BLD-Final | 2/22/2015 | 2/23/2015 | 2/23/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Blower Door Test Results | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | PASS |
Phil Shearer
|
|
|
4.6
|
PubWorks Occupancy Approval | 2/23/2015 | 2/23/2015 | 2/23/2015 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 12/9/2014 | 12/11/2014 | 12/11/2014 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 12/8/2014 | 12/9/2014 | 12/9/2014 | A | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Missing fire blocking 2nd level at the pop out next to the fire place, Missing additional wall studs for load suport for girders and trusses on all levels see stamped plans.
|
BLD-Other | 12/2/2014 | 12/3/2014 | 12/3/2014 | A | PASS |
Phil Shearer
|
|
|
fire sofent//Clint Phone #: ###-####
|
BLD-Wall Bracing | 11/17/2014 | 11/18/2014 | 11/18/2014 | A | PASS |
Phil Shearer
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Phil Shearer
|
|
|
Wes-pour time 4:30 Phone #: ###-####
|
BLD-Footing | 9/26/2014 | 9/26/2014 | 9/26/2014 | P | PASS |
Phil Shearer
|
|
|
Wes Phone #: ###-####
|
PubWorks Subgrade Approval | 9/25/2014 | 9/25/2014 | 9/25/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 9/15/2014 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 9/12/2014 | | |
|
|
|
|
Telephone call | | | 9/12/2014 | | DONE |
Christina Prado
|
|
|
called Tahoe to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 9/12/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (JG) | | 8/26/2014 | 9/11/2014 | | PASS |
Javier Guzman
|
|
|
9/11 TH L2 Hillside***
|
Routing - PLAN CHECK | | | 9/11/2014 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 9/11/2014 | | DONE |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 9/11/2014 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2014 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/11/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Routing - FIRE | 9/10/2014 | 8/26/2014 | 9/10/2014 | | PASS |
Scott Arellano
|
|
|
This structure has been evaluated for adequate fire department vehicle access.
|
Routing - Erosion and Sediment | 9/9/2014 | | 9/10/2014 | | PASS |
Evan Jenkins
|
|
|
Waiver Request Approved due to previous agreement with Kim Johnson.
Site Prep Inspection and Approval Required Prior to any Earth Disturbance.
|
Routing - MECHANICAL | 9/2/2014 | | 9/9/2014 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 9/5/2014 | | DONE |
|
|
|
received two copies of sheet 8.0
|
Routing - PLANNING | 8/27/2014 | | 9/2/2014 | | PASS |
Joshua Johnson
|
|
|
|
Route to Impact Fee Review | 8/26/2014 | 8/29/2014 | 8/27/2014 | | PASS |
Donna Wolf
|
|
|
Impact fees assessed automatically.
|
Routing - Addressing | 8/26/2014 | | 8/27/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 5/27/2014 | | 8/27/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing PW Grading-Hillside | | | 8/27/2014 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 8/26/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/26/2014 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/26/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/26/2014 | | | |
|
|
|
|