First Notice | 4/8/2016 | 4/8/2016 | 4/12/2016 | | DONE |
Mike Jordan
|
|
|
Mailed 4-13-16
|
BLD-Final | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Mike Jordan
|
|
|
Brian Phone #: ###-####
|
DOC - Permit Finaled | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Plan Reviewer's activity | | | 3/25/2016 | | PASS |
|
|
|
Had a conference with Jerry ONeal, FPE. I explained to him both NFPA and FM would seem to treat this project as Group A plastics. However, IFC: 2012: 3203.5 would seem to treats this hazard as a Class IV commodtiy. Therefore, the existing Class IV sprinklers system was adequate. We did decided to add column sprinklers. 4/08/2016 TRF
|
BLD-Final | 2/23/2016 | 2/24/2016 | 2/24/2016 | A | NR |
Mike Jordan
|
|
|
Wade Phone #: ###-####. Fire/life/safety final failed. The structural final was performed, no issues noted. Also reviewed special inspection inspection report for anchor installation. Will be ok to use racks once fire/life/safetty issues have been resolved.
|
FIRE-Final Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Troy Cobbley
|
|
|
Relocate the fire extinguisher as discussed and per plan review an updated fire sprinkler analysis is required for the racking permit.
|
CHANGE STATUS TO (ISS) | | | 11/25/2014 | | DONE |
|
|
|
|
Plan assigned to (AJS) | 11/18/2014 | 11/18/2014 | 11/21/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 11/21/2014 | | 11/21/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 11/21/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Telephone call | | | 11/21/2014 | | DONE |
Candy A. Nichols
|
|
|
called Wade to let know plan mod is ready and how much is owed
|
Permit Ready to Issue | | | 11/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Bld | | | 11/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan Modification Accepted | | | 11/18/2014 | | DONE |
Candy A. Nichols
|
|
|
received permit app to change the beam levels in (3) different confirgurationns with no change on the layout in the warehouse, 2 engineering calcs,3 sheets of 14-1801-A & 14-1801-B and took to Adele
|
Plan assigned to (AJS) | 8/22/2014 | 8/22/2014 | 9/15/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st Building Review completedLevel 2 TI - Paper - Racking - Merchants Moving & Storage
|
Application received | | 8/21/2014 | 9/15/2014 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/9/2014 | | 9/15/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Case Summary (BLD) | | | 9/15/2014 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/15/2014 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/15/2014 | | DONE |
Tisha Gallop
|
|
|
called Wade Zurcher and told him permit is ready, fee due and need GC form.
|
Issue PAID IN FULL permit | | | 9/15/2014 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 9/8/2014 | 9/8/2014 | 9/9/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-09-14
|
1st review completed | | | 9/9/2014 | | DONE |
|
|
|
Failed: Plan Check
|
Routing - PLAN CHECK | 8/22/2014 | | 9/8/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
see plan review letter
|
Pending Assignment by JCB | 8/21/2014 | | 8/22/2014 | | DONE |
Jason Blais
|
|
|
|
Routing - FIRE | 8/21/2014 | 8/21/2014 | 8/21/2014 | | PASS |
Tim Frost
|
|
|
Prescreen only. Spoke with Wade in regards to racking intake. He produce a sprinkler evaluation from Shilo Automatic Sprinkler, Inc. Randy Knuston. The existing system is apparently design for 16' high storage of class IV commodity. He was not totally sure what will be stored. I explained in depth class IV commodiy. I gave him a copy of 5.6 from NFPA 13 describing class IV commodity. He assured me the storage would be limited to class IV commodity (existing design). I approved, the intake.
|
Intake Approval | | | 8/21/2014 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/21/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/21/2014 | | DONE |
Christina Prado
|
|
|
|