Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD14-02408
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5706 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2485 sq. ft., three story (first story 633 sq. ft., second story 1296 sq. ft., third story 560 sq. ft.) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 292 sq. ft. of covered patio/porch and a 700 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-1C zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/12/20153/12/20153/12/2015APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Blower Door Test Results3/12/20153/12/20153/12/2015PPASS
DetailsPhil Shearer
3.39
DOC - Permit Finaled3/12/20153/12/20153/12/2015PPASS
DetailsPhil Shearer
PubWorks Occupancy Approval3/11/20153/11/20153/11/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Wall Bracing1/14/20151/15/20151/15/2015APASS
DetailsPhil Shearer
Clint Phone #: ###-####
BLD-Energy code compliance1/8/20151/12/20151/12/2015APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in1/7/20151/8/20151/8/2015APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other12/17/201412/18/201412/18/2014APASS
DetailsPhil Shearer
Clint-soffit Phone #: ###-####
BLD-Wall Bracing12/4/201412/4/201412/4/2014PPASS
DetailsPhil Shearer
Rudy Phone #: ###-####
BLD-Foundation9/25/20149/25/20149/25/2014PPASS
DetailsPhil Shearer
BLD-Footing9/24/20149/24/20149/24/2014PPASS
DetailsPhil Shearer
pouring at 2:30 // Wes Phone #: ###-####
PubWorks Subgrade Approval9/22/20149/22/20149/22/2014 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  9/9/2014 DONE
OVERRIDE  9/8/2014  
Telephone call  9/8/2014 DONE
Permit Ready to Issue  9/8/2014 DONE
Plan assigned to (JG) 8/20/20149/5/2014 PASS
DetailsJavier Guzman
1st review completed, 9/05 F L2 Hillside***
Routing - PLAN CHECK9/3/2014 9/5/2014 PASS
DetailsJavier Guzman
Plan resubmittals received  9/5/2014 DONE
received two sheets of 8.0
Case Summary (BLD)  9/5/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/5/2014 DONE
Inspection Record Card- Bld  9/5/2014 DONE
DetailsCandy A. Nichols
Routing - PLAN CHECK  9/3/2014 FAIL
DetailsJavier Guzman
emailed review report to applicant
1st review completed  9/3/2014 FAIL
DetailsJavier Guzman
Routing - FIRE8/28/20148/20/20149/2/2014 PASS
DetailsScott Arellano
This structure has been evaluated for Fire Department vehicle Access.
Routing - Erosion and Sediment8/26/2014 8/28/2014 PASS
DetailsAndy J. Long
ESC plan waiver approved. Valid RP designated.
Routing - MECHANICAL8/25/2014 8/26/2014 PASS
DetailsTroy James
Routing - PLANNING8/22/2014 8/25/2014 PASS
DetailsJoshua Johnson
Routing - PUBLIC WORKS8/21/2014 8/22/2014 PASS
DetailsJennifer Bruner
Route to Impact Fee Review8/19/20148/22/20148/21/2014 PASS
DetailsDonna Wolf
Impact fees determined by automatic process.
Routing - Addressing8/20/2014 8/21/2014 PASS
DetailsJason C. Taylor
Routing PW Grading-Hillside  8/21/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Plans ACCEPTED BY PLAN TECH  8/20/2014 DONE
DetailsChristina Prado
Intake Approval  8/20/2014 PASS
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  8/20/2014 DONE
DetailsChristina Prado
Application received 8/19/2014