Permit Information
Permit NumberBLD14-02511
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5720 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class A Roof, Permit for the construction of a new 2390 sq. ft., two story (first story 1106 sq. ft., second story 1284 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 210 sq. ft. of covered patio/porch and a 629 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-1C zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/22/20156/22/20156/22/2015PPASS
DetailsPhil Shearer
Clint Phone #: ###-####
DOC - Permit Finaled6/22/20156/22/20156/22/2015PPASS
DetailsPhil Shearer
BLD-Final6/18/20156/22/20156/22/2015ANR
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
PubWorks Occupancy Approval6/18/20156/18/20156/18/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance4/23/20154/27/20154/27/2015APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in4/21/20154/23/20154/23/2015APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other4/13/20154/13/20154/13/2015PPASS
DetailsPhil Shearer
fire sofet // Clint Phone #: ###-####
BLD-Wall Bracing4/1/20154/2/20154/2/2015APASS
DetailsPhil Shearer
Rudy Phone #: ###-####
BLD-Foundation2/24/20152/24/20152/24/2015PPASS
DetailsPhil Shearer
Pour time 1:30 Phone #: ###-#### Inspection requested via web by tony L
BLD-Footing2/23/20152/23/20152/23/2015PPASS
DetailsPhil Shearer
Pour time 3:30 Phone #: ###-#### Inspection requested via web by tony L
PubWorks Subgrade Approval2/20/20152/20/20152/20/2015 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  1/23/2015 DONE
OVERRIDE  9/12/2014  
Telephone call  9/12/2014 DONE
DetailsChristina Prado
called Tahoe to advise permit is ready and gave fees due
Permit Ready to Issue  9/12/2014 DONE
DetailsChristina Prado
Plan assigned to (JG) 8/26/20149/11/2014 PASS
DetailsJavier Guzman
9/11 TH L2 Hillside**
Routing - PLAN CHECK9/10/2014 9/11/2014 PASS
DetailsJavier Guzman
1st review completed  9/11/2014 DONE
DetailsJavier Guzman
Case Summary (BLD)  9/11/2014 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/11/2014 DONE
Inspection Record Card- Bld  9/11/2014 DONE
DetailsCandy A. Nichols
Routing - FIRE9/10/20148/26/20149/10/2014 PASS
DetailsScott Arellano
This project has been reviewed for Fire Department Vehicle Access.
Routing - Erosion and Sediment9/9/2014 9/10/2014 PASS
DetailsEvan Jenkins
Waiver Request Approved due to prevous Agreement made with Kim Johnson and Tahoe Homes. Relatively flat lot
Routing - MECHANICAL9/2/2014 9/9/2014 PASS
DetailsTroy James
Plan resubmittals received  9/5/2014 DONE
received two sheets of 5.0
Routing - PLANNING8/27/2014 9/2/2014 PASS
DetailsJoshua Johnson
Route to Impact Fee Review8/26/20148/29/20148/27/2014 PASS
DetailsDonna Wolf
Impact fees assessed automatically.
Routing - Addressing8/26/2014 8/27/2014 PASS
DetailsJason C. Taylor
Routing - PUBLIC WORKS5/27/2014 8/27/2014 PASS
DetailsJennifer Bruner
Routing PW Grading-Hillside  8/27/2014 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plans ACCEPTED BY PLAN TECH  8/26/2014 DONE
DetailsChristina Prado
Intake Approval  8/26/2014 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  8/26/2014 DONE
DetailsChristina Prado
Application received 8/26/2014