Second Notice | | 6/20/2015 | 6/18/2015 | | DONE |
Christina Prado
|
|
|
|
First Notice | | 5/30/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
PubWorks Occupancy Approval | 5/21/2015 | 5/21/2015 | 5/21/2015 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 5/20/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Jim Storey
|
|
|
Late as possible - Mike Phone #: ###-####
|
FIRE-Final Inspection | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | PASS |
Thomas Walsh
|
|
|
Fire Life-safety inspection for new medical office building. Fire alarm and fire sprinklers were finaled. All other FLS systems inspected OK. Bldg Dept. permit signed off.
|
Permanent Occupancy | | | 5/20/2015 | | DONE |
|
|
|
|
BLD-Final | 5/14/2015 | 5/15/2015 | 5/15/2015 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### temp ok pending others.
|
FIRE-Final Inspection | 5/14/2015 | 5/15/2015 | 5/15/2015 | P | PART |
Katie Marron
|
|
|
Completed inspection on exit hardware, fire extinguishers, emergency lighting, street address. Fire alarm for sprinkler monitoring was not ready, need to test flows/tampers and duct detector.
|
Zoning Approval | 5/13/2015 | 5/13/2015 | 5/13/2015 | | PASS |
Josh Wilson
|
|
|
|
Print Occupancy Form | | | 5/11/2015 | | DONE |
|
|
|
|
FIRE-Conference | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | DONE |
Katie Marron
|
|
|
Walk through with Mike. Discussed life safety items to include exit signs, door hardware, fire extinguishers. Also discussed need for sprinkler underground flush, rough-in and hydrostatic test inspections.
|
BLD-Ceiling Grid Inspection | 5/5/2015 | 5/6/2015 | 5/6/2015 | A | PASS |
Jim Storey
|
|
|
East Half ONLY; Mike Phone #: ###-#### pending fire aproval.
|
BLD-Energy code compliance | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Jim Storey
|
|
|
Insulation // Mike Phone #: ###-####
|
BLD-Energy code compliance | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | PASS |
Jim Storey
|
|
|
Insulation Exterior // Mike Phone #: ###-#### eastside ok
|
FIRE-Conference | 2/24/2015 | 2/25/2015 | 2/26/2015 | A | DONE |
Forrest France
|
|
|
On site conference regarding knox box location, revised floorplan at the conference/meeting rooms north side.
|
BLD-Framing/Rough-in | 2/20/2015 | 2/24/2015 | 2/24/2015 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### exterior holddowns ok/roof insulation ok/ wall framing ok wip pending trades.
|
FIRE-Conference | 2/23/2015 | 2/24/2015 | 2/24/2015 | A | DONE |
Forrest France
|
|
|
Regarding exiting, folding partitions, knox box location, etc.
|
BLD-Framing/Rough-in | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### exterior sheer wip ok
|
BLD-Concrete | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | PASS |
Phil Shearer
|
|
|
Rebar - First thing please - Mike Phone #: ###-####
|
BLD-Foundation | 12/9/2014 | 12/10/2014 | 12/10/2014 | A | PASS |
Dave Hannah
|
|
|
Mike-stem wall-pour time 1:00 Phone #: ###-####
|
BLD-Foundation | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Phil Shearer
|
|
|
rebar//Mike Phone #: ###-####. Footing south east corner of building, stem wall south west corner of builing and interior column footings. OK pending MTI inspection report.
|
BLD-Foundation | 11/25/2014 | 11/26/2014 | 11/27/2014 | A | PASS |
Phil Shearer
|
|
|
rebar//mike Phone #: ###-#### 2nd half of footing and 1st half of the stem wall
|
BLD-Footing | 11/20/2014 | 11/21/2014 | 11/21/2014 | P | PASS |
Jim Storey
|
|
|
rebar, before one if possible// mike Phone #: ###-#### si on site half placment of ft ok
|
Issue PAID IN FULL permit | | | 10/16/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 10/16/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 10/8/2014 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/2/2014 | | 10/8/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/2/2014 | | 10/8/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
pending structural approval
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2014 | | DONE |
Christina Prado
|
|
|
Pending ACHD
|
Plan assigned to (AJS) | 8/27/2014 | | 10/8/2014 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed New Building Retail West Bown Clinic Buildi
|
Routing - FIRE | 10/2/2014 | 10/2/2014 | 10/3/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review Rev 1 10-03-14
|
Route to Impact Fee Review | 9/19/2014 | 9/22/2014 | 9/23/2014 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 9/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/27/2014 | | 9/18/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 8/27/2014 | | 9/15/2014 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 8/27/2014 | | 9/10/2014 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING Land Div | 8/27/2014 | | 9/9/2014 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Solid Waste | 8/27/2014 | | 9/9/2014 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Environmental | 8/27/2014 | | 9/9/2014 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 8/27/2014 | | 9/5/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-05-14
|
Routing - Design Review | 8/27/2014 | | 9/2/2014 | | PASS |
Josh Wilson
|
|
|
Ok per DRH14-00275
|
Routing - Erosion and Sediment | 8/27/2014 | | 8/28/2014 | | PASS |
Evan Jenkins
|
|
|
|
Routing PW Street Lights | 8/27/2014 | | 8/27/2014 | | PASS |
Mike D Hedge
|
|
|
No new street lighting required.
|
Routing PW Sewer Design | 8/27/2014 | | 8/27/2014 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Sewer Rating | 8/27/2014 | | 8/27/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Intake Approval | | | 8/27/2014 | | PASS |
John Menard
|
|
|
|
Routing - Addressing | 8/27/2014 | | 8/27/2014 | | PASS |
Emily Dixon
|
|
|
|
Routing - PUBLIC WORKS | 8/27/2014 | | 8/27/2014 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLUMBING | 8/27/2014 | | 8/27/2014 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Application received | | | 8/25/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 25 2014 11:43AM
|
Pending Assignment by JCM | 8/27/2014 | | | | |
John Menard
|
|
|
|