BLD-Final | 3/12/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Phil Shearer
|
|
|
3.39
|
DOC - Permit Finaled | 3/12/2015 | 3/12/2015 | 3/12/2015 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 3/11/2015 | 3/11/2015 | 3/11/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Wall Bracing | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
BLD-Energy code compliance | 1/8/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 1/7/2015 | 1/8/2015 | 1/8/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Other | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Phil Shearer
|
|
|
Clint-soffit Phone #: ###-####
|
BLD-Wall Bracing | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Phil Shearer
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 9/25/2014 | 9/25/2014 | 9/25/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | PASS |
Phil Shearer
|
|
|
pouring at 2:30 // Wes Phone #: ###-####
|
PubWorks Subgrade Approval | 9/22/2014 | 9/22/2014 | 9/22/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 9/9/2014 | | DONE |
|
|
|
|
OVERRIDE | | | 9/8/2014 | | |
|
|
|
|
Telephone call | | | 9/8/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2014 | | DONE |
|
|
|
|
Plan assigned to (JG) | | 8/20/2014 | 9/5/2014 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/05 F L2 Hillside***
|
Routing - PLAN CHECK | 9/3/2014 | | 9/5/2014 | | PASS |
Javier Guzman
|
|
|
|
Plan resubmittals received | | | 9/5/2014 | | DONE |
|
|
|
received two sheets of 8.0
|
Case Summary (BLD) | | | 9/5/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - PLAN CHECK | | | 9/3/2014 | | FAIL |
Javier Guzman
|
|
|
emailed review report to applicant
|
1st review completed | | | 9/3/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/28/2014 | 8/20/2014 | 9/2/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for Fire Department vehicle Access.
|
Routing - Erosion and Sediment | 8/26/2014 | | 8/28/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP designated.
|
Routing - MECHANICAL | 8/25/2014 | | 8/26/2014 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/22/2014 | | 8/25/2014 | | PASS |
Joshua Johnson
|
|
|
|
Routing - PUBLIC WORKS | 8/21/2014 | | 8/22/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Route to Impact Fee Review | 8/19/2014 | 8/22/2014 | 8/21/2014 | | PASS |
Donna Wolf
|
|
|
Impact fees determined by automatic process.
|
Routing - Addressing | 8/20/2014 | | 8/21/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing PW Grading-Hillside | | | 8/21/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/20/2014 | | PASS |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/20/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/19/2014 | | | |
|
|
|
|