Routing PW Grading-Hillside | 8/31/2016 | | 8/31/2016 | | PASS |
Jason C. Taylor
|
|
|
Updated grading plans submitted for approval. Plans approved for construction. JCT
|
Routing PW Grading-Hillside | 8/23/2016 | | 8/23/2016 | | PASS |
Jason C. Taylor
|
|
|
Recieved new drainage plans. Plans approved for construction.
|
BLD-Final | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Phil Shearer
|
|
|
|
PubWorks Occupancy Approval | 3/31/2016 | 3/31/2016 | 3/31/2016 | | DONE |
Jason C. Taylor
|
|
|
Bond Posted for site improvements. JCT
|
BLD-Final | 3/15/2016 | 3/16/2016 | 3/16/2016 | A | NR |
Phil Shearer
|
|
|
Justin Phone #: ###-####. Waiting on grading bond
|
ACHD Occupancy Approval | 10/6/2015 | 10/6/2015 | 3/14/2016 | | DONE |
Phil Shearer
|
|
|
Do not final until or issue LC until ACHD fees are paid in full. See Rita if you have questions. FEES PAID
|
BLD-Final | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | NR |
Jim Storey
|
|
|
Please call me before so I can meet you there
Thank you Phone #: ###-#### Inspection requested via web by Justin Ellett no insp. need pw insp.
|
BLD-Footing | 2/29/2016 | 3/1/2016 | 3/1/2016 | P | PASS |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
BLD-Conference | 1/21/2016 | 1/22/2016 | 1/22/2016 | A | PASS |
Phil Shearer
|
|
|
Exterior soffit sheetrock - Justin Phone #: ###-####
|
BLD-Conference | 1/21/2016 | 1/21/2016 | 1/21/2016 | P | NR |
Phil Shearer
|
|
|
Exterior soffit sheetrock - Justin Phone #: ###-####
|
BLD-Conference | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | FAIL |
Phil Shearer
|
|
|
Exterior soffit sheetrock - Justin Phone #: ###-####
|
BLD-Energy code compliance | 1/13/2016 | 1/14/2016 | 1/14/2016 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2016 | 1/8/2016 | 1/8/2016 | P | PART |
Phil Shearer
|
|
|
Justin Phone #: ###-####. Truss bracing, Fire blocking above fireplace, Screws in connetion at grid 7. OK to insulate.
|
BLD-Conference | 12/15/2015 | 12/16/2015 | 12/16/2015 | A | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-#### insulation at roof above vault ok
|
BLD-Wall Bracing | 10/20/2015 | 10/20/2015 | 10/20/2015 | P | PASS |
Phil Shearer
|
|
|
Justin Phone #: ###-####
|
BLD-Foundation | 8/4/2015 | 8/5/2015 | 8/5/2015 | A | PASS |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 7/8/2015 | 7/9/2015 | 7/9/2015 | P | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. INterior and exterior footings only except at stepped footing areas and retaining wall.
|
PubWorks Subgrade Approval | 7/7/2015 | 7/7/2015 | 7/7/2015 | | DONE |
Jason C. Taylor
|
|
|
* INTERIOR AND EXTERIOR FOOTINGS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/2/2015 | 7/6/2015 | 7/6/2015 | A | CANC |
Phil Shearer
|
|
|
Matt Phone #: ###-####
|
Telephone call | | | 6/15/2015 | | DONE |
|
|
|
called Jeff to let know fees are stll due for ACHD-i gave him the fee amount and gave him ACHD's phone # so they can explain why the fees are more
|
Issue PAID IN FULL permit | | | 6/10/2015 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/10/2015 | | DONE |
|
|
|
|
OVERRIDE | | | 4/6/2015 | | |
|
|
|
|
Plan assigned to (JG) | 9/17/2014 | 9/17/2014 | 4/6/2015 | | PASS |
Javier Guzman
|
|
|
1st review completed, 09/29 M L2 Hillside ePlan**
|
Routing - Erosion and Sediment | 4/6/2015 | | 4/6/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance). New Single Family Home and landscaping to be conducted.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/6/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/6/2015 | | DONE |
|
|
|
NEED RP
|
Extend Review Timeline | | | 2/26/2015 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 2/25/2015 | | DONE |
Javier Guzman
|
|
|
Sent 180 day letter to applicant on file 2/25/2015
|
Routing - Erosion and Sediment | 2/5/2015 | | 2/5/2015 | | FAIL |
Evan Jenkins
|
|
|
FAIL: FULL ESC NARRATIVE AND SITE MAPS REQUIRED PER CHAPTER 8-17 ESC ORDINANCE
|
Routing - PLAN CHECK | 2/5/2015 | | 2/5/2015 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 1/21/2015 | | 2/4/2015 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - MECHANICAL | 1/27/2015 | | 1/27/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 1/22/2015 | | 1/22/2015 | | PASS |
Cody Riddle
|
|
|
Okay per revised plans and letter submitted 1/22/15, and attached to ePlan Review.
|
Routing - MECHANICAL | 1/21/2015 | | 1/21/2015 | | FAIL |
Troy James
|
|
|
emailed building energy to make changes with window and door placement to match the changes on the submitted plans
|
Routing PW Grading-Hillside | 1/21/2015 | | 1/21/2015 | | PASS |
Jason C. Taylor
|
|
|
*REVISED DRAINAGE PLAN**A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 1/21/2015 | | 1/21/2015 | | FAIL |
Javier Guzman
|
|
|
Modification to floor plans
|
Routing - PLANNING | 1/21/2015 | | 1/21/2015 | | FAIL |
Cody Riddle
|
|
|
Fail: Revised plans include eaves and patio within setback. Spoke with applicant/architect today.
|
Routing - Erosion and Sediment | 1/20/2015 | | 1/20/2015 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative and ESC Site Map Required describing all work and locations of BMP's per Chapter 8-17 Erosion Control Ordiance, for review and approval. EJ 794.3958
|
Routing - PLAN CHECK | 10/8/2014 | | 10/15/2014 | | PASS |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 10/15/2014 | | 10/15/2014 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative Required For Approval. Only Site Map has been submitted. Contacted Steve Trout to disclose this issue. I showed him in Chapter 8-17 the City's ESC Narrative Requirements, and he stated he will work on it.
|
Routing - PLAN CHECK | 9/30/2014 | | 10/8/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - Erosion and Sediment | 10/7/2014 | | 10/7/2014 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative Required. Must be developed/drafted by Certified Plan Designer through the City of Boise's Plan Designer Course
|
Routing - PLAN CHECK | 9/17/2014 | | 9/30/2014 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
1st review completed | | | 9/30/2014 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 9/17/2014 | | 9/29/2014 | | PASS |
Joshua Johnson
|
|
|
signed off in ePlan review by Josh Johnson
|
Routing - FIRE | 9/23/2014 | 9/23/2014 | 9/24/2014 | | PASS |
Scott Arellano
|
|
|
Attached Fire Comments to case and plans.
|
Plan resubmittals received | | | 9/23/2014 | | DONE |
Scott Arellano
|
|
|
Recieved response letter from applicant indicating the proposed residence will be fire sprinklered in accordance with NFPA 13D.
|
Routing PW Grading-Hillside | 9/17/2014 | | 9/23/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 9/17/2014 | 9/17/2014 | 9/22/2014 | | FAIL |
Scott Arellano
|
|
|
Emailed plan review report to architect.
|
Routing - MECHANICAL | 9/22/2014 | | 9/22/2014 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 9/17/2014 | | 9/18/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 9/17/2014 | | 9/18/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 9/17/2014 | | 9/18/2014 | | FAIL |
Evan Jenkins
|
|
|
Full ESC Narrative and Site Maps Required For Approval.
|
Intake Approval | | | 9/17/2014 | | PASS |
|
|
|
|
Routing - MECHANICAL | 9/17/2014 | | 9/17/2014 | | FAIL |
Troy James
|
|
|
|
Intake Approval | | | 9/11/2014 | | FAIL |
Candy A. Nichols
|
|
|
need ACCA
|
Routing PW Grading-Hillside | 8/25/2014 | | 8/25/2014 | | FAIL |
Jason C. Taylor
|
|
|
This project will require P&Z CAT II approval prior to building permit acceptance. Jason Taylor ###-####.
|
Application received | | | 8/21/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 21 2014 11:50AM
|