151/28/20151/28/2015APASS
DetailsDave Hannah
Clint Phone #: ###-####
DOC - Permit Finaled1/28/20151/28/20151/28/2015PPASS
DetailsDave Hannah
PubWorks Occupancy Approval1/26/20151/26/20151/26/2015 DONE
DetailsJason C. Taylor
Project may be approved occupancy. Roof drainage is functioning. Side and rear yards need final grading. This is to be done at a later time as approve by Public Works. Jason Taylor ###-####.
BLD-Other11/24/201411/25/201411/25/2014APASS
DetailsPhil Shearer
fire sofent// clint Phone #: ###-####
BLD-Energy code compliance11/20/201411/21/201411/21/2014APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in11/18/201411/19/201411/19/2014APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other11/19/201411/19/201411/19/2014PPASS
DetailsPhil Shearer
sofit inspection OK
BLD-Wall Bracing10/21/201410/21/201410/21/2014PPASS
DetailsPhil Shearer
joey Phone #: ###-####
BLD-Foundation9/23/20149/23/20149/23/2014PPASS
DetailsPhil Shearer
Wes-pour 2:00 Phone #: ###-####
BLD-Footing9/22/20149/22/20149/22/2014PPASS
DetailsPhil Shearer
Wes- pour time is around 4pm Phone #: ###-####
PubWorks Subgrade Approval9/22/20149/22/20149/22/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  9/9/2014 DONE
DetailsChristina Prado
OVERRIDE  9/8/2014  
Telephone call  9/8/2014 DONE
left voice mail that permit is ready and told them the fees
Permit Ready to Issue  9/8/2014 DONE
Plan assigned to (JG) 8/20/20149/5/2014 PASS
DetailsJavier Guzman
1st review completed, 9/05 F L2 Hillside***
Routing - PLAN CHECK9/3/2014 9/5/2014 PASS
DetailsJavier Guzman
Plan resubmittals received  9/5/2014 DONE
received two sheets of 8.0
Case Summary (BLD)  9/5/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/5/2014 DONE
Inspection Record Card- Bld  9/5/2014 DONE
DetailsCandy A. Nichols
Routing - PLAN CHECK  9/3/2014 FAIL
DetailsJavier Guzman
emailed report to applicant
1st review completed  9/3/2014 FAIL
DetailsJavier Guzman
Routing - FIRE8/28/20148/20/20149/2/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire Department Vehicle Access.
Routing - Erosion and Sediment8/26/2014 8/28/2014 PASS
DetailsAndy J. Long
ESC plan waiver approved. Valid RP designated.
Routing - MECHANICAL8/25/2014 8/26/2014 PASS
DetailsTroy James
Routing - PLANNING8/22/2014 8/25/2014 PASS
DetailsJoshua Johnson
Routing - PUBLIC WORKS8/21/2014 8/22/2014 PASS
DetailsJennifer Bruner
Route to Impact Fee Review8/19/20148/22/20148/21/2014 PASS
DetailsDonna Wolf
Impact Fees determined by automatic process.
Routing - Addressing8/20/2014 8/21/2014 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside  8/21/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Plans ACCEPTED BY PLAN TECH  8/20/2014 DONE
DetailsChristina Prado
Intake Approval  8/20/2014 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/20/2014 DONE
DetailsChristina Prado
Application received 8/19/2014