BLD-Other | 10/21/2014 | 10/22/2014 | 10/22/2014 | P | PASS |
Dave Hannah
|
|
|
rich - retaining wall Phone #: ###-####
|
BLD-Footing | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PASS |
Dave Hannah
|
|
|
Richard// pour time is 3pm Phone #: ###-####
|
PubWorks Subgrade Approval | 9/24/2014 | 9/24/2014 | 9/24/2014 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 8/27/2014 | | |
|
|
|
|
Application received | | 8/27/2014 | 8/27/2014 | | DONE |
|
|
|
|
Routing Walk-In (PW Hillside) | 8/27/2014 | 8/27/2014 | 8/27/2014 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 8/27/2014 | 8/27/2014 | 8/27/2014 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 8/27/2014 | 8/27/2014 | 8/27/2014 | A | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 8/27/2014 | 8/27/2014 | 8/27/2014 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (Erosion) | 8/27/2014 | 8/27/2014 | 8/27/2014 | A | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 8/27/2014 | | |
|
|
|
|
1st review completed | | | 8/27/2014 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/27/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 8/27/2014 | | DONE |
Tisha Gallop
|
|
|
|