Print Statement | | | 9/18/2015 | | DONE |
|
|
|
|
Third Notice | | 7/18/2015 | 7/27/2015 | | DONE |
|
|
|
This permit finaled on the web by Curtis Weedop
|
Third Notice | | 6/15/2015 | 7/13/2015 | | DONE |
|
|
|
|
Second Notice | | 5/14/2015 | 6/10/2015 | | DONE |
|
|
|
Mailed out 6-10-15
|
First Notice | | 5/1/2015 | 5/4/2015 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/21/2015 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2015 | | DONE |
|
|
|
called to see if they were ready for perm co-finals have been done they just need to come in with insp card and get the perm CO
|
BLD-Aging Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 | | PASS |
Dave Hannah
|
|
|
|
Temporary Occupancy | 1/12/2015 | 4/12/2015 | 1/12/2015 | | DONE |
Christina Prado
|
|
|
Pending MEC14-04394
|
FIRE-Final Inspection | 12/29/2014 | 12/30/2014 | 12/30/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable. Three EM lights repaired while on site.
|
BLD-Final | 12/29/2014 | 12/30/2014 | 12/30/2014 | P | PASS |
Dave Hannah
|
|
|
Ron Phone #: ###-####
|
FIRE-Conference | 12/8/2014 | 12/8/2014 | 12/8/2014 | A | DONE |
Forrest France
|
|
|
Fire sprinkler rough-in okayed for cover.
|
BLD-Ceiling Grid Inspection | 11/25/2014 | 11/25/2014 | 11/26/2014 | P | PEND |
Dave Hannah
|
|
|
Ron Phone #: ###-#### ok to install border tile
|
OVERRIDE | | | 10/31/2014 | | |
|
|
|
|
(F) Reprint permit | | | 10/31/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/31/2014 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 10/31/2014 | | DONE |
|
|
|
|
Telephone call | | | 10/31/2014 | | DONE |
Christina Prado
|
|
|
Called Andy to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 10/31/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 10/21/2014 | | 10/30/2014 | | PASS |
Tim L. Woodard
|
|
|
PLAN MODIFICATION 10-29-14 – Modification submitted to change the materials on the “Fluid Cooler Building” to smooth face CMU from brick (new engineering and details).**TLW**
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/30/2014 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 10/21/2014 | | 10/30/2014 | | PASS |
Tim L. Woodard
|
|
|
plan mod
|
Routing - PLANNING | 10/21/2014 | | 10/21/2014 | | PASS |
Josh Wilson
|
|
|
|
Plan Modification Accepted | | | 10/21/2014 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted to revise new exterior fluid cooler building materials from bick to smooth face CMU block; submitted on plan sheets A1.21, S0.01, S0.02, S1.01, S3.01, S3.02, S3.21, S3.31, S4.01, zoning certificate CZC14-00291; routed to Tim Woodard.
|
BLD-Framing/Rough-in | 10/14/2014 | 10/15/2014 | 10/15/2014 | A | PART |
Dave Hannah
|
|
|
Ron Phone #: ###-#### needs arch to resumit plans changing stud spacing from 16 inchs to 24 inchs oc ok to cover after approval
|
Issue PAID IN FULL permit | | | 10/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
OVERRIDE | | | 10/3/2014 | | |
|
|
|
|
Routing - FIRE | 10/3/2014 | 10/3/2014 | 10/3/2014 | | PASS |
Craig D. Hanson
|
|
|
See Fire Plan Review 10-03-14
|
Application received | | 8/27/2014 | 10/3/2014 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/28/2014 | | 10/3/2014 | | PASS |
Tim L. Woodard
|
|
|
1st Review Completed. Level 3 TI - Paper - St. Luke's Office
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/3/2014 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2014 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/3/2014 | | DONE |
Christina Prado
|
|
|
Called Adrienne to advise permit is ready pending Gc & RP and gave fees due
|
Permit Ready to Issue | | | 10/3/2014 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | 10/3/2014 | | 10/3/2014 | | PASS |
Tim L. Woodard
|
|
|
Approved with alternate and redlines. TLW
|
Plan resubmittals received | | | 10/2/2014 | | |
|
|
|
resubmitted two sheets of A4.33, A4.34, A5.33, A6.33, A6.34
|
1st review completed | | | 9/29/2014 | | FAIL |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 9/24/2014 | | 9/29/2014 | | FAIL |
Craig D. Hanson
|
|
|
See Fire Plan Review 09-29-14
|
Routing - PLAN CHECK | 9/8/2014 | | 9/24/2014 | | FAIL |
Tim L. Woodard
|
|
|
Refer to attached Plan Review Report. TLW
|
Routing - PUBLIC WORKS | 8/28/2014 | | 9/24/2014 | | PASS |
Jennifer Bruner
|
|
|
Approved on Routing sheet
|
Routing - Design Review | 9/8/2014 | | 9/8/2014 | | PASS |
Josh Wilson
|
|
|
Ok per CZC14-00254
|
Routing - MECHANICAL | 8/29/2014 | | 9/8/2014 | | PASS |
Troy James
|
|
|
Troy James - new mechanical including boilers and chiller
|
Routing PW Sewer Rating | 8/28/2014 | | 8/29/2014 | | PASS |
Jennifer Bruner
|
|
|
|
Routing - Erosion and Sediment | 8/29/2014 | | 8/29/2014 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. Need to designate valid RP for project.
|
Pending Assignment by JCB | 8/27/2014 | | 8/28/2014 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 8/28/2014 | | 8/28/2014 | | PASS |
Jason C. Taylor
|
|
|
|
Intake Approval | | | 8/27/2014 | | FAIL |
|
|
|
(10:00 AM) Need 3 documents. Will bring in later today.
|
Intake Approval | | | 8/27/2014 | | PASS |
|
|
|
(2:20 PM) Plan intake approved
|
Plans ACCEPTED BY PLAN TECH | | | 8/27/2014 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/27/2014 | | DONE |
Christina Prado
|
|
|
|